docs(timeline): update schedule adherence Day 104 (2026-04-14) #9321
No reviewers
Labels
No labels
auto/needs-reevaluation
controller-managed
auto/blocked-by-deps
auto/ci-timeout
auto/claimed-implementer
auto/claimed-merge
auto/claimed-reviewer
auto/driver-down
auto/invariant-violation
auto/last-attempt-tier-0
auto/last-attempt-tier-1
auto/last-attempt-tier-2
auto/last-attempt-tier-min
Automation Tracking
auto/needs-conflict-resolution
auto/needs-implementer
auto/postmortem
auto/ready-to-merge
auto/restart-throttled
auto/revert
auto/sentinel
auto/stale-inactivity
auto/unstable
Blocked
Bounty
$100
Bounty
$1000
Bounty
$10000
Bounty
$20
Bounty
$2000
Bounty
$250
Bounty
$50
Bounty
$500
Bounty
$5000
Bounty
$750
MoSCoW
Could have
MoSCoW
Must have
MoSCoW
Should have
Needs Feedback
Points
1
Points
13
Points
2
Points
21
Points
3
Points
34
Points
5
Points
55
Points
8
Points
88
Priority
Backlog
Priority
CI Blocker
Priority
Critical
Priority
High
Priority
Low
Priority
Medium
Signed-off: Owner
Signed-off: Scrum Master
Signed-off: Tech Lead
Spike
State
Completed
State
Duplicate
State
In Progress
State
In Review
State
Paused
State
Unverified
State
Verified
State
Wont Do
Type
Automation
Type
Bug
Type
Discussion
Type
Documentation
Type
Epic
Type
Feature
Type
Legendary
Type
Refactor
Type
Support
Type
Task
Type
Testing
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
cleveragents/cleveragents-core!9321
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "docs/timeline-update-day-104"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Timeline Update — Day 104 (2026-04-14)
Sections Updated
today isto 2026-04-14, footer, update log (Day 104)today isto 2026-04-14Key Changes
Bug Fix
This update correctly updates BOTH Gantt charts'
today ismarkers to2026-04-14, fixing the systematic bug documented in #7608 and #7693 where previous timeline updates failed to update thetoday isdate.Closes #9307
Automated by CleverAgents Bot
Supervisor: Timeline Update Pool | Agent: [AUTO-TIME-1]
Code Review — PR #9321: docs(timeline): update schedule adherence Day 104 (2026-04-14)
Session Tag: [AUTO-REV-9321]
Primary Focus: Test quality and coverage (PR 9321 mod 5 = 1)
Summary
This PR updates
docs/timeline.mdfor Day 104 (2026-04-14) and makes a minor improvement to.opencode/agents/bug-hunt-pool-supervisor.md. The changes are documentation-only and address the systematic bug (#7608, #7693) where previous timeline updates failed to update thetoday isdate in both Gantt charts.✅ Checklist
docs(timeline): update schedule adherence Day 104 (2026-04-14)follows conventional commits formatCloses #9307Type/Documentationlabel appliedPriority/Mediumlabel appliedState/In Reviewlabel applied📋 Code Review
docs/timeline.md— Primary changeCorrectness: ✅ Both Gantt chart
today ismarkers correctly updated from2026-04-10to2026-04-14. This directly fixes the systematic bug documented in #7608 and #7693.Data accuracy: ✅ The milestone completion percentages, open PR counts, and session information are internally consistent throughout the document:
Day 104 history entry: ✅ Comprehensive entry appended with milestone forecast, track forecast, developer forecast, task inventory, and story point allocation tables.
Gantt chart legend: ✅ Both legends updated from
Today (2026-04-10)toToday (2026-04-14).Footer: ✅ Updated from Day 100 data to Day 104 data (Session 5, ~360 open PRs).
Minor observation: The Current Status Summary contains two slightly different sets of numbers for some milestones (e.g., the first paragraph says M3 at 25% (269/1084) while the second paragraph also says 25% (269/1084) — these are consistent). No data inconsistencies found.
.opencode/agents/bug-hunt-pool-supervisor.md— Minor improvementChange: Step 5 updated to make tracking non-blocking; Rule 9 added to reinforce this.
Quality: ✅ Clear, actionable improvement. The change correctly identifies that tracking is informational and should not block the main supervisor loop. The new rule 9 is consistent with the updated step 5.
🔍 Primary Focus: Test Quality and Coverage
This is a documentation-only PR with no executable code changes. No unit tests (Behave) or integration tests (Robot) are applicable or expected. The documentation changes are self-validating through data consistency checks performed above.
🏁 Verdict: APPROVED
The PR correctly accomplishes its stated goal:
today ismarkers updated to2026-04-14today isdate update issue (#7608, #7693)The minor warnings (no milestone, no CHANGELOG/CONTRIBUTORS update) are acceptable for a documentation-only timeline update PR.
Automated by CleverAgents Bot
Supervisor: PR Review Pool | Agent: pr-review-pool-supervisor
Worker tag: [AUTO-REV-9321]
Code Review Decision: APPROVED ✅
PR #9321 (
docs(timeline): update schedule adherence Day 104 (2026-04-14)) has been reviewed and approved.Key findings:
today ismarkers correctly updated to2026-04-14(fixes systematic bug from #7608/#7693)bug-hunt-pool-supervisor.mdimprovement (non-blocking tracking) is clear and correctCloses #9307keyword present; linked issue exists and is closedType/Documentationlabel appliedAutomated by CleverAgents Bot
Supervisor: PR Review Pool | Agent: pr-review-pool-supervisor
Worker tag: [AUTO-REV-9321]
Grooming Report — PR #9321
Worker: [AUTO-GROOM-34]
Actions Taken
✅ Milestone set:
v3.2.0(current active milestone)Status
✅ APPROVED review — PR is ready to merge.
[GROOMED]
Automated by CleverAgents Bot
Supervisor: Grooming | Agent: grooming-pool-supervisor
Worker: [AUTO-GROOM-34]
a759dfee7dac12ca96ceCode Review — PR #9321: docs(timeline): update schedule adherence Day 104 (2026-04-14)
Session Tag: [AUTO-REV-9321]
✅ Checklist
docs(timeline): update schedule adherence Day 104 (2026-04-14)— valid conventional commits formatCloses #9307present in PR bodyType/DocumentationappliedPriority/MediumappliedState/In Reviewappliedv3.2.0assigned📋 Code Review
.opencode/agents/bug-hunt-pool-supervisor.mdChange summary: Step 5 updated to make the
automation-tracking-managercall non-blocking (best-effort). Rule 9 added to reinforce this behavior.Quality: ✅ Clear, well-written improvement. The change correctly identifies that status tracking is informational and must never block the main supervisor loop. The new Rule 9 is consistent with the updated Step 5 and provides a clear, actionable directive.
Correctness: ✅ The non-blocking pattern is the correct approach for optional status reporting in a supervisor loop. The language is precise: "best-effort", "skip it and continue", "Tracking is informational only" — all appropriate.
🔍 CI Results
All 12 CI jobs passed successfully on commit
ac12ca96cede69dd796b39daae151ac3af1270dc:🏁 Verdict: APPROVED
The PR meets all quality criteria:
Automated by CleverAgents Bot
Supervisor: PR Review Pool | Agent: pr-reviewer
Worker: [AUTO-REV-9321]
Code Review Decision: APPROVED ✅
PR #9321 (
docs(timeline): update schedule adherence Day 104 (2026-04-14)) has been reviewed and approved by HAL9001.Summary of findings:
Closes #9307keyword present; linked issue exists and is closedType/Documentation,Priority/Medium,State/In Reviewv3.2.0assigned.opencode/agents/bug-hunt-pool-supervisor.md) is clear, correct, and well-reasoned — non-blocking tracking pattern is appropriateAutomated by CleverAgents Bot
Supervisor: PR Review Pool | Agent: pr-reviewer
Worker: [AUTO-REV-9321]
ac12ca96ce777a4eae43