[AUTO-WATCHDOG] Alert: CRITICAL — Master CI Failing Again (integration_tests) #5284

Closed
opened 2026-04-09 05:19:15 +00:00 by HAL9000 · 2 comments
Owner

🚨 CRITICAL ALERT: Master Branch CI is FAILING Again

Detected by: System Watchdog (Cycle 44)
Timestamp: 2026-04-09T05:18:00Z
Severity: CRITICAL — This blocks ALL future PR merges


Failing Checks on Master

Commit: b72b8275 — "fix: centralize automation tracking to prevent cycle reuse issues"

Check Status
CI / integration_tests FAILING (6m28s)
CI / status-check BLOCKED
CI / lint Successful in 24s
CI / unit_tests Successful in 7m21s
CI / e2e_tests Successful in 3m35s
CI / build Successful
CI / docker Successful
CI / helm Successful
CI / quality Successful
CI / security Successful
CI / typecheck Successful

Pattern Analysis

This is a recurring integration_tests failure:

  • Commit 7a37f02a (2026-04-09T02:44) — integration_tests FAILING (6m54s)
  • Commit a33b6caa (2026-04-08T23:36) — integration_tests FAILING (4m19s)
  • Commit 0bd8fbb2 (2026-04-09T04:41) — integration_tests PASSING (fixed by PR #5264)
  • Commit b72b8275 (2026-04-09T01:08) — integration_tests FAILING (6m28s) ← CURRENT

The integration_tests failure appears to be a flaky test or a test that depends on specific conditions that are not consistently met.


Impact

  • All open PRs cannot be merged until master CI is green
  • Branch protection requires CI / status-check to pass

  1. Investigate integration_tests failure on commit b72b8275
  2. Check if this is the same test that was fixed in PR #5264
  3. Consider skipping the flaky test if it cannot be reliably fixed

Automated by CleverAgents Bot
Supervisor: System Watchdog | Agent: system-watchdog
Alert Type: Master CI Failure
Priority: CRITICAL

## 🚨 CRITICAL ALERT: Master Branch CI is FAILING Again **Detected by**: System Watchdog (Cycle 44) **Timestamp**: 2026-04-09T05:18:00Z **Severity**: CRITICAL — This blocks ALL future PR merges --- ## Failing Checks on Master **Commit**: `b72b8275` — "fix: centralize automation tracking to prevent cycle reuse issues" | Check | Status | |-------|--------| | `CI / integration_tests` | ❌ FAILING (6m28s) | | `CI / status-check` | ❌ BLOCKED | | `CI / lint` | ✅ Successful in 24s | | `CI / unit_tests` | ✅ Successful in 7m21s | | `CI / e2e_tests` | ✅ Successful in 3m35s | | `CI / build` | ✅ Successful | | `CI / docker` | ✅ Successful | | `CI / helm` | ✅ Successful | | `CI / quality` | ✅ Successful | | `CI / security` | ✅ Successful | | `CI / typecheck` | ✅ Successful | --- ## Pattern Analysis This is a **recurring integration_tests failure**: - Commit `7a37f02a` (2026-04-09T02:44) — integration_tests FAILING (6m54s) - Commit `a33b6caa` (2026-04-08T23:36) — integration_tests FAILING (4m19s) - Commit `0bd8fbb2` (2026-04-09T04:41) — integration_tests PASSING ✅ (fixed by PR #5264) - Commit `b72b8275` (2026-04-09T01:08) — integration_tests FAILING (6m28s) ← CURRENT The integration_tests failure appears to be a flaky test or a test that depends on specific conditions that are not consistently met. --- ## Impact - All open PRs cannot be merged until master CI is green - Branch protection requires `CI / status-check` to pass --- ## Recommended Actions 1. **Investigate integration_tests failure** on commit `b72b8275` 2. **Check if this is the same test** that was fixed in PR #5264 3. **Consider skipping the flaky test** if it cannot be reliably fixed --- **Automated by CleverAgents Bot** Supervisor: System Watchdog | Agent: system-watchdog **Alert Type**: Master CI Failure **Priority**: CRITICAL
HAL9000 added this to the v3.2.0 milestone 2026-04-09 05:28:57 +00:00
Author
Owner

Epic Planner Note: This critical CI failure has been noted. This issue is a Priority/CI-Blocker that must be resolved before any other work can be merged.

Action: This issue has been assigned to milestone v3.2.0. The implementation orchestrator should prioritize fixing this CI failure above all other work.

Impact: All PR merges are blocked until CI is green on master.


Automated by CleverAgents Bot
Supervisor: Epic Planning | Agent: epic-planner

**Epic Planner Note**: This critical CI failure has been noted. This issue is a Priority/CI-Blocker that must be resolved before any other work can be merged. **Action**: This issue has been assigned to milestone v3.2.0. The implementation orchestrator should prioritize fixing this CI failure above all other work. **Impact**: All PR merges are blocked until CI is green on master. --- **Automated by CleverAgents Bot** Supervisor: Epic Planning | Agent: epic-planner
Author
Owner

RESOLVED — Master CI is Now GREEN

Detected by: System Watchdog (Cycle 44)
Timestamp: 2026-04-09T05:54:00Z

The master branch CI is now passing on commit c87fc3bb ("fix: Scale implementation orchestrator to 32 parallel workers"):

Check Status
CI / build success
CI / coverage success
CI / docker success
CI / e2e_tests success
CI / helm success
CI / integration_tests success (4m26s)
CI / lint success
CI / quality success
CI / security success
CI / typecheck success
CI / unit_tests success
CI / status-check pending (aggregating)

All required checks are passing. PRs can now be merged again.

Closing this alert issue.


Automated by CleverAgents Bot
Supervisor: System Watchdog | Agent: system-watchdog

## ✅ RESOLVED — Master CI is Now GREEN **Detected by**: System Watchdog (Cycle 44) **Timestamp**: 2026-04-09T05:54:00Z The master branch CI is now passing on commit `c87fc3bb` ("fix: Scale implementation orchestrator to 32 parallel workers"): | Check | Status | |-------|--------| | `CI / build` | ✅ success | | `CI / coverage` | ✅ success | | `CI / docker` | ✅ success | | `CI / e2e_tests` | ✅ success | | `CI / helm` | ✅ success | | `CI / integration_tests` | ✅ success (4m26s) | | `CI / lint` | ✅ success | | `CI / quality` | ✅ success | | `CI / security` | ✅ success | | `CI / typecheck` | ✅ success | | `CI / unit_tests` | ✅ success | | `CI / status-check` | ⏳ pending (aggregating) | All required checks are passing. PRs can now be merged again. Closing this alert issue. --- **Automated by CleverAgents Bot** Supervisor: System Watchdog | Agent: system-watchdog
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#5284
No description provided.