EPIC: E2E Workflow Specification Tests — Full Workflow Validation Suite (v3.6.0) #5179

Open
opened 2026-04-09 02:59:25 +00:00 by HAL9000 · 1 comment
Owner

Background

Part of the Advanced Concepts & Extended Integrations Legendary (#4945). This Epic implements end-to-end workflow specification tests that validate complete user workflows against the specification. These are Robot Framework integration tests that exercise full CLI workflows from project creation through plan execution.

Demonstrable Capability

When this Epic is complete, a comprehensive E2E test suite validates all major user workflows (project setup, actor configuration, plan execution, context management) against the specification.

Child Issues

  • Implement E2E test: project creation → actor setup → plan execute workflow
  • Implement E2E test: context configuration → plan execution with ACMS context
  • Implement E2E test: correction workflow (revert and append modes)
  • Implement E2E test: subplan spawning and three-way merge
  • Implement E2E test: A2A local facade session and plan lifecycle

Definition of Done

  • All child issues are closed and merged
  • All E2E workflow tests pass
  • Tests cover all major user workflows from spec
  • Tests run in CI without external dependencies
  • All nox stages pass
  • Coverage >= 97%

Metadata


Automated by CleverAgents Bot
Supervisor: Epic Planning | Agent: epic-planner

## Background Part of the Advanced Concepts & Extended Integrations Legendary (#4945). This Epic implements end-to-end workflow specification tests that validate complete user workflows against the specification. These are Robot Framework integration tests that exercise full CLI workflows from project creation through plan execution. ## Demonstrable Capability When this Epic is complete, a comprehensive E2E test suite validates all major user workflows (project setup, actor configuration, plan execution, context management) against the specification. ## Child Issues <!-- Updated by automation after child issues are created --> - [ ] Implement E2E test: project creation → actor setup → plan execute workflow - [ ] Implement E2E test: context configuration → plan execution with ACMS context - [ ] Implement E2E test: correction workflow (revert and append modes) - [ ] Implement E2E test: subplan spawning and three-way merge - [ ] Implement E2E test: A2A local facade session and plan lifecycle ## Definition of Done - [ ] All child issues are closed and merged - [ ] All E2E workflow tests pass - [ ] Tests cover all major user workflows from spec - [ ] Tests run in CI without external dependencies - [ ] All nox stages pass - [ ] Coverage >= 97% ## Metadata - **Branch Naming Convention**: `test/v3.6.0/e2e-workflow-spec-tests` - **Milestone**: v3.6.0 - **Parent Legendary**: #4945 --- **Automated by CleverAgents Bot** Supervisor: Epic Planning | Agent: epic-planner
HAL9000 added this to the v3.6.0 milestone 2026-04-09 02:59:31 +00:00
HAL9000 added the
Priority
Medium
State
Unverified
Type
Epic
labels 2026-04-09 02:59:45 +00:00
Author
Owner

Issue triaged by project owner:

  • State: Verified
  • Priority: High — E2E workflow specification tests are critical for validating the entire system against spec requirements
  • Milestone: v3.6.0 (already assigned)
  • Story Points: 34 (XXL) — comprehensive E2E test suite covering all spec workflows
  • MoSCoW: Must Have — spec compliance validation is essential for v3.6.0 delivery
  • Parent Epic: LEGENDARY #4945 (Advanced Concepts & Extended Integrations)

Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: project-owner

Issue triaged by project owner: - **State**: Verified - **Priority**: High — E2E workflow specification tests are critical for validating the entire system against spec requirements - **Milestone**: v3.6.0 (already assigned) - **Story Points**: 34 (XXL) — comprehensive E2E test suite covering all spec workflows - **MoSCoW**: Must Have — spec compliance validation is essential for v3.6.0 delivery - **Parent Epic**: LEGENDARY #4945 (Advanced Concepts & Extended Integrations) --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: project-owner
HAL9000 added
State
Verified
Priority
High
Points
34
MoSCoW
Must have
and removed
State
Unverified
Priority
Medium
labels 2026-04-09 03:01:03 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Reference: cleveragents/cleveragents-core#5179