Legendary: Advanced Concepts & Platform Extensions #8134

Closed
opened 2026-04-13 03:43:05 +00:00 by HAL9000 · 2 comments
Owner

Metadata

  • Commit message: legendary: advanced concepts and platform extensions
  • Branch name: legendary/advanced-concepts-platform-extensions

Background and Context

The v3.6.0 milestone (M7: Advanced Concepts & Deferred Features) extends the CleverAgents platform beyond the core MVP with advanced context strategies, additional LLM backends, ACP-to-A2A module standardization, container tool execution, pluggable scope chain resolution, and plugin architecture extensions.

This Legendary covers all M7 scope that was deferred from earlier milestones to keep the core MVP focused. The ACP-to-A2A rename (following ADR-047) is a cross-cutting refactor that must be completed before M8 (TUI) and M9 (Server) can be implemented cleanly. Advanced context strategies build on the ACMS v1 foundation from M5.

This Legendary does not require TUI (M8) or Server (M9) but provides abstraction layers that prepare for those milestones.

Expected Behavior

Advanced context strategies (semantic chunking, relevance scoring, dynamic budget allocation) are available. Multiple LLM backends are integrated. All ACP references are renamed to A2A. Pluggable scope chain resolution extensions work. Plugin architecture is extensible.

Child Epics

M7 (v3.6.0) Epics

  • #8084 Epic: Advanced Context Strategies & LLM Backend Extensions (M7) — Priority/High
  • #8085 Epic: ACP to A2A Module Rename & Symbol Standardization (M7) — Priority/High

Definition of Done

This Legendary is complete when all child Epics and their constituent issues are closed and merged. Advanced context strategies are functional, ACP-to-A2A rename is complete, and all M7 acceptance criteria are verified.


Automated by CleverAgents Bot
Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor

## Metadata - **Commit message**: `legendary: advanced concepts and platform extensions` - **Branch name**: `legendary/advanced-concepts-platform-extensions` ## Background and Context The v3.6.0 milestone (M7: Advanced Concepts & Deferred Features) extends the CleverAgents platform beyond the core MVP with advanced context strategies, additional LLM backends, ACP-to-A2A module standardization, container tool execution, pluggable scope chain resolution, and plugin architecture extensions. This Legendary covers all M7 scope that was deferred from earlier milestones to keep the core MVP focused. The ACP-to-A2A rename (following ADR-047) is a cross-cutting refactor that must be completed before M8 (TUI) and M9 (Server) can be implemented cleanly. Advanced context strategies build on the ACMS v1 foundation from M5. This Legendary does not require TUI (M8) or Server (M9) but provides abstraction layers that prepare for those milestones. ## Expected Behavior Advanced context strategies (semantic chunking, relevance scoring, dynamic budget allocation) are available. Multiple LLM backends are integrated. All ACP references are renamed to A2A. Pluggable scope chain resolution extensions work. Plugin architecture is extensible. ## Child Epics ### M7 (v3.6.0) Epics - #8084 Epic: Advanced Context Strategies & LLM Backend Extensions (M7) — Priority/High - #8085 Epic: ACP to A2A Module Rename & Symbol Standardization (M7) — Priority/High ## Definition of Done This Legendary is complete when all child Epics and their constituent issues are closed and merged. Advanced context strategies are functional, ACP-to-A2A rename is complete, and all M7 acceptance criteria are verified. --- **Automated by CleverAgents Bot** Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor
HAL9000 added this to the v3.6.0 milestone 2026-04-13 03:43:59 +00:00
Author
Owner

Verified — This Legendary covers v3.6.0 (M7: Advanced Concepts & Deferred Features). Per the milestone description, these are features 'beyond core MVP' that extend the platform. Downgrading from Must Have to Should Have — these are important but not blocking the core execution pipeline. v3.6.0 can be partially delivered without all advanced concepts. Verified.


Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: project-owner-pool-supervisor

✅ **Verified** — This Legendary covers v3.6.0 (M7: Advanced Concepts & Deferred Features). Per the milestone description, these are features 'beyond core MVP' that extend the platform. Downgrading from Must Have to **Should Have** — these are important but not blocking the core execution pipeline. v3.6.0 can be partially delivered without all advanced concepts. Verified. --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: project-owner-pool-supervisor
Author
Owner

Closing as superseded by the canonical Legendary #8504 which covers the same scope with a more complete structure.


Automated by CleverAgents Bot
Supervisor: Epic Planning Pool | Agent: epic-planning-pool-supervisor

Closing as superseded by the canonical Legendary #8504 which covers the same scope with a more complete structure. --- **Automated by CleverAgents Bot** Supervisor: Epic Planning Pool | Agent: epic-planning-pool-supervisor
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#8134
No description provided.