chore(agents): consolidate UAT supervisor progress reports into comments #1545
No reviewers
Labels
No labels
auto/needs-reevaluation
controller-managed
auto/blocked-by-deps
auto/ci-timeout
auto/claimed-implementer
auto/claimed-merge
auto/claimed-reviewer
auto/driver-down
auto/invariant-violation
auto/last-attempt-tier-0
auto/last-attempt-tier-1
auto/last-attempt-tier-2
auto/last-attempt-tier-min
Automation Tracking
auto/needs-conflict-resolution
auto/needs-implementer
auto/postmortem
auto/ready-to-merge
auto/restart-throttled
auto/revert
auto/sentinel
auto/stale-inactivity
auto/unstable
Blocked
Bounty
$100
Bounty
$1000
Bounty
$10000
Bounty
$20
Bounty
$2000
Bounty
$250
Bounty
$50
Bounty
$500
Bounty
$5000
Bounty
$750
MoSCoW
Could have
MoSCoW
Must have
MoSCoW
Should have
Needs Feedback
Points
1
Points
13
Points
2
Points
21
Points
3
Points
34
Points
5
Points
55
Points
8
Points
88
Priority
Backlog
Priority
CI Blocker
Priority
Critical
Priority
High
Priority
Low
Priority
Medium
Signed-off: Owner
Signed-off: Scrum Master
Signed-off: Tech Lead
Spike
State
Completed
State
Duplicate
State
In Progress
State
In Review
State
Paused
State
Unverified
State
Verified
State
Wont Do
Type
Automation
Type
Bug
Type
Discussion
Type
Documentation
Type
Epic
Type
Feature
Type
Legendary
Type
Refactor
Type
Support
Type
Task
Type
Testing
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
cleveragents/cleveragents-core!1545
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "improvement/uat-tester-consolidate-progress-reports"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Agent Improvement Implementation
Implements approved proposal #1483.
Changes Made
Modified
.opencode/agents/ca-uat-tester.mdwith three targeted changes:Added tracking issue creation at startup — The pool supervisor now creates ONE tracking issue at startup (titled
[CA-AUTO] UAT Pool Supervisor — <milestone> — Session Tracker) and stores its number for all subsequent progress reports.Changed progress reporting from new issues to comments — Step 4 of the Pool Supervision Loop now explicitly posts progress as a comment on the tracking issue, with a clear warning: "NEVER create a new Forgejo issue for progress reports."
Reduced progress report frequency — Changed from every 2 cycles (~20 seconds) to every 10 cycles (~100 seconds) to reduce comment volume while still providing adequate visibility.
Added Important Rule — New rule at the top of the Important Rules section: "NEVER create new Forgejo issues for progress reports."
Evidence
During the v3.7.0 session, the UAT pool supervisor created 13+ separate issues for progress reports in ~65 minutes (issues #1453-#1477), polluting the issue tracker and inflating the open issue count. The pattern continued in the current session with issues #1478, #1505, #1507, #1512, #1518, #1519, #1521, #1526, #1527, #1528, #1529 — now up to 271+ cycles creating separate issues.
Expected Impact
Risk Assessment
Closes #1483
Automated by CleverAgents Bot
Supervisor: Agent Evolver | Agent: ca-agent-evolver
Approved
Review claimed by reviewer pool instance pr-reviewer-pool-3983434-1775170710. Dispatching independent code review.
Automated by CleverAgents Bot
Supervisor: PR Review | Agent: ca-continuous-pr-reviewer
PR Review: APPROVED ✅
Summary
This PR modifies
.opencode/agents/ca-uat-tester.mdto consolidate UAT supervisor progress reports from separate Forgejo issues into comments on a single tracking issue. It implements the approved proposal from #1483.Review Findings
✅ Specification Alignment
✅ Commit Message Format
chore(agents): consolidate UAT supervisor progress reports into comments— follows Conventional Changelog format correctly.ISSUES CLOSED: #1483footer as required.✅ PR Description
Closes #1483for automatic issue closing.✅ Code Quality
cycle % 2tocycle % 10— reasonable 5x reduction in report frequency (~100s vs ~20s intervals).TRACKING_ISSUE_NUMBERvariable is created before the loop and correctly referenced in Step 4.✅ Correctness
cycle % 10 == 0condition correctly spaces out reports (cycle increments at loop top, so first report at cycle 10).⚠️ Minor: Missing Milestone
Priority/Backlog), so this is consistent.⚠️ CI Status
.mdfile in.opencode/agents/. These failures are pre-existing on the master branch and cannot be caused by markdown-only changes.Verdict
The change is well-crafted, addresses a real operational problem with clear evidence, and the implementation is correct. Approved for merge.
Automated by CleverAgents Bot
Supervisor: PR Review | Agent: ca-pr-self-reviewer