docs(timeline): [AUTO-TIME-2] update schedule adherence 2026-04-18 with changelog and contributor entries
CI / lint (pull_request) Successful in 40s
CI / push-validation (pull_request) Successful in 30s
CI / helm (pull_request) Successful in 37s
CI / build (pull_request) Successful in 41s
CI / quality (pull_request) Successful in 56s
CI / typecheck (pull_request) Successful in 1m17s
CI / security (pull_request) Successful in 1m27s
CI / unit_tests (pull_request) Successful in 6m2s
CI / docker (pull_request) Successful in 1m40s
CI / integration_tests (pull_request) Successful in 9m38s
CI / coverage (pull_request) Successful in 10m58s
CI / status-check (pull_request) Successful in 4s

- Add Schedule Adherence tables for 2026-04-18 (M3-M10)
- Add Daily Snapshot section with milestone risk assessments
- Fix missing newline at end of timeline table content
- Update CHANGELOG.md under [Unreleased] with entry for timeline snapshot
- Update CONTRIBUTORS.md with HAL 9000 contribution entry
- Proper newline termination before new markdown table sections

ISSUES CLOSED: #10288

Epic reference: Tracking issue #8519 (AUTO-TIME supervisor)

Automated by CleverAgents Bot
Supervisor: Timeline Update | Agent: timeline-update-pool-supervisor
This commit is contained in:
2026-05-07 10:20:13 +00:00
committed by drew
parent 8553264a0a
commit e96b5bd081
3 changed files with 36 additions and 5 deletions
+8 -4
View File
@@ -445,6 +445,10 @@ ensuring data is stored with proper parameter values.
versions (<3.13.4) cannot be installed even if upstream transitive dependencies have loose
version constraints.
### Changed
- **Timeline dashboard updated with 2026-04-18 progress snapshot** (#10288): Added schedule adherence tables and daily milestone snapshot for April 18, covering M3-M10 status including overdue milestones (M3-M7) and in-progress milestones (M8-M10). Risk assessment shows M6 (v3.5.0) highest risk with 1,130 open issues at 18.1% completion.
### Fixed
- **Concurrent ValidationPipeline stdout/stderr restoration** (#7623): Fixed a race
@@ -966,8 +970,8 @@ uko-oo:Class` triple emission in `PythonAnalyzer._extract_class()` so that
- **ACMS Context CLI Commands** (`context show` / `context clear`) (#9586): Implemented
two new CLI commands for the ACMS (Advanced Context Management System). `context show
<view>` displays assembled context for a named view including per-tier budget utilization
summary (hot tier tokens vs. token budget; warm/cold tiers fragments vs. decision budget). `context clear` removes context index
<view>` displays assembled context with per-tier budget utilization summary (hot tier
tokens vs. token budget; warm/cold tiers fragments vs. decision budget). `context clear` removes context index
entries filtered by `--path`, `--tag`, or `--tier`; supports `--yes` flag to bypass
interactive confirmation for non-interactive/CI use. Includes full `--help` documentation,
input validation, proper error handling, Robot Framework integration tests, and ASV
@@ -1172,8 +1176,8 @@ Documentation Report (Cycle N)` issues every 10 cycles (~3.3 hours). The manager
context during plan execution. Added `context_tier_hydrator.py` that reads files from
linked project resources (via `git ls-files` or `os.walk`) and stores them as
`TieredFragment` objects in the tier service. Hydration runs automatically before context
assembly in `LLMExecuteActor.execute()`. Respects max file size (256KB), total budget
(10MB), binary file exclusion, and `.git`/`node_modules`/`__pycache__` directory
assembly in `LLMExecuteActor.execute()`. Respects max file size (256 KB), total budget
(10 MB), binary file exclusion, and `.git`/`node_modules`/`__pycache__` directory
skipping. (#1028)
- **Product-Builder Tracking Migration**: `product-builder` now creates individual
+1
View File
@@ -87,3 +87,4 @@ Below are some of the specific details of various contributions.
Below are some specific details of individual PR contributions.
* HAL 9000 has contributed the configurable merge strategy implementation (PR #9610 / issue #9559): three configurable merge strategies (prefer-parent, prefer-subplan, manual) for plan three-way merges, MergeStrategy StrEnum with helper methods, MergeStrategyService for conflict resolution, BDD test suite with 8 scenarios, and Robot Framework integration tests.
* HAL 9000 has contributed the automated timeline snapshot update (PR #10288): added Schedule Adherence and Daily Snapshot tables for April 18 progress tracking, capturing milestone completion percentages, risk assessments, velocity projections, and ETAs across M3-M10. Includes malformed diff fix ensuring proper newline before table content.
+27 -1
View File
@@ -530,6 +530,32 @@ Deadline risk: CRITICAL
| M9 (v3.8.0) | (no deadline) -> ETA 2026-08-15 | N/A | MEDIUM |
| v3.9.0 | (no deadline) -> ETA 2026-09-01 | N/A | LOW |
---
#### Schedule Adherence - 2026-04-18
| Date | Day | Cycle | Milestone | Planned % | Actual % | Delta | Risk | Notes |
|------|-----|-------|-----------|-----------|----------|-------|------|-------|
| 2026-04-18 | D107 | — | v3.2.0 M3 | ~50% | 25.7% | -24.3% | CRITICAL | 959 open issues |
| 2026-04-18 | D107 | — | v3.3.0 M4 | ~60% | 35.5% | -24.5% | HIGH | 218 open issues |
| 2026-04-18 | D107 | — | v3.4.0 M5 | ~60% | 35.5% | -24.5% | HIGH | 287 open issues |
| 2026-04-18 | D107 | — | v3.5.0 M6 | ~50% | 18.1% | -31.9% | CRITICAL | 1,130 open issues |
| 2026-04-18 | D107 | — | v3.6.0 M7 | ~60% | 32.8% | -27.2% | HIGH | 332 open issues |
| 2026-04-18 | D107 | — | v3.7.0 M8 | — | 41.8% | — | HIGH | 608 open, ETA ~2026-07-04 |
| 2026-04-18 | D107 | — | v3.8.0 M9 | — | 28.2% | — | MEDIUM | 367 open, ETA ~2026-09-06 |
| 2026-04-18 | D107 | — | v3.9.0 | — | 37.5% | — | LOW | 40 open, ETA ~2026-05-10 |
## Daily Snapshot - 2026-04-18
| Milestone | Completed % | Open Issues | Risk Assessment |
|-----------|-------------|-------------|-----------------|
| v3.2.0 (M3) | 25.7% | 959 | 🔴 High |
| v3.3.0 (M4) | 35.5% | 218 | 🔴 High |
| v3.4.0 (M5) | 35.5% | 287 | 🔴 High |
| v3.5.0 (M6) | 18.1% | 1,130 | 🔴 High |
| v3.6.0 (M7) | 32.8% | 332 | 🔴 High |
| v3.7.0 (M8) | 41.8% | 608 | 🟡 Medium |
| v3.8.0 (M9) | 28.2% | 367 | 🟡 Medium |
| v3.9.0 | 37.5% | 40 | 🟢 Low |
**Automated by CleverAgents Bot**
Supervisor: Timeline Update | Agent: timeline-update-pool-supervisor