[AUTO-SPEC] Specification Update (Cycle 11) #7781

Closed
opened 2026-04-12 03:33:21 +00:00 by HAL9000 · 3 comments
Owner

Specification Update Status — Cycle 11

Agent: spec-updater
Cycle: 11
Estimated Cycle Interval: 15min
Updated: 2026-04-12
Status: Active — Initializing

Summary

Cycle 11 starting. Fresh session. Reviewing pending proposals and recently merged PRs.

Master Branch

  • Current SHA: b89b781881
  • New PRs merged since last cycle: 2 (PR #6893 timeline update, PR #5289 automation-tracking docs)

Pending Proposals

Issue Title Status
#7533 validation attach synopsis + project delete output State/Verified — PR #7589 open
#6958 GitWorktreeSandbox class + non-git fallback + idempotent execute Needs Feedback
#6953 ContextTierHydrator + LLMExecuteActor constructor injection Needs Feedback
#6873 resource stop/rebuild scope, A2A facade caching, TUI optional dep, devcontainer split Needs Feedback
#6195 Restructure monolithic spec (47k lines) into docs/specification/ Needs Feedback
#6194 ACMS built-in strategy real retrieval algorithms Needs Feedback

Active PRs

PR Description Status
#7589 docs(spec): validation attach synopsis + project delete output Open, awaiting review

Health Indicators

  • Specification Alignment: ~98% aligned (pending proposals address remaining gaps)
  • Proposals Pending: 6
  • PRs Open: 1
  • PRs Merged: 0 (awaiting human review)

Automated by CleverAgents Bot
Supervisor: Spec Evolution | Agent: spec-updater

# Specification Update Status — Cycle 11 **Agent**: spec-updater **Cycle**: 11 **Estimated Cycle Interval**: 15min **Updated**: 2026-04-12 **Status**: Active — Initializing ## Summary Cycle 11 starting. Fresh session. Reviewing pending proposals and recently merged PRs. ## Master Branch - **Current SHA**: b89b781881096b112e529f47c33aaddc104d4ff6 - **New PRs merged since last cycle**: 2 (PR #6893 timeline update, PR #5289 automation-tracking docs) ## Pending Proposals | Issue | Title | Status | |-------|-------|--------| | #7533 | validation attach synopsis + project delete output | State/Verified — PR #7589 open | | #6958 | GitWorktreeSandbox class + non-git fallback + idempotent execute | Needs Feedback | | #6953 | ContextTierHydrator + LLMExecuteActor constructor injection | Needs Feedback | | #6873 | resource stop/rebuild scope, A2A facade caching, TUI optional dep, devcontainer split | Needs Feedback | | #6195 | Restructure monolithic spec (47k lines) into docs/specification/ | Needs Feedback | | #6194 | ACMS built-in strategy real retrieval algorithms | Needs Feedback | ## Active PRs | PR | Description | Status | |----|-------------|--------| | #7589 | docs(spec): validation attach synopsis + project delete output | Open, awaiting review | ## Health Indicators - **Specification Alignment**: ~98% aligned (pending proposals address remaining gaps) - **Proposals Pending**: 6 - **PRs Open**: 1 - **PRs Merged**: 0 (awaiting human review) --- **Automated by CleverAgents Bot** Supervisor: Spec Evolution | Agent: spec-updater
Author
Owner

Cycle 11 Update — Initial Scan Complete

Master SHA: ca2eaab02d
Scan Time: 2026-04-12

Actions Taken

  1. Closed previous tracking issue #7684 (Cycle 10)
  2. PR #7589 maintenance: Added milestone v3.2.0 (addressing reviewer feedback)
  3. New proposal created: #7791agents plan tree full ULID display (from PR #6571)

Pending Proposals Status

Issue Title Labels Action
#7533 validation attach + project delete State/Verified PR #7589 open
#7791 plan tree full ULIDs Needs Feedback NEW — awaiting approval
#6958 GitWorktreeSandbox details Needs Feedback Awaiting approval
#6953 ContextTierHydrator + injection Needs Feedback Awaiting approval
#6873 resource stop/rebuild + A2A + TUI Needs Feedback Awaiting approval
#6195 Spec restructure (47k→split) Needs Feedback Awaiting approval
#6194 ACMS strategy algorithms Needs Feedback Awaiting approval

Next Steps

  • Sleep 15 minutes, then re-check for new merged PRs and proposal approvals
  • Monitor PR #7589 for merge

Automated by CleverAgents Bot
Supervisor: Spec Evolution | Agent: spec-updater

## Cycle 11 Update — Initial Scan Complete **Master SHA**: ca2eaab02d65ed684cc21d14a568474af1a917fa **Scan Time**: 2026-04-12 ### Actions Taken 1. **Closed previous tracking issue** #7684 (Cycle 10) ✅ 2. **PR #7589 maintenance**: Added milestone v3.2.0 (addressing reviewer feedback) ✅ 3. **New proposal created**: #7791 — `agents plan tree` full ULID display (from PR #6571) ✅ ### Pending Proposals Status | Issue | Title | Labels | Action | |-------|-------|--------|--------| | #7533 | validation attach + project delete | State/Verified | PR #7589 open | | #7791 | plan tree full ULIDs | Needs Feedback | NEW — awaiting approval | | #6958 | GitWorktreeSandbox details | Needs Feedback | Awaiting approval | | #6953 | ContextTierHydrator + injection | Needs Feedback | Awaiting approval | | #6873 | resource stop/rebuild + A2A + TUI | Needs Feedback | Awaiting approval | | #6195 | Spec restructure (47k→split) | Needs Feedback | Awaiting approval | | #6194 | ACMS strategy algorithms | Needs Feedback | Awaiting approval | ### Next Steps - Sleep 15 minutes, then re-check for new merged PRs and proposal approvals - Monitor PR #7589 for merge --- **Automated by CleverAgents Bot** Supervisor: Spec Evolution | Agent: spec-updater
Author
Owner

Cycle 12 Update — No New Activity

Master SHA: ca2eaab0 (unchanged)
Scan Time: 2026-04-12

Status

  • No new PRs merged since Cycle 11
  • No proposal approvals detected
  • PR #7589 still open, awaiting human review
  • All 7 proposals still pending

Proactive Scan

No new discrepancies identified in this cycle. Existing proposals cover all known gaps.

Next

Sleeping 15 minutes, then re-checking.


Automated by CleverAgents Bot
Supervisor: Spec Evolution | Agent: spec-updater

## Cycle 12 Update — No New Activity **Master SHA**: ca2eaab0 (unchanged) **Scan Time**: 2026-04-12 ### Status - No new PRs merged since Cycle 11 - No proposal approvals detected - PR #7589 still open, awaiting human review - All 7 proposals still pending ### Proactive Scan No new discrepancies identified in this cycle. Existing proposals cover all known gaps. ### Next Sleeping 15 minutes, then re-checking. --- **Automated by CleverAgents Bot** Supervisor: Spec Evolution | Agent: spec-updater
Author
Owner

Duplicate status issue cleanup: Closed by backlog groomer.
A newer status issue (#7829) exists for this agent prefix [AUTO-SPEC].


Automated by CleverAgents Bot
Supervisor: Backlog Grooming | Agent: backlog-groomer

Duplicate status issue cleanup: Closed by backlog groomer. A newer status issue (#7829) exists for this agent prefix [AUTO-SPEC]. --- **Automated by CleverAgents Bot** Supervisor: Backlog Grooming | Agent: backlog-groomer
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#7781
No description provided.