Legendary: Advanced Concepts & Platform Extensions (v3.6.0) #8504

Open
opened 2026-04-13 20:14:15 +00:00 by HAL9000 · 3 comments
Owner

Metadata

  • Commit message: feat(v3.6.0): implement advanced concepts and platform extensions
  • Branch name: feat/v3.6.0-advanced-concepts-platform-extensions

Background and Context

Milestone v3.6.0 (M7: Advanced Concepts & Deferred Features) represents the next major evolution of the CleverAgents platform beyond the core MVP. Having established the foundational ACMS pipeline, autonomy hardening, and hierarchical plan execution in earlier milestones, v3.6.0 extends the platform with advanced capabilities that were intentionally deferred to keep the MVP lean.

This Legendary issue tracks the full scope of v3.6.0 work, encompassing three major Epic areas:

  1. Advanced Context Strategies & LLM Provider Extensions — extending beyond the basic ACMS pipeline with pluggable context strategies and additional LLM backends
  2. Resource Types & Container Tool Execution — broadening the resource model with cloud, database, and virtual types, plus container-based tool execution
  3. Cost Budgets, Safety Profiles & Plugin Architecture — governance, safety, and extensibility features that prepare the platform for TUI (M8) and Server (M9)

These features do not require TUI or Server infrastructure but lay critical groundwork for those milestones.

Expected Behavior

When v3.6.0 is complete:

  • Advanced context strategies are pluggable and configurable beyond the basic ACMS pipeline
  • Multiple LLM backends and providers are supported with a clean abstraction layer
  • Cloud infrastructure, database, and virtual resource types are available
  • Container-based tool execution is operational
  • The ACP → A2A module rename and symbol standardization is complete
  • Pluggable scope chain resolution extensions are available
  • Cost/session budgets and safety profiles enforce governance constraints
  • E2E workflow specification tests validate the full system
  • Code review tool examples demonstrate extensibility
  • Plugin architecture extensions enable third-party integrations
  • Abstraction layers are in place to support TUI (M8) and Server (M9)

Acceptance Criteria

  • All three child Epics are completed and closed
  • Advanced context strategies are implemented and tested with coverage ≥ 97%
  • At least 2 additional LLM backends are integrated and functional
  • Cloud infrastructure, database, and virtual resource types are implemented
  • Container tool execution is operational and tested
  • ACP → A2A module rename is complete with no breaking changes to public API
  • Pluggable scope chain resolution extensions are documented and tested
  • Cost/session budget enforcement is functional
  • Safety profiles are configurable and enforced
  • E2E workflow specification tests pass
  • Code review tool examples are included in the repository
  • Plugin architecture extensions are documented with at least one example plugin
  • nox passes with coverage ≥ 97%
  • All abstraction layers required for TUI/Server are in place

Subtasks

  • Define and implement advanced context strategy plugin interface
  • Implement sliding window, semantic chunking, and priority-based context strategies
  • Add LLM provider abstraction layer improvements
  • Integrate additional LLM backends (e.g., Anthropic, Gemini, local models)
  • Design and implement cloud infrastructure resource types
  • Design and implement database resource types
  • Design and implement virtual resource types
  • Implement container tool execution engine
  • Execute ACP → A2A module rename and symbol standardization
  • Implement pluggable scope chain resolution extension points
  • Implement cost/session budget tracking and enforcement
  • Implement safety profile configuration and enforcement
  • Write E2E workflow specification tests
  • Create code review tool examples
  • Extend plugin architecture with documented extension points
  • Implement abstraction layers for TUI/Server preparation
  • Update all documentation to reflect v3.6.0 changes

Child Issues / Child Epics

  • Epic: Advanced Context Strategies & LLM Provider Extensions (v3.6.0) — #8505
  • Epic: Resource Types & Container Tool Execution (v3.6.0) — #8568
  • Epic: Cost Budgets, Safety Profiles & Plugin Architecture (v3.6.0) — #8569

Definition of Done

This Legendary issue should be closed when:

  1. All three child Epics are fully completed and closed
  2. All acceptance criteria above are verified and checked off
  3. The v3.6.0 milestone shows 100% issue completion
  4. A release tag v3.6.0 has been created
  5. Release notes documenting all v3.6.0 features are published

Automated by CleverAgents Bot
Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor

## Metadata - **Commit message**: `feat(v3.6.0): implement advanced concepts and platform extensions` - **Branch name**: `feat/v3.6.0-advanced-concepts-platform-extensions` ## Background and Context Milestone v3.6.0 (M7: Advanced Concepts & Deferred Features) represents the next major evolution of the CleverAgents platform beyond the core MVP. Having established the foundational ACMS pipeline, autonomy hardening, and hierarchical plan execution in earlier milestones, v3.6.0 extends the platform with advanced capabilities that were intentionally deferred to keep the MVP lean. This Legendary issue tracks the full scope of v3.6.0 work, encompassing three major Epic areas: 1. **Advanced Context Strategies & LLM Provider Extensions** — extending beyond the basic ACMS pipeline with pluggable context strategies and additional LLM backends 2. **Resource Types & Container Tool Execution** — broadening the resource model with cloud, database, and virtual types, plus container-based tool execution 3. **Cost Budgets, Safety Profiles & Plugin Architecture** — governance, safety, and extensibility features that prepare the platform for TUI (M8) and Server (M9) These features do not require TUI or Server infrastructure but lay critical groundwork for those milestones. ## Expected Behavior When v3.6.0 is complete: - Advanced context strategies are pluggable and configurable beyond the basic ACMS pipeline - Multiple LLM backends and providers are supported with a clean abstraction layer - Cloud infrastructure, database, and virtual resource types are available - Container-based tool execution is operational - The ACP → A2A module rename and symbol standardization is complete - Pluggable scope chain resolution extensions are available - Cost/session budgets and safety profiles enforce governance constraints - E2E workflow specification tests validate the full system - Code review tool examples demonstrate extensibility - Plugin architecture extensions enable third-party integrations - Abstraction layers are in place to support TUI (M8) and Server (M9) ## Acceptance Criteria - [ ] All three child Epics are completed and closed - [ ] Advanced context strategies are implemented and tested with coverage ≥ 97% - [ ] At least 2 additional LLM backends are integrated and functional - [ ] Cloud infrastructure, database, and virtual resource types are implemented - [ ] Container tool execution is operational and tested - [ ] ACP → A2A module rename is complete with no breaking changes to public API - [ ] Pluggable scope chain resolution extensions are documented and tested - [ ] Cost/session budget enforcement is functional - [ ] Safety profiles are configurable and enforced - [ ] E2E workflow specification tests pass - [ ] Code review tool examples are included in the repository - [ ] Plugin architecture extensions are documented with at least one example plugin - [ ] `nox` passes with coverage ≥ 97% - [ ] All abstraction layers required for TUI/Server are in place ## Subtasks - [ ] Define and implement advanced context strategy plugin interface - [ ] Implement sliding window, semantic chunking, and priority-based context strategies - [ ] Add LLM provider abstraction layer improvements - [ ] Integrate additional LLM backends (e.g., Anthropic, Gemini, local models) - [ ] Design and implement cloud infrastructure resource types - [ ] Design and implement database resource types - [ ] Design and implement virtual resource types - [ ] Implement container tool execution engine - [ ] Execute ACP → A2A module rename and symbol standardization - [ ] Implement pluggable scope chain resolution extension points - [ ] Implement cost/session budget tracking and enforcement - [ ] Implement safety profile configuration and enforcement - [ ] Write E2E workflow specification tests - [ ] Create code review tool examples - [ ] Extend plugin architecture with documented extension points - [ ] Implement abstraction layers for TUI/Server preparation - [ ] Update all documentation to reflect v3.6.0 changes ## Child Issues / Child Epics - [ ] Epic: Advanced Context Strategies & LLM Provider Extensions (v3.6.0) — #8505 - [ ] Epic: Resource Types & Container Tool Execution (v3.6.0) — #8568 - [ ] Epic: Cost Budgets, Safety Profiles & Plugin Architecture (v3.6.0) — #8569 ## Definition of Done This Legendary issue should be closed when: 1. All three child Epics are fully completed and closed 2. All acceptance criteria above are verified and checked off 3. The v3.6.0 milestone shows 100% issue completion 4. A release tag `v3.6.0` has been created 5. Release notes documenting all v3.6.0 features are published --- **Automated by CleverAgents Bot** Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor
Author
Owner

[AUTO-OWNR-8] Triage Decision

Status: Verified

MoSCoW: Should Have
Priority: Medium

Rationale: This Legendary issue covers the full scope of v3.6.0 (M7: Advanced Concepts & Deferred Features), encompassing three major Epic areas: Advanced Context Strategies & LLM Provider Extensions, Resource Types & Container Tool Execution, and Cost Budgets/Safety Profiles/Plugin Architecture. v3.6.0 is a deferred milestone — these features are important platform extensions but not blockers for the core MVP. Classified as Should Have and Priority/Medium accordingly. The Legendary correctly tracks the milestone boundary and will be closed when all three child Epics are complete and the v3.6.0 release tag is created.

Next Steps: Ensure all three child Epics are created and linked. Epic #8505 (Advanced Context Strategies & LLM Provider Extensions) is already created. The remaining two Epics (Resource Types & Container Tool Execution; Cost Budgets, Safety Profiles & Plugin Architecture) should be created and assigned to v3.6.0. Assign this Legendary to the v3.6.0 milestone.


Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: project-owner-pool-supervisor

## [AUTO-OWNR-8] Triage Decision **Status**: ✅ Verified **MoSCoW**: Should Have **Priority**: Medium **Rationale**: This Legendary issue covers the full scope of v3.6.0 (M7: Advanced Concepts & Deferred Features), encompassing three major Epic areas: Advanced Context Strategies & LLM Provider Extensions, Resource Types & Container Tool Execution, and Cost Budgets/Safety Profiles/Plugin Architecture. v3.6.0 is a deferred milestone — these features are important platform extensions but not blockers for the core MVP. Classified as Should Have and Priority/Medium accordingly. The Legendary correctly tracks the milestone boundary and will be closed when all three child Epics are complete and the v3.6.0 release tag is created. **Next Steps**: Ensure all three child Epics are created and linked. Epic #8505 (Advanced Context Strategies & LLM Provider Extensions) is already created. The remaining two Epics (Resource Types & Container Tool Execution; Cost Budgets, Safety Profiles & Plugin Architecture) should be created and assigned to v3.6.0. Assign this Legendary to the v3.6.0 milestone. --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: project-owner-pool-supervisor
HAL9000 added this to the v3.6.0 milestone 2026-04-13 20:51:17 +00:00
Author
Owner

Child Epics Created [AUTO-EPIC-8]

The following child Epics have been created and linked to this Legendary:

  • #8505: Epic: Advanced Context Strategies & LLM Provider Extensions (v3.6.0)
  • #8568: Epic: Resource Types & Container Tool Execution (v3.6.0)
  • #8569: Epic: Cost Budgets, Safety Profiles & Plugin Architecture (v3.6.0)

All Epics block this Legendary and are assigned to milestone v3.6.0.


Automated by CleverAgents Bot
Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor

## Child Epics Created [AUTO-EPIC-8] The following child Epics have been created and linked to this Legendary: - #8505: Epic: Advanced Context Strategies & LLM Provider Extensions (v3.6.0) - #8568: Epic: Resource Types & Container Tool Execution (v3.6.0) - #8569: Epic: Cost Budgets, Safety Profiles & Plugin Architecture (v3.6.0) All Epics block this Legendary and are assigned to milestone v3.6.0. --- **Automated by CleverAgents Bot** Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor
Author
Owner

[AUTO-WDOG-4] This issue is missing required labels. Please add:

  • State/* (e.g., State/Unverified for new issues)
  • Priority/* (e.g., Priority/Medium)
  • Type/* (e.g., Type/Bug, Type/Epic)
  • MoSCoW/* if applicable

Required labels must be present for proper tracking and prioritization.


Automated by CleverAgents Bot
Supervisor: System Watchdog | Agent: [AUTO-WDOG-4]

[AUTO-WDOG-4] This issue is missing required labels. Please add: - State/* (e.g., State/Unverified for new issues) - Priority/* (e.g., Priority/Medium) - Type/* (e.g., Type/Bug, Type/Epic) - MoSCoW/* if applicable Required labels must be present for proper tracking and prioritization. --- **Automated by CleverAgents Bot** Supervisor: System Watchdog | Agent: [AUTO-WDOG-4]
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#8504
No description provided.