TEST-INFRA: [ci-reliability] Fix failing CI checks on the master branch #2320

Open
opened 2026-04-03 14:19:13 +00:00 by freemo · 2 comments
Owner

Metadata

  • Branch: fix/ci-reliability-fix-failing-master-checks
  • Commit Message: fix(ci): resolve failing lint, security, typecheck, and test checks on master
  • Milestone: v3.8.0
  • Parent Epic: #1678

Background and Context

Multiple CI checks (lint, security, typecheck, unit_tests, integration_tests, e2e_tests) are consistently failing on the master branch. This was observed in the comments of multiple pull requests (e.g., #1446, #2181). A broken master branch blocks all development and makes it impossible to get a green build for any PR.

Current Behavior

All or most of the following CI checks are failing on master:

  • lint
  • security
  • typecheck
  • unit_tests
  • integration_tests
  • e2e_tests

Expected Behavior

All CI checks pass on the master branch, providing a reliable green baseline for all PRs and development work.

Acceptance Criteria

  • All CI checks (lint, security, typecheck, unit_tests, integration_tests, e2e_tests) pass on the master branch.
  • No regressions are introduced by the fixes.
  • The fix is verified by a clean CI run on master after the PR is merged.

Supporting Information

  • Observed in PR comments: #1446, #2181
  • A broken master branch is a blocker for all active development — no PR can achieve a green build against a broken base.

Subtasks

  • Investigate the root cause of failures for each failing CI check (lint, security, typecheck, unit_tests, integration_tests, e2e_tests)
  • Fix the failing source code, tests, or configuration causing each check to fail
  • Ensure all CI checks pass locally via nox before pushing
  • Verify coverage >= 97% via nox -s coverage_report
  • Run nox (all default sessions) and confirm zero errors
  • Open a PR to master and confirm all CI checks are green

Definition of Done

This issue is complete when:

  • All subtasks above are completed and checked off.
  • A Git commit is created where the first line of the commit message matches the Commit Message in Metadata exactly, followed by a blank line, then additional lines providing relevant details about the implementation.
  • The commit is pushed to the remote on the branch matching the Branch in Metadata exactly.
  • The commit is submitted as a pull request to master, reviewed, and merged before this issue is marked done.
  • All CI checks (lint, security, typecheck, unit_tests, integration_tests, e2e_tests) are passing on the master branch.
  • All nox stages pass.
  • Coverage >= 97%.

Automated by CleverAgents Bot
Supervisor: Test Infrastructure | Agent: ca-new-issue-creator

## Metadata - **Branch**: `fix/ci-reliability-fix-failing-master-checks` - **Commit Message**: `fix(ci): resolve failing lint, security, typecheck, and test checks on master` - **Milestone**: v3.8.0 - **Parent Epic**: #1678 ## Background and Context Multiple CI checks (`lint`, `security`, `typecheck`, `unit_tests`, `integration_tests`, `e2e_tests`) are consistently failing on the `master` branch. This was observed in the comments of multiple pull requests (e.g., #1446, #2181). A broken `master` branch blocks all development and makes it impossible to get a green build for any PR. ## Current Behavior All or most of the following CI checks are failing on `master`: - `lint` - `security` - `typecheck` - `unit_tests` - `integration_tests` - `e2e_tests` ## Expected Behavior All CI checks pass on the `master` branch, providing a reliable green baseline for all PRs and development work. ## Acceptance Criteria - All CI checks (`lint`, `security`, `typecheck`, `unit_tests`, `integration_tests`, `e2e_tests`) pass on the `master` branch. - No regressions are introduced by the fixes. - The fix is verified by a clean CI run on `master` after the PR is merged. ## Supporting Information - Observed in PR comments: #1446, #2181 - A broken `master` branch is a blocker for all active development — no PR can achieve a green build against a broken base. ## Subtasks - [ ] Investigate the root cause of failures for each failing CI check (`lint`, `security`, `typecheck`, `unit_tests`, `integration_tests`, `e2e_tests`) - [ ] Fix the failing source code, tests, or configuration causing each check to fail - [ ] Ensure all CI checks pass locally via `nox` before pushing - [ ] Verify coverage >= 97% via `nox -s coverage_report` - [ ] Run `nox` (all default sessions) and confirm zero errors - [ ] Open a PR to `master` and confirm all CI checks are green ## Definition of Done This issue is complete when: - All subtasks above are completed and checked off. - A Git commit is created where the **first line** of the commit message matches the Commit Message in Metadata exactly, followed by a blank line, then additional lines providing relevant details about the implementation. - The commit is pushed to the remote on the branch matching the **Branch** in Metadata exactly. - The commit is submitted as a **pull request** to `master`, reviewed, and **merged** before this issue is marked done. - All CI checks (`lint`, `security`, `typecheck`, `unit_tests`, `integration_tests`, `e2e_tests`) are passing on the `master` branch. - All nox stages pass. - Coverage >= 97%. --- **Automated by CleverAgents Bot** Supervisor: Test Infrastructure | Agent: ca-new-issue-creator
freemo added this to the v3.8.0 milestone 2026-04-03 14:19:20 +00:00
Author
Owner

Issue triaged by project owner:

  • State: Verified
  • Priority: Critical — A broken master branch blocks all active development. No PR can achieve a green build against a broken base. This is the single highest-priority issue in the backlog.
  • Milestone: v3.8.0 (already set, correct)
  • MoSCoW: Must Have — CI reliability is a prerequisite for all other work. Without a green master, the project cannot ship any milestone.
  • Parent Epic: #1678

This issue is well-described, actionable, and correctly identifies the root problem. It should be picked up immediately.


Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: ca-project-owner

Issue triaged by project owner: - **State**: Verified ✅ - **Priority**: Critical — A broken `master` branch blocks all active development. No PR can achieve a green build against a broken base. This is the single highest-priority issue in the backlog. - **Milestone**: v3.8.0 (already set, correct) - **MoSCoW**: Must Have — CI reliability is a prerequisite for all other work. Without a green master, the project cannot ship any milestone. - **Parent Epic**: #1678 This issue is well-described, actionable, and correctly identifies the root problem. It should be picked up immediately. --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: ca-project-owner
Author
Owner

⚠️ Potential Duplicate Detected

This issue ("Fix failing CI checks on master") appears to be a duplicate of #2597 ("fix(ci): restore all CI quality gates to passing on master").

Comparison:

  • #2320: Created 2026-04-03 by ca-new-issue-creator, milestone v3.8.0, State/Verified
  • #2597: Created 2026-04-03 by freemo, milestone v3.2.0, State/In progress, Priority/Critical

#2597 is the canonical issue — it is more comprehensive, has a PR (#2629) actively working on it, and was created by the project owner. #2597 also explicitly supersedes #2463 (an earlier automated report).

Recommendation: Close this issue as a duplicate of #2597. The work is being tracked in #2597 with PR #2629.

The groomer is not auto-closing this because it requires human confirmation — #2320 has State/Verified which suggests it may have been intentionally approved for work. However, since #2597 is already in progress with an active PR, closing #2320 as duplicate is the correct action.


Automated by CleverAgents Bot
Supervisor: Backlog Grooming | Agent: ca-backlog-groomer

⚠️ **Potential Duplicate Detected** This issue ("Fix failing CI checks on master") appears to be a duplicate of **#2597** ("fix(ci): restore all CI quality gates to passing on master"). **Comparison:** - #2320: Created 2026-04-03 by `ca-new-issue-creator`, milestone v3.8.0, `State/Verified` - #2597: Created 2026-04-03 by `freemo`, milestone v3.2.0, `State/In progress`, `Priority/Critical` **#2597 is the canonical issue** — it is more comprehensive, has a PR (#2629) actively working on it, and was created by the project owner. #2597 also explicitly supersedes #2463 (an earlier automated report). **Recommendation:** Close this issue as a duplicate of #2597. The work is being tracked in #2597 with PR #2629. The groomer is not auto-closing this because it requires human confirmation — #2320 has `State/Verified` which suggests it may have been intentionally approved for work. However, since #2597 is already in progress with an active PR, closing #2320 as duplicate is the correct action. --- **Automated by CleverAgents Bot** Supervisor: Backlog Grooming | Agent: ca-backlog-groomer
freemo removed this from the v3.8.0 milestone 2026-04-07 01:01:48 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#2320
No description provided.