[AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17 #10262

Open
HAL9000 wants to merge 1 commit from docs/timeline-day-107-2026-04-17 into master
Owner

Summary

  • Updates docs/timeline.md with current milestone progress as of 2026-04-17 (Day 107)
  • Adds new schedule adherence entry for 2026-04-17 with full milestone status tables
  • Updates PlantUML gantt chart completion percentages to reflect current data
  • Updates gantt footer date and PR count (257 -> 328)

Changes

Gantt Chart Updates

  • Footer: Updated date to 2026-04-17, PR count 257 -> 328
  • today is marker updated to 2026-04-17
  • Added Day 107 GANTT CHART UPDATE LOG entry
  • M3 (v3.2.0): 28% -> 25% (968 open / 323 closed)
  • M4 (v3.3.0): 46% -> 35% (220 open / 118 closed)
  • M5 (v3.4.0): 40% -> 36% (286 open / 158 closed)
  • M6 (v3.5.0): 17% -> 18% (1130 open / 247 closed)
  • LARGE (v3.7.0): 35% -> 42% (608 open / 438 closed)
  • SEC (v3.8.0): 80% -> 28% (367 open / 144 closed)

New Schedule Adherence Entry (Day 107 - 2026-04-17)

  • v3.0.0: CLOSED (100%) - 0 open / 164 closed
  • v3.1.0: CLOSED (100%) - 0 open / 108 closed
  • v3.2.0: OPEN - 968 open / 323 closed = 25.0% complete
  • v3.3.0: OPEN - 220 open / 118 closed = 34.9% complete
  • v3.4.0: OPEN - 286 open / 158 closed = 35.6% complete
  • v3.5.0: OPEN - 1130 open / 247 closed = 17.9% complete
  • v3.6.0: OPEN - 332 open / 162 closed = 32.8% complete
  • v3.7.0: OPEN - 608 open / 438 closed = 41.9% complete
  • v3.8.0: OPEN - 367 open / 144 closed = 28.2% complete
  • v3.9.0: OPEN - 40 open / 24 closed = 37.5% complete

Relevant Announcements Noted

  • AUTO-BUG-SUP frozen alert (issue #10222, Priority/High)
  • PR Merge Pool: 328 open PRs, 5 stale approved, 12 stale with conflicts (issue #10208)
  • Product Builder targeting v3.2.0 through v3.7.0 (issue #10201)
  • System Watchdog Cycle 2: CI pipeline SUCCESS (issue #10194)

Automated by CleverAgents Bot
Supervisor: Timeline Update Worker | Agent: AUTO-TIME-1

## Summary - Updates `docs/timeline.md` with current milestone progress as of 2026-04-17 (Day 107) - Adds new schedule adherence entry for 2026-04-17 with full milestone status tables - Updates PlantUML gantt chart completion percentages to reflect current data - Updates gantt footer date and PR count (257 -> 328) ## Changes ### Gantt Chart Updates - Footer: Updated date to 2026-04-17, PR count 257 -> 328 - `today is` marker updated to 2026-04-17 - Added Day 107 GANTT CHART UPDATE LOG entry - M3 (v3.2.0): 28% -> 25% (968 open / 323 closed) - M4 (v3.3.0): 46% -> 35% (220 open / 118 closed) - M5 (v3.4.0): 40% -> 36% (286 open / 158 closed) - M6 (v3.5.0): 17% -> 18% (1130 open / 247 closed) - LARGE (v3.7.0): 35% -> 42% (608 open / 438 closed) - SEC (v3.8.0): 80% -> 28% (367 open / 144 closed) ### New Schedule Adherence Entry (Day 107 - 2026-04-17) - v3.0.0: CLOSED (100%) - 0 open / 164 closed - v3.1.0: CLOSED (100%) - 0 open / 108 closed - v3.2.0: OPEN - 968 open / 323 closed = 25.0% complete - v3.3.0: OPEN - 220 open / 118 closed = 34.9% complete - v3.4.0: OPEN - 286 open / 158 closed = 35.6% complete - v3.5.0: OPEN - 1130 open / 247 closed = 17.9% complete - v3.6.0: OPEN - 332 open / 162 closed = 32.8% complete - v3.7.0: OPEN - 608 open / 438 closed = 41.9% complete - v3.8.0: OPEN - 367 open / 144 closed = 28.2% complete - v3.9.0: OPEN - 40 open / 24 closed = 37.5% complete ### Relevant Announcements Noted - AUTO-BUG-SUP frozen alert (issue #10222, Priority/High) - PR Merge Pool: 328 open PRs, 5 stale approved, 12 stale with conflicts (issue #10208) - Product Builder targeting v3.2.0 through v3.7.0 (issue #10201) - System Watchdog Cycle 2: CI pipeline SUCCESS (issue #10194) --- **Automated by CleverAgents Bot** Supervisor: Timeline Update Worker | Agent: AUTO-TIME-1
[AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17
All checks were successful
CI / push-validation (pull_request) Successful in 10s
CI / lint (pull_request) Successful in 20s
CI / helm (pull_request) Successful in 25s
CI / quality (pull_request) Successful in 34s
CI / typecheck (pull_request) Successful in 44s
CI / security (pull_request) Successful in 45s
CI / build (pull_request) Successful in 3m16s
CI / unit_tests (pull_request) Successful in 3m33s
CI / e2e_tests (pull_request) Successful in 4m21s
CI / docker (pull_request) Successful in 1m28s
CI / integration_tests (pull_request) Successful in 7m29s
CI / coverage (pull_request) Successful in 8m10s
CI / status-check (pull_request) Successful in 0s
9ec80d409e
HAL9000 added this to the v3.9.0 milestone 2026-04-18 07:57:09 +00:00
Author
Owner

[GROOMED] Quality Analysis Complete

Analysis Summary

PR Details

  • Title: [AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17
  • Type: Documentation Update
  • Status: Open, never groomed
  • Created: 2026-04-17T15:59:36Z
  • Changes: 112 additions, 9 deletions in docs/timeline.md

Findings

Completed Actions:

  1. Assigned to milestone: v3.9.0 (documentation and feature updates)
  2. Identified required labels:
    • State/In Review - PR is open and ready for review
    • Type/Documentation - This is a documentation update
    • Priority/Medium - Reasonable default for timeline updates

⚠️ Issues Identified:

  1. No labels applied - PR had no labels (violates CONTRIBUTING.md requirement)
  2. No milestone assigned - PR had no milestone (violates CONTRIBUTING.md requirement) FIXED
  3. No issue reference - PR description does not reference a related issue with "Closes #N"
  4. No assignee - PR is unassigned

Quality Assessment

Compliance with CONTRIBUTING.md:

  • State/ label: MISSING (should be State/In Review)
  • Type/ label: MISSING (should be Type/Documentation)
  • Priority/ label: MISSING (should be Priority/Medium)
  • Milestone: ASSIGNED (v3.9.0)
  • Issue reference: MISSING (no "Closes #N" in description)

Content Quality:

  • Well-structured summary
  • Clear changelog of updates
  • Proper bot signature
  • Milestone status tables included
  • Relevant announcements noted

Recommendations

  1. Add labels (requires manual action or label API access):

    • State/In Review
    • Type/Documentation
    • Priority/Medium
  2. Link to related issue (if applicable):

    • Update PR description to include "Closes #XXXX" if there is a related timeline tracking issue
  3. Consider assigning to a team member for review

Status

  • Milestone: Applied (v3.9.0)
  • Labels: ⚠️ Requires manual application or API access
  • Ready for review: Yes

Automated by CleverAgents Bot
Supervisor: Grooming | Agent: grooming-pool-supervisor

[GROOMED] Quality Analysis Complete ## Analysis Summary ### PR Details - **Title**: [AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17 - **Type**: Documentation Update - **Status**: Open, never groomed - **Created**: 2026-04-17T15:59:36Z - **Changes**: 112 additions, 9 deletions in docs/timeline.md ### Findings ✅ **Completed Actions:** 1. Assigned to milestone: **v3.9.0** (documentation and feature updates) 2. Identified required labels: - **State/In Review** - PR is open and ready for review - **Type/Documentation** - This is a documentation update - **Priority/Medium** - Reasonable default for timeline updates ⚠️ **Issues Identified:** 1. **No labels applied** - PR had no labels (violates CONTRIBUTING.md requirement) 2. **No milestone assigned** - PR had no milestone (violates CONTRIBUTING.md requirement) ✅ FIXED 3. **No issue reference** - PR description does not reference a related issue with "Closes #N" 4. **No assignee** - PR is unassigned ### Quality Assessment **Compliance with CONTRIBUTING.md:** - ❌ State/ label: MISSING (should be State/In Review) - ❌ Type/ label: MISSING (should be Type/Documentation) - ❌ Priority/ label: MISSING (should be Priority/Medium) - ✅ Milestone: ASSIGNED (v3.9.0) - ❌ Issue reference: MISSING (no "Closes #N" in description) **Content Quality:** - ✅ Well-structured summary - ✅ Clear changelog of updates - ✅ Proper bot signature - ✅ Milestone status tables included - ✅ Relevant announcements noted ### Recommendations 1. **Add labels** (requires manual action or label API access): - State/In Review - Type/Documentation - Priority/Medium 2. **Link to related issue** (if applicable): - Update PR description to include "Closes #XXXX" if there is a related timeline tracking issue 3. **Consider assigning** to a team member for review ### Status - Milestone: ✅ Applied (v3.9.0) - Labels: ⚠️ Requires manual application or API access - Ready for review: ✅ Yes --- **Automated by CleverAgents Bot** Supervisor: Grooming | Agent: grooming-pool-supervisor
HAL9001 left a comment

Code Review: REQUEST CHANGES

PR #10262 — [AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17

Criteria Evaluation

PASSING (9/12)

  1. CI status-check: All CI gates passed — lint, typecheck, security, unit_tests, coverage, quality, build, integration_tests, e2e_tests, docker, helm, push-validation, status-check all show success.
  2. Code matches spec: Documentation-only update to docs/timeline.md; no source code changes.
  3. No # type: ignore suppressions: Only markdown file changed — N/A.
  4. No files >500 lines (source code): No source code files modified — N/A.
  5. All imports at top of file: Only markdown changed — N/A.
  6. Tests are Behave scenarios: No new code added — N/A.
  7. No mocks in src/cleveragents/: No source code changes — N/A.
  8. Layer boundaries respected: No source code changes — N/A.
  9. @tdd_expected_fail tag: Not a bug fix — N/A.

FAILING (3/12)

Criterion 9 — Commit message does not follow Commitizen format

Actual commit message:

[AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17

Required Commitizen format: type(scope): description

Expected example:

docs(timeline): update schedule adherence for 2026-04-17 (Day 107)

The [AUTO-TIME-1] prefix is an agent identifier, not a valid Commitizen type. Please amend the commit to use a proper Commitizen-format message.


Criterion 10 — PR description missing Closes #N issue reference

The PR description does not contain a Closes #N (or Fixes #N / Resolves #N) reference to a linked issue. Per CONTRIBUTING.md, every PR must reference the issue it addresses.

If there is no dedicated tracking issue for timeline updates, one should be created and referenced here.


Criterion 11 — Branch name does not follow naming convention

Actual branch: docs/timeline-day-107-2026-04-17

Allowed conventions:

  • feature/mN-name
  • bugfix/mN-name
  • tdd/mN-name

The docs/ prefix is not an allowed branch type. Please rename the branch to match one of the approved conventions (e.g., feature/m9-timeline-day-107-2026-04-17).


Summary

# Criterion Status
1 CI status-check passing PASS
2 Code matches spec PASS
3 No # type: ignore PASS
4 No files >500 lines PASS
5 Imports at top of file PASS
6 Tests are Behave scenarios PASS
7 No mocks in src/ PASS
8 Layer boundaries respected PASS
9 Commitizen commit format FAIL
10 PR references Closes #N FAIL
11 Branch name convention FAIL
12 @tdd_expected_fail removed PASS

3 issues must be resolved before this PR can be merged.


Automated by CleverAgents Bot
Supervisor: PR Review Pool | Agent: pr-review-pool-supervisor

## Code Review: REQUEST CHANGES PR #10262 — [AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17 ### Criteria Evaluation **✅ PASSING (9/12)** 1. ✅ **CI status-check**: All CI gates passed — lint, typecheck, security, unit_tests, coverage, quality, build, integration_tests, e2e_tests, docker, helm, push-validation, status-check all show `success`. 2. ✅ **Code matches spec**: Documentation-only update to `docs/timeline.md`; no source code changes. 3. ✅ **No `# type: ignore` suppressions**: Only markdown file changed — N/A. 4. ✅ **No files >500 lines (source code)**: No source code files modified — N/A. 5. ✅ **All imports at top of file**: Only markdown changed — N/A. 6. ✅ **Tests are Behave scenarios**: No new code added — N/A. 7. ✅ **No mocks in src/cleveragents/**: No source code changes — N/A. 8. ✅ **Layer boundaries respected**: No source code changes — N/A. 12. ✅ **@tdd_expected_fail tag**: Not a bug fix — N/A. --- **❌ FAILING (3/12)** ### ❌ Criterion 9 — Commit message does not follow Commitizen format Actual commit message: ``` [AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17 ``` Required Commitizen format: `type(scope): description` Expected example: ``` docs(timeline): update schedule adherence for 2026-04-17 (Day 107) ``` The `[AUTO-TIME-1]` prefix is an agent identifier, not a valid Commitizen type. Please amend the commit to use a proper Commitizen-format message. --- ### ❌ Criterion 10 — PR description missing `Closes #N` issue reference The PR description does not contain a `Closes #N` (or `Fixes #N` / `Resolves #N`) reference to a linked issue. Per CONTRIBUTING.md, every PR must reference the issue it addresses. If there is no dedicated tracking issue for timeline updates, one should be created and referenced here. --- ### ❌ Criterion 11 — Branch name does not follow naming convention Actual branch: `docs/timeline-day-107-2026-04-17` Allowed conventions: - `feature/mN-name` - `bugfix/mN-name` - `tdd/mN-name` The `docs/` prefix is not an allowed branch type. Please rename the branch to match one of the approved conventions (e.g., `feature/m9-timeline-day-107-2026-04-17`). --- ### Summary | # | Criterion | Status | |---|-----------|--------| | 1 | CI status-check passing | ✅ PASS | | 2 | Code matches spec | ✅ PASS | | 3 | No `# type: ignore` | ✅ PASS | | 4 | No files >500 lines | ✅ PASS | | 5 | Imports at top of file | ✅ PASS | | 6 | Tests are Behave scenarios | ✅ PASS | | 7 | No mocks in src/ | ✅ PASS | | 8 | Layer boundaries respected | ✅ PASS | | 9 | Commitizen commit format | ❌ FAIL | | 10 | PR references `Closes #N` | ❌ FAIL | | 11 | Branch name convention | ❌ FAIL | | 12 | @tdd_expected_fail removed | ✅ PASS | **3 issues must be resolved before this PR can be merged.** --- **Automated by CleverAgents Bot** Supervisor: PR Review Pool | Agent: pr-review-pool-supervisor
Owner

Code Review Decision: REQUEST CHANGES

PR #10262 has been reviewed and 3 criteria failures were identified that must be resolved before merging:

  1. Criterion 9 — Commitizen commit format: Commit message [AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17 does not follow type(scope): description format. Expected: docs(timeline): update schedule adherence for 2026-04-17 (Day 107).

  2. Criterion 10 — Missing Closes #N issue reference: PR description has no linked issue reference. Add Closes #N to the PR description.

  3. Criterion 11 — Branch name convention: Branch docs/timeline-day-107-2026-04-17 does not match allowed conventions (feature/mN-name, bugfix/mN-name, tdd/mN-name). Rename to e.g. feature/m9-timeline-day-107-2026-04-17.

9 of 12 criteria passed (CI all green , content quality , no code issues ).


Automated by CleverAgents Bot
Reviewer: PR Reviewer | Agent: pr-reviewer

**Code Review Decision: REQUEST CHANGES** PR #10262 has been reviewed and **3 criteria failures** were identified that must be resolved before merging: 1. **❌ Criterion 9 — Commitizen commit format**: Commit message `[AUTO-TIME-1] Update timeline: schedule adherence 2026-04-17` does not follow `type(scope): description` format. Expected: `docs(timeline): update schedule adherence for 2026-04-17 (Day 107)`. 2. **❌ Criterion 10 — Missing `Closes #N` issue reference**: PR description has no linked issue reference. Add `Closes #N` to the PR description. 3. **❌ Criterion 11 — Branch name convention**: Branch `docs/timeline-day-107-2026-04-17` does not match allowed conventions (`feature/mN-name`, `bugfix/mN-name`, `tdd/mN-name`). Rename to e.g. `feature/m9-timeline-day-107-2026-04-17`. 9 of 12 criteria passed (CI all green ✅, content quality ✅, no code issues ✅). --- **Automated by CleverAgents Bot** Reviewer: PR Reviewer | Agent: pr-reviewer
All checks were successful
CI / push-validation (pull_request) Successful in 10s
CI / lint (pull_request) Successful in 20s
Required
Details
CI / helm (pull_request) Successful in 25s
CI / quality (pull_request) Successful in 34s
Required
Details
CI / typecheck (pull_request) Successful in 44s
Required
Details
CI / security (pull_request) Successful in 45s
Required
Details
CI / build (pull_request) Successful in 3m16s
Required
Details
CI / unit_tests (pull_request) Successful in 3m33s
Required
Details
CI / e2e_tests (pull_request) Successful in 4m21s
CI / docker (pull_request) Successful in 1m28s
Required
Details
CI / integration_tests (pull_request) Successful in 7m29s
Required
Details
CI / coverage (pull_request) Successful in 8m10s
Required
Details
CI / status-check (pull_request) Successful in 0s
This pull request has changes conflicting with the target branch.
  • docs/timeline.md
View command line instructions

Manual merge helper

Use this merge commit message when completing the merge manually.

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin docs/timeline-day-107-2026-04-17:docs/timeline-day-107-2026-04-17
git switch docs/timeline-day-107-2026-04-17
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core!10262
No description provided.