docs(timeline): update schedule adherence Day 104 Cycles 1-4 [AUTO-TIME-1] #9130
@@ -91,7 +91,7 @@ Each cycle:
|
||||
|
||||
4. **Monitor workers.** Count active workers, check for stuck sessions.
|
||||
|
||||
5. **Update tracking.** Every 3 cycles, create a status tracking issue via `automation-tracking-manager` with prefix `AUTO-BUG-POOL`.
|
||||
5. **Update tracking (non-blocking).** Every 3 cycles, attempt to create a status tracking issue via `automation-tracking-manager` with prefix `AUTO-BUG-POOL`. This step is **best-effort** — if the call does not complete within a reasonable time or fails, skip it and continue to the next cycle. **Never block the main loop waiting for tracking.** Tracking is informational only; the supervisor's core function (module scanning and worker dispatch) must continue regardless.
|
||||
|
||||
## Finding Validation Gate
|
||||
|
||||
@@ -126,3 +126,4 @@ Supervisor: Bug Hunt Pool | Agent: bug-hunt-pool-supervisor
|
||||
|
||||
7. **Apply labels via `forgejo-label-manager`.** Never apply labels directly or using the Forgejo MCP/task. All label operations must go through `forgejo-label-manager`.
|
||||
8. **Exhaustive pagination for all list results.** Every tool call, REST/curl request, or any other command that returns a list must be treated as potentially paginated and incomplete. Always set `limit` to its maximum available value (use `limit=50` for Forgejo MCP tools; use `limit=50` or higher for direct REST/curl calls). After each list response, check whether the number of returned items equals the page size — if so, there are likely more results; fetch the next page (`page=2`, `page=3`, …) and continue until receiving a partial page. Never assume the first response is the complete result. This rule applies to every list-returning call without exception. *Examples specific to this agent (not exhaustive):* `forgejo_list_repo_issues` (default 20 — use `limit=50` and paginate to check for all existing bug issues before filing duplicates); `forgejo_list_repo_pull_requests` (same — check all open PRs that may already address a discovered bug).
|
||||
9. **Tracking is non-blocking.** The `automation-tracking-manager` call in step 5 must never block the main loop. If it hangs or fails, skip it and proceed. Core functionality (module mapping, worker dispatch, monitoring) takes priority over status reporting.
|
||||
|
||||
@@ -5316,3 +5316,352 @@ Story points per developer per milestone.
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M6+ | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| **Total** | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~1649 SP |
|
||||
|
||||
### 2026-04-14 (Day 104)
|
||||
|
||||
**Summary**
|
||||
|
||||
Status: Behind 35+d
|
||||
Deadline risk: CRITICAL
|
||||
|
||||
**Notes**
|
||||
|
||||
- Day 104 update (2026-04-14). AUTO-TIME cycle 1 — [AUTO-TIME-1]. Fresh start for timeline-update-pool-supervisor. Session 4 remains active.
|
||||
- Continued scope expansion across ALL milestones since Day 100: M3 grew 770→1112 (+342), M4 grew 220→280 (+60), M5 grew 313→382 (+69), M6 grew 1085→1301 (+216), M7 grew 400→488 (+88), M8 grew 944→1027 (+83), M9 grew 475→507 (+32). New milestone v3.9.0 appeared (36 total issues, 4 closed, 11.1%).
|
||||
- Milestone completions (Day 104): M3 24.2% (269/1112, was 32% at Day 100 — scope explosion +342 issues), M4 39.6% (111/280, was 49%), M5 36.6% (140/382, was 43%), M6 16.6% (216/1301, was 18%), M7 31.4% (153/488, was 38%), M8 41.7% (428/1027, was 45%), M9 26.2% (133/507, was 28%).
|
||||
- Apparent completion percentages dropped across all milestones due to massive scope expansion by agent-driven issue creation. Absolute closed issue counts increased slightly (M3: +20, M4: +3, M5: +7, M6: +19, M7: +3, M8: +3, M9: +2).
|
||||
- All milestones M3-M7 remain overdue. M8 and M9 have no deadlines. v3.9.0 is a new milestone with no deadline.
|
||||
- Overall project: ~32% complete across active milestones (v3.2.0–v3.9.0).
|
||||
- PR #9024 (docs/timeline-day-104 branch) is open and awaiting merge — contains a parallel Day 104 entry from a previous AUTO-TIME session.
|
||||
|
||||
|
||||
#### Milestone forecast
|
||||
|
||||
| Milestone | Target -> ETA | Delta | Risk |
|
||||
|-----------|---------------|-------|------|
|
||||
| M1 (v3.0.0) | (2026-02-15) -> COMPLETE | 0d | COMPLETE |
|
||||
| M2 (v3.1.0) | (2026-02-22) -> COMPLETE | 0d | COMPLETE |
|
||||
| M3 (v3.2.0) | (2026-02-26) -> ETA 2026-07-01 | +126d | CRITICAL — 843 open issues; 24.2% complete (scope expanded 770→1112) |
|
||||
| M4 (v3.3.0) | (2026-03-02) -> ETA 2026-06-01 | +91d | CRITICAL — 169 open issues; 39.6% complete (scope expanded 220→280) |
|
||||
| M5 (v3.4.0) | (2026-03-06) -> ETA 2026-06-15 | +101d | HIGH — 242 open issues; 36.6% complete (scope expanded 313→382) |
|
||||
| M6 (v3.5.0) | (2026-03-10) -> ETA 2026-09-01 | +175d | CRITICAL — 1085 open issues; 16.6% complete (scope expanded 1085→1301) |
|
||||
| M7 (v3.6.0) | (2026-03-28) -> ETA 2026-07-15 | +109d | HIGH — 335 open issues; 31.4% complete (scope expanded 400→488) |
|
||||
| M8 (v3.7.0) | (no deadline) -> ETA 2026-08-01 | N/A | HIGH — 599 open issues; 41.7% complete (scope expanded 944→1027) |
|
||||
| M9 (v3.8.0) | (no deadline) -> ETA 2026-09-01 | N/A | MEDIUM — 374 open issues; 26.2% complete (scope expanded 475→507) |
|
||||
| v3.9.0 | (no deadline) -> ETA TBD | N/A | LOW — 32 open issues; 11.1% complete (new milestone) |
|
||||
|
||||
#### Track forecast
|
||||
|
||||
| Track | Status | ETA | Risk | Blocking |
|
||||
|-------|--------|-----|------|----------|
|
||||
| Track A (Plan lifecycle + persistence) | Complete | Done | LOW | None |
|
||||
| Track B (Projects/resources + sandbox) | In Progress | ETA 2026-06-15 | HIGH | 242 open issues in v3.4.0; scope expanded +69 issues since Day 100 |
|
||||
| Track C (Actors/tools/skills/validations) | In Progress | ETA 2026-06-01 | CRITICAL | 169 open issues in v3.3.0; scope expanded +60 issues since Day 100 |
|
||||
| Track D (Change tracking + apply pipeline) | In Progress | ETA 2026-07-01 | CRITICAL | 843 open issues in v3.2.0; scope expanded +342 issues since Day 100 |
|
||||
| Track Q (Quality automation) | Ongoing | N/A | HIGH | Scope explosion across all milestones; agent-driven issue creation at high velocity |
|
||||
| Track T (Testing) | Active | Ongoing | HIGH | All milestones overdue; massive open issue backlogs; Session 4 active |
|
||||
|
||||
#### Developer forecast
|
||||
|
||||
| Name | Days Ahead/Behind | Availability | Risk | Focus |
|
||||
|------|-------------------|--------------|------|-------|
|
||||
| Jeff | -35d behind | active | HIGH | Session 4 supervisor; M3/M4/M5 backlog clearance; architecture oversight |
|
||||
| Luis | -35d behind | active | HIGH | M6 (v3.5.0) features; security hardening; PR review pool |
|
||||
| Hamza | -35d behind | active | HIGH | Resource DAG; v3.6.0 features; PR reviews |
|
||||
| Aditya | -35d behind | active | HIGH | M5 features; TDD counterparts; domain model work |
|
||||
| Brent | -35d behind | active | HIGH | Bug fixes; TDD counterparts; quality automation |
|
||||
| Rui | -35d behind | active | HIGH | TUI features; UAT bug fixes; E2E testing |
|
||||
| Mike/Brian | N/A | standby | LOW | Infrastructure support |
|
||||
|
||||
#### Task inventory
|
||||
|
||||
Milestone per developer as of Day 104 (2026-04-14).
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | 29/29 | 16/16 | N/A | 4/4 | 10/10 | N/A | 35/35 | 96/96 |
|
||||
| M2 | 26/26 | 14/14 | N/A | 1/1 | 5/5 | N/A | 6/6 | 56/56 |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | 843 open | 269/1112 |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | 169 open | 111/280 |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | 242 open | 140/382 |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | 1085 open | 216/1301 |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | 335 open | 153/488 |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | 599 open | 428/1027 |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | 374 open | 133/507 |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | 32 open | 4/36 |
|
||||
| **Total** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **~3479 open** | **1857/5305 closed** |
|
||||
|
||||
Note: "done/total" = closed/total for that milestone. Assignee data not broken down by developer (all unassigned in API). Agent-driven issue creation continues at high velocity. Scope expanded massively since Day 100 across all milestones.
|
||||
|
||||
#### Story point allocation
|
||||
|
||||
Story points per developer per milestone.
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~172 SP |
|
||||
| M2 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~208 SP |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~104 SP |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~126 SP |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~129 SP |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~100 SP |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M6+ | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| **Total** | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~1649 SP |
|
||||
|
||||
### 2026-04-14 (Day 104) — Cycle 2
|
||||
|
||||
**Summary**
|
||||
|
||||
Status: Behind 35+d
|
||||
Deadline risk: CRITICAL
|
||||
|
||||
**Notes**
|
||||
|
||||
- Day 104 Cycle 2 update (2026-04-14, ~1h after Cycle 1). AUTO-TIME [AUTO-TIME-1]. Continued scope expansion observed within the same day.
|
||||
- Scope grew further since Cycle 1 (1h ago): M3 grew 1112→1132 (+20), M4 grew 280→298 (+18), M5 grew 382→390 (+8), M6 grew 1301→1320 (+19), M7 grew 488→490 (+2), M8 grew 1027→1030 (+3), v3.9.0 grew 36→40 (+4). Agent-driven issue creation continues at high velocity.
|
||||
- Milestone completions (Day 104 Cycle 2): M3 23.8% (269/1132, was 24.2%), M4 37.2% (111/298, was 39.6%), M5 35.9% (140/390, was 36.6%), M6 16.4% (217/1320, was 16.6%), M7 31.2% (153/490, was 31.4%), M8 41.6% (428/1030, was 41.7%), M9 26.2% (133/507, unchanged), v3.9.0 10.0% (4/40, was 11.1%).
|
||||
- All milestones M3-M7 remain overdue. M8 and M9 have no deadlines.
|
||||
- Overall project: ~31% complete across active milestones (scope expansion outpacing closures).
|
||||
|
||||
|
||||
#### Milestone forecast
|
||||
|
||||
| Milestone | Target -> ETA | Delta | Risk |
|
||||
|-----------|---------------|-------|------|
|
||||
| M1 (v3.0.0) | (2026-02-15) -> COMPLETE | 0d | COMPLETE |
|
||||
| M2 (v3.1.0) | (2026-02-22) -> COMPLETE | 0d | COMPLETE |
|
||||
| M3 (v3.2.0) | (2026-02-26) -> ETA 2026-07-15 | +140d | CRITICAL — 863 open issues; 23.8% complete (scope expanded 1112→1132) |
|
||||
| M4 (v3.3.0) | (2026-03-02) -> ETA 2026-06-15 | +105d | CRITICAL — 187 open issues; 37.2% complete (scope expanded 280→298) |
|
||||
| M5 (v3.4.0) | (2026-03-06) -> ETA 2026-06-30 | +116d | HIGH — 250 open issues; 35.9% complete (scope expanded 382→390) |
|
||||
| M6 (v3.5.0) | (2026-03-10) -> ETA 2026-09-15 | +189d | CRITICAL — 1103 open issues; 16.4% complete (scope expanded 1301→1320) |
|
||||
| M7 (v3.6.0) | (2026-03-28) -> ETA 2026-07-30 | +124d | HIGH — 337 open issues; 31.2% complete (scope expanded 488→490) |
|
||||
| M8 (v3.7.0) | (no deadline) -> ETA 2026-08-15 | N/A | HIGH — 602 open issues; 41.6% complete (scope expanded 1027→1030) |
|
||||
| M9 (v3.8.0) | (no deadline) -> ETA 2026-09-01 | N/A | MEDIUM — 374 open issues; 26.2% complete (unchanged) |
|
||||
| v3.9.0 | (no deadline) -> ETA TBD | N/A | LOW — 36 open issues; 10.0% complete (scope expanded 36→40) |
|
||||
|
||||
#### Track forecast
|
||||
|
||||
| Track | Status | ETA | Risk | Blocking |
|
||||
|-------|--------|-----|------|----------|
|
||||
| Track A (Plan lifecycle + persistence) | Complete | Done | LOW | None |
|
||||
| Track B (Projects/resources + sandbox) | In Progress | ETA 2026-06-30 | HIGH | 250 open issues in v3.4.0; scope grew +8 in 1h |
|
||||
| Track C (Actors/tools/skills/validations) | In Progress | ETA 2026-06-15 | CRITICAL | 187 open issues in v3.3.0; scope grew +18 in 1h |
|
||||
| Track D (Change tracking + apply pipeline) | In Progress | ETA 2026-07-15 | CRITICAL | 863 open issues in v3.2.0; scope grew +20 in 1h |
|
||||
| Track Q (Quality automation) | Ongoing | N/A | HIGH | Scope explosion continuing; agent-driven issue creation at high velocity |
|
||||
| Track T (Testing) | Active | Ongoing | HIGH | All milestones overdue; massive open issue backlogs |
|
||||
|
||||
#### Developer forecast
|
||||
|
||||
| Name | Days Ahead/Behind | Availability | Risk | Focus |
|
||||
|------|-------------------|--------------|------|-------|
|
||||
| Jeff | -35d behind | active | HIGH | Session 4 supervisor; M3/M4/M5 backlog clearance; architecture oversight |
|
||||
| Luis | -35d behind | active | HIGH | M6 (v3.5.0) features; security hardening; PR review pool |
|
||||
| Hamza | -35d behind | active | HIGH | Resource DAG; v3.6.0 features; PR reviews |
|
||||
| Aditya | -35d behind | active | HIGH | M5 features; TDD counterparts; domain model work |
|
||||
| Brent | -35d behind | active | HIGH | Bug fixes; TDD counterparts; quality automation |
|
||||
| Rui | -35d behind | active | HIGH | TUI features; UAT bug fixes; E2E testing |
|
||||
| Mike/Brian | N/A | standby | LOW | Infrastructure support |
|
||||
|
||||
#### Task inventory
|
||||
|
||||
Milestone per developer as of Day 104 Cycle 2 (2026-04-14).
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | 29/29 | 16/16 | N/A | 4/4 | 10/10 | N/A | 35/35 | 96/96 |
|
||||
| M2 | 26/26 | 14/14 | N/A | 1/1 | 5/5 | N/A | 6/6 | 56/56 |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | 863 open | 269/1132 |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | 187 open | 111/298 |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | 250 open | 140/390 |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | 1103 open | 217/1320 |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | 337 open | 153/490 |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | 602 open | 428/1030 |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | 374 open | 133/507 |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | 36 open | 4/40 |
|
||||
| **Total** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **~3552 open** | **1860/5318 closed** |
|
||||
|
||||
Note: "done/total" = closed/total for that milestone. Scope expansion continues within same day. Agent-driven issue creation at high velocity.
|
||||
|
||||
#### Story point allocation
|
||||
|
||||
Story points per developer per milestone.
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~172 SP |
|
||||
| M2 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~208 SP |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~104 SP |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~126 SP |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~129 SP |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~100 SP |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M6+ | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| **Total** | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~1649 SP |
|
||||
|
||||
### 2026-04-14 (Day 104) — Cycle 3
|
||||
|
||||
**Summary**
|
||||
|
||||
Status: Behind 35+d
|
||||
Deadline risk: CRITICAL
|
||||
|
||||
**Notes**
|
||||
|
||||
- Day 104 Cycle 3 update (2026-04-14). AUTO-TIME [AUTO-TIME-1]. Note: master branch is protected; PRs are required for all changes including timeline updates.
|
||||
- Scope grew further since Cycle 2: M3 grew 1132→1163 (+31), M4 grew 298→303 (+5), M5 grew 390→392 (+2), M6 grew 1320→1326 (+6), v3.9.0 grew 40→43 (+3). Agent-driven issue creation continues at high velocity.
|
||||
- Milestone completions (Day 104 Cycle 3): M3 23.1% (269/1163), M4 36.6% (111/303), M5 35.7% (140/392), M6 16.4% (217/1326), M7 31.2% (153/490), M8 41.6% (428/1030), M9 26.2% (133/507), v3.9.0 9.3% (4/43).
|
||||
- All milestones M3-M7 remain overdue. M8 and M9 have no deadlines.
|
||||
- Overall project: ~31% complete across active milestones.
|
||||
|
||||
|
||||
#### Milestone forecast
|
||||
|
||||
| Milestone | Target -> ETA | Delta | Risk |
|
||||
|-----------|---------------|-------|------|
|
||||
| M1 (v3.0.0) | (2026-02-15) -> COMPLETE | 0d | COMPLETE |
|
||||
| M2 (v3.1.0) | (2026-02-22) -> COMPLETE | 0d | COMPLETE |
|
||||
| M3 (v3.2.0) | (2026-02-26) -> ETA 2026-07-15 | +140d | CRITICAL — 894 open issues; 23.1% complete (scope expanded 1132→1163) |
|
||||
| M4 (v3.3.0) | (2026-03-02) -> ETA 2026-06-15 | +105d | CRITICAL — 192 open issues; 36.6% complete (scope expanded 298→303) |
|
||||
| M5 (v3.4.0) | (2026-03-06) -> ETA 2026-06-30 | +116d | HIGH — 252 open issues; 35.7% complete (scope expanded 390→392) |
|
||||
| M6 (v3.5.0) | (2026-03-10) -> ETA 2026-09-15 | +189d | CRITICAL — 1109 open issues; 16.4% complete (scope expanded 1320→1326) |
|
||||
| M7 (v3.6.0) | (2026-03-28) -> ETA 2026-07-30 | +124d | HIGH — 337 open issues; 31.2% complete (unchanged) |
|
||||
| M8 (v3.7.0) | (no deadline) -> ETA 2026-08-15 | N/A | HIGH — 602 open issues; 41.6% complete (unchanged) |
|
||||
| M9 (v3.8.0) | (no deadline) -> ETA 2026-09-01 | N/A | MEDIUM — 374 open issues; 26.2% complete (unchanged) |
|
||||
| v3.9.0 | (no deadline) -> ETA TBD | N/A | LOW — 39 open issues; 9.3% complete (scope expanded 40→43) |
|
||||
|
||||
#### Track forecast
|
||||
|
||||
| Track | Status | ETA | Risk | Blocking |
|
||||
|-------|--------|-----|------|----------|
|
||||
| Track A (Plan lifecycle + persistence) | Complete | Done | LOW | None |
|
||||
| Track B (Projects/resources + sandbox) | In Progress | ETA 2026-06-30 | HIGH | 252 open issues in v3.4.0 |
|
||||
| Track C (Actors/tools/skills/validations) | In Progress | ETA 2026-06-15 | CRITICAL | 192 open issues in v3.3.0 |
|
||||
| Track D (Change tracking + apply pipeline) | In Progress | ETA 2026-07-15 | CRITICAL | 894 open issues in v3.2.0 |
|
||||
| Track Q (Quality automation) | Ongoing | N/A | HIGH | Scope explosion continuing; agent-driven issue creation at high velocity |
|
||||
| Track T (Testing) | Active | Ongoing | HIGH | All milestones overdue; massive open issue backlogs |
|
||||
|
||||
#### Developer forecast
|
||||
|
||||
| Name | Days Ahead/Behind | Availability | Risk | Focus |
|
||||
|------|-------------------|--------------|------|-------|
|
||||
| Jeff | -35d behind | active | HIGH | Session 4 supervisor; M3/M4/M5 backlog clearance |
|
||||
| Luis | -35d behind | active | HIGH | M6 (v3.5.0) features; security hardening |
|
||||
| Hamza | -35d behind | active | HIGH | Resource DAG; v3.6.0 features |
|
||||
| Aditya | -35d behind | active | HIGH | M5 features; TDD counterparts |
|
||||
| Brent | -35d behind | active | HIGH | Bug fixes; TDD counterparts; quality automation |
|
||||
| Rui | -35d behind | active | HIGH | TUI features; UAT bug fixes; E2E testing |
|
||||
| Mike/Brian | N/A | standby | LOW | Infrastructure support |
|
||||
|
||||
#### Task inventory
|
||||
|
||||
Milestone per developer as of Day 104 Cycle 3 (2026-04-14).
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | 29/29 | 16/16 | N/A | 4/4 | 10/10 | N/A | 35/35 | 96/96 |
|
||||
| M2 | 26/26 | 14/14 | N/A | 1/1 | 5/5 | N/A | 6/6 | 56/56 |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | 894 open | 269/1163 |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | 192 open | 111/303 |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | 252 open | 140/392 |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | 1109 open | 217/1326 |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | 337 open | 153/490 |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | 602 open | 428/1030 |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | 374 open | 133/507 |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | 39 open | 4/43 |
|
||||
| **Total** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **~3599 open** | **1861/5326 closed** |
|
||||
|
||||
Note: "done/total" = closed/total for that milestone. Scope expansion continues. Agent-driven issue creation at high velocity.
|
||||
|
||||
#### Story point allocation
|
||||
|
||||
Story points per developer per milestone.
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~172 SP |
|
||||
| M2 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~208 SP |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~104 SP |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~126 SP |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~129 SP |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~100 SP |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
|
||||
### 2026-04-14 (Day 104) — Cycle 4
|
||||
|
||||
**Summary**
|
||||
|
||||
Status: Behind 35+d
|
||||
Deadline risk: CRITICAL
|
||||
|
||||
**Notes**
|
||||
|
||||
- Day 104 Cycle 4 update (2026-04-14). AUTO-TIME [AUTO-TIME-1]. Minimal scope changes since Cycle 3 (~1h ago).
|
||||
- Scope changes since Cycle 3: M3 grew 1163→1169 (+6), M5 grew 392→393 (+1), M6 grew 1326→1327 (+1). All other milestones unchanged.
|
||||
- Milestone completions (Day 104 Cycle 4): M3 23.0% (269/1169), M4 36.6% (111/303), M5 35.6% (140/393), M6 16.4% (217/1327), M7 31.2% (153/490), M8 41.6% (428/1030), M9 26.2% (133/507), v3.9.0 9.3% (4/43).
|
||||
- All milestones M3-M7 remain overdue. M8 and M9 have no deadlines.
|
||||
- Overall project: ~31% complete across active milestones.
|
||||
|
||||
|
||||
#### Milestone forecast
|
||||
|
||||
| Milestone | Target -> ETA | Delta | Risk |
|
||||
|-----------|---------------|-------|------|
|
||||
| M1 (v3.0.0) | (2026-02-15) -> COMPLETE | 0d | COMPLETE |
|
||||
| M2 (v3.1.0) | (2026-02-22) -> COMPLETE | 0d | COMPLETE |
|
||||
| M3 (v3.2.0) | (2026-02-26) -> ETA 2026-07-15 | +140d | CRITICAL — 900 open issues; 23.0% complete (scope expanded 1163→1169) |
|
||||
| M4 (v3.3.0) | (2026-03-02) -> ETA 2026-06-15 | +105d | CRITICAL — 192 open issues; 36.6% complete (unchanged) |
|
||||
| M5 (v3.4.0) | (2026-03-06) -> ETA 2026-06-30 | +116d | HIGH — 253 open issues; 35.6% complete (scope expanded 392→393) |
|
||||
| M6 (v3.5.0) | (2026-03-10) -> ETA 2026-09-15 | +189d | CRITICAL — 1110 open issues; 16.4% complete (scope expanded 1326→1327) |
|
||||
| M7 (v3.6.0) | (2026-03-28) -> ETA 2026-07-30 | +124d | HIGH — 337 open issues; 31.2% complete (unchanged) |
|
||||
| M8 (v3.7.0) | (no deadline) -> ETA 2026-08-15 | N/A | HIGH — 602 open issues; 41.6% complete (unchanged) |
|
||||
| M9 (v3.8.0) | (no deadline) -> ETA 2026-09-01 | N/A | MEDIUM — 374 open issues; 26.2% complete (unchanged) |
|
||||
| v3.9.0 | (no deadline) -> ETA TBD | N/A | LOW — 39 open issues; 9.3% complete (unchanged) |
|
||||
|
||||
#### Task inventory
|
||||
|
||||
Milestone per developer as of Day 104 Cycle 4 (2026-04-14).
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | 29/29 | 16/16 | N/A | 4/4 | 10/10 | N/A | 35/35 | 96/96 |
|
||||
| M2 | 26/26 | 14/14 | N/A | 1/1 | 5/5 | N/A | 6/6 | 56/56 |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | 900 open | 269/1169 |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | 192 open | 111/303 |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | 253 open | 140/393 |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | 1110 open | 217/1327 |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | 337 open | 153/490 |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | 602 open | 428/1030 |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | 374 open | 133/507 |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | 39 open | 4/43 |
|
||||
| **Total** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **~3607 open** | **1861/5327 closed** |
|
||||
|
||||
Note: "done/total" = closed/total for that milestone. Minimal scope changes since Cycle 3. Agent-driven issue creation continues.
|
||||
|
||||
#### Story point allocation
|
||||
|
||||
Story points per developer per milestone.
|
||||
|
||||
| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total |
|
||||
|-----------|------|--------|------|-------|-------|-----|------------|-------|
|
||||
| M1 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~172 SP |
|
||||
| M2 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~208 SP |
|
||||
| M3 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~104 SP |
|
||||
| M4 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~126 SP |
|
||||
| M5 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~129 SP |
|
||||
| M6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M7 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~100 SP |
|
||||
| M8 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| M6+ | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP |
|
||||
| **Total** | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~1649 SP |
|
||||
|
||||