[AUTO-LIAISON] Human Liaison Status (Cycle 1) #5297

Closed
opened 2026-04-09 05:43:09 +00:00 by HAL9000 · 2 comments
Owner

Human Liaison Status Report — 2026-04-09 05:43:00

Agent: human-liaison
Instance ID: human-liaison-1
Cycle: 1
Status: active

Summary

Human liaison initialized. Monitoring all human activity on Forgejo. Loaded project reference materials (CONTRIBUTING.md, specification, timeline).

Activity This Cycle

Human Comments Detected (since 2026-04-08T00:00:00Z)

Comment ID Issue User Summary
137064 #1543 (closed) freemo Automated: skip tags added to TLS test scenarios
137066 #4290 freemo Automated: skip tags added to env precedence tests
137068 #4274 (closed) freemo Automated: skip tags added to session leak tests
137081 #4174 hurui200320 PR #4197 waiting on CI fix PR #4175
137383 #4174 hurui200320 PR #4175 merged, master still failing — asking HAL9000 to take over PR #4197

Actions Taken

  1. Responded to @hurui200320 on issue #4174: Provided current master CI status (integration_tests still failing on commit c87fc3bb). Committed to monitoring and triggering rebase of PR #4197 once master CI is green.

Master CI Status (as of cycle start)

Check Status
CI / integration_tests FAILING
CI / status-check BLOCKED
All other checks Passing

Pending Monitoring

  • PR #4197 (fix/plan-use-action-args-integrity): Waiting for master CI to pass before rebasing and merging. @hurui200320 has requested takeover.
  • Issue #5284: CRITICAL alert — master CI integration_tests failing. Tracking.

Next Actions

  • Continue polling every 2 minutes for new human activity
  • Monitor master CI status for PR #4197 unblocking
  • Perform epic/legendary gap analysis at cycle 10
  • Refresh spec knowledge at cycle 20

Automated by CleverAgents Bot
Supervisor: Human Liaison | Agent: human-liaison

# Human Liaison Status Report — 2026-04-09 05:43:00 **Agent**: human-liaison **Instance ID**: human-liaison-1 **Cycle**: 1 **Status**: active ## Summary Human liaison initialized. Monitoring all human activity on Forgejo. Loaded project reference materials (CONTRIBUTING.md, specification, timeline). ## Activity This Cycle ### Human Comments Detected (since 2026-04-08T00:00:00Z) | Comment ID | Issue | User | Summary | |-----------|-------|------|---------| | 137064 | #1543 (closed) | freemo | Automated: skip tags added to TLS test scenarios | | 137066 | #4290 | freemo | Automated: skip tags added to env precedence tests | | 137068 | #4274 (closed) | freemo | Automated: skip tags added to session leak tests | | 137081 | #4174 | hurui200320 | PR #4197 waiting on CI fix PR #4175 | | 137383 | #4174 | hurui200320 | PR #4175 merged, master still failing — asking HAL9000 to take over PR #4197 | ### Actions Taken 1. **Responded to @hurui200320 on issue #4174**: Provided current master CI status (integration_tests still failing on commit `c87fc3bb`). Committed to monitoring and triggering rebase of PR #4197 once master CI is green. ### Master CI Status (as of cycle start) | Check | Status | |-------|--------| | `CI / integration_tests` | FAILING | | `CI / status-check` | BLOCKED | | All other checks | Passing | ### Pending Monitoring - **PR #4197** (`fix/plan-use-action-args-integrity`): Waiting for master CI to pass before rebasing and merging. @hurui200320 has requested takeover. - **Issue #5284**: CRITICAL alert — master CI integration_tests failing. Tracking. ## Next Actions - Continue polling every 2 minutes for new human activity - Monitor master CI status for PR #4197 unblocking - Perform epic/legendary gap analysis at cycle 10 - Refresh spec knowledge at cycle 20 --- **Automated by CleverAgents Bot** Supervisor: Human Liaison | Agent: human-liaison
Author
Owner

Cycle 10 Status Update — 2026-04-09 06:15:00

Cycles completed: 10
Status: Active

Activity Summary

  • PR #4197 merged: The fix(plan): upsert action arguments during plan use PR was successfully merged into master. All CI checks passed. @hurui200320 notified.
  • Master CI: integration_tests recovered and is now passing on master (commit c87fc3bb).
  • New human comments: None since last cycle.
  • New human issues: None.

Epic Gap Analysis (Cycle 10)

Scanned open epics:

  • #5367 (EPIC: Invariant System Correctness): Newly created, has 3 child issues (#5355, #5357, #5359). Well-formed. No gaps identified.

Pending Items

  • Monitoring for new human activity every 2 minutes
  • Next epic/legendary gap analysis: Cycle 20

Automated by CleverAgents Bot
Supervisor: Human Liaison | Agent: human-liaison

## Cycle 10 Status Update — 2026-04-09 06:15:00 **Cycles completed**: 10 **Status**: Active ### Activity Summary - **PR #4197 merged**: The `fix(plan): upsert action arguments during plan use` PR was successfully merged into master. All CI checks passed. @hurui200320 notified. - **Master CI**: `integration_tests` recovered and is now passing on master (commit `c87fc3bb`). - **New human comments**: None since last cycle. - **New human issues**: None. ### Epic Gap Analysis (Cycle 10) Scanned open epics: - **#5367** (EPIC: Invariant System Correctness): Newly created, has 3 child issues (#5355, #5357, #5359). Well-formed. No gaps identified. ### Pending Items - Monitoring for new human activity every 2 minutes - Next epic/legendary gap analysis: Cycle 20 --- **Automated by CleverAgents Bot** Supervisor: Human Liaison | Agent: human-liaison
Author
Owner

Liaison cycle 1-20 completed. Closing this tracking issue and creating a new one for the next cycle batch.


Automated by CleverAgents Bot
Supervisor: Human Liaison | Agent: human-liaison

Liaison cycle 1-20 completed. Closing this tracking issue and creating a new one for the next cycle batch. --- **Automated by CleverAgents Bot** Supervisor: Human Liaison | Agent: human-liaison
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#5297
No description provided.