From 5f5ef891a27aa4bb52fa8771863fbabbc17e95cd Mon Sep 17 00:00:00 2001 From: Jeffrey Phillips Freeman Date: Sun, 22 Mar 2026 17:29:19 -0400 Subject: [PATCH] Docs: daily update to timeline --- docs/timeline.md | 95 +++++++++++++++++++++++++++++++++++++++++++----- 1 file changed, 85 insertions(+), 10 deletions(-) diff --git a/docs/timeline.md b/docs/timeline.md index d3e187c9..6e208e5c 100644 --- a/docs/timeline.md +++ b/docs/timeline.md @@ -1958,13 +1958,13 @@ This section provides a high-level overview of the CleverAgents implementation r ### Current Status Summary -As of Day 39 (2026-03-19), the project has **50 open issues** and **50 open PRs** across 9 milestones. The project is running **5-6 days behind** the original schedule — **stabilizing after the Day 37 bug crisis**. **Major Days 38-39 developments**: (1) **Jeff fixed bugs #822 and #823** — both committed to master on Mar 17, closing the 2-day stall. (2) **Hamza merged virtual resource types** (#661, #663) to master. (3) **Luis fixed 4 critical plan lifecycle bugs** (#746, #1026) including cache sharing and action registry loading. (4) **Aditya merged TUI persona system** (#976) and estimation actor YAML (#975). (5) **Rui merged execution environment priority** (#972). (6) **Bug count reduced from 26 to 10** — major improvement. (7) **All 10 remaining bugs now have assignees and TDD counterparts** (except #1038, #1039 which are low priority). (8) **Reviewers assigned to all critical PRs** during Day 39 planning session. (9) **PR conflict rate improved** — only 2 of 50 PRs have conflicts (down from 42%). +As of Day 42 (2026-03-22), the project has **~270 open issues** (257 pre-existing + 13 new TDD issues created today) and **65 open PRs** across 9 milestones. The project is running **7-8 days behind** the original schedule — **slippage increased from Day 39** due to newly discovered specification-alignment bugs. **Major Days 39-42 developments**: (1) **Bugs #967-969 FIXED** — Brent's bugfix PRs #1055-1057 merged to master. (2) **TDD PRs merged** — #1049-1052 (plan lifecycle TDD), #1058 (ACMS tier TDD), #958 (plan apply --yes TDD). (3) **A2A facade operational** — Jeff's facade implementing 42 operations merged. (4) **Estimation actor merged** — Aditya's estimation actor YAML (#975). (5) **CI pipeline finalized** (#983). (6) **Overlay sandbox merged** (#994). (7) **Scaling tests merged** (#984). (8) **Bug count re-expanded to 26** — 6 new bugs discovered (#1076, #1078-#1080, #1038, #1039) from specification alignment review. (9) **Day 42 planning session**: all 26 bugs now assigned with TDD counterparts (13 new TDD issues created: #1091-#1103), all 58 unassigned issues assigned, all 9 milestone-less issues triaged, all 65 PRs reviewed with reviewers assigned, #1060 closed as duplicate of #1076. -**M1, M2 are fully complete. M3 has 9 open items** — 3 bugfix PRs (#1055-1057 by Brent for bugs #967-969) and 4 TDD PRs (#1049-1053) in review. **M4 has 9 open items** — bugs #1023-#1025 assigned with TDD counterparts. **M5 has 4 open items** — bugs #1022 and #1028 assigned. **M6 has 2 open items**. **M7 has 9 open items** (due Mar 28). 12 issues have no milestone and need triage. +**M1, M2 fully complete. M3 (v3.2.0)**: 63 open / 194 total (68%). **M4 (v3.3.0)**: 33 open / 95 total (65%). **M5 (v3.4.0)**: 42 open / 112 total (62%). **M6 (v3.5.0)**: 53 open / 143 total (63%). **M7 (v3.6.0)**: 66 open / 120 total (45%). **M8/M9**: 30/25 open respectively, no deadlines. -!!! warning "Schedule Risk: 5-6 Days Behind (Stabilizing) — 10 Open Bugs + Bug Backlog Clearing" +!!! warning "Schedule Risk: 7-8 Days Behind (Worsening) — 26 Open Bugs, 29 Conflicted PRs" - The project is running **5-6 days behind** — **stabilizing after the Day 37 crisis** (was 4-5d behind and worsening). Bug count dropped from 26 to 10 (62% reduction). **Day 39 priorities**: (1) **Merge TDD PRs** (#1049-1053) to unblock bugfix PRs. (2) **Merge bugfix PRs** (#1055-1057) to close M3 bugs. (3) **Start TDD issues** #1030, #1032-#1034 (Brent) and #1029, #1031, #1035 (Rui). (4) **Assign remaining 34 unassigned issues**. (5) **Triage 12 issues with no milestone**. + The project is running **7-8 days behind** — **worsening from Day 39's 5-6 day gap**. Bug count re-expanded from 10 to 26 due to specification alignment analysis. **29 of 65 PRs (45%) have merge conflicts**. **3 TDD pipelines stalled** (#821, #783, #932 — TDD closed but bugfix not started). **Day 42 priorities**: (1) **Merge priority PRs**: #1071 (v3.2.0 shell fix), #1053 (TDD for #647), #736 (deprecated tempfile), #1075 (decision correction). (2) **Start stalled bugfixes**: #821 (CoreRasurae), #783 (Aditya), #932 (hurui200320). (3) **Rebase 29 conflicted PRs**. (4) **Close M3 gap**: 63 open issues is too high for a milestone that should be feature-complete. (5) **Triage M7/M8 unassigned** — 22 issues still unassigned in v3.7.0/v3.8.0. ### Parallel Workstreams @@ -2270,15 +2270,16 @@ Items without an assigned milestone represent backlog work to be addressed after ### Schedule Risk Summary -The project is running approximately **4-5 days behind** the original aggressive schedule — **worsening from 3-4d on Day 36**. The bug count has more than doubled (12→26) in 24 hours. While PRs #929, #930, #673, #660, #803, #1027 merged on Days 36-37 (strong merge velocity), 8 new untriaged bugs and 6 new filed bugs have significantly increased the open work. **2 TDD pipelines completed but stalled** (bugs #822, #823 — TDD merged Day 36, fix branches not created). **12 bugs have no TDD counterparts** — a major process compliance gap. **21 of 50 open PRs have merge conflicts** (42%). **~150 issues remain unassigned.** The March 28 M7 deadline is **at risk** unless the bug backlog is addressed this week. +The project is running approximately **7-8 days behind** the original schedule as of Day 42 (2026-03-22). Bug count remains at 26 (same as Day 37 peak, after briefly dropping to 10 on Day 39 before new bugs were discovered). **All 26 bugs now have TDD counterparts** (13 newly created on Day 42: #1091-#1103). **All 26 bugs are now assigned** (20 were unassigned before Day 42). **29 of 65 PRs (45%) have merge conflicts** — a persistent issue. **3 stalled TDD pipelines** (#821, #783, #932 — TDD tests exist but bugfix branches not started). M3 v3.2.0 has 63 open issues — the largest open backlog for any active milestone. The March 28 M7 deadline is **at HIGH risk**. -**Day 34 status**: (a) PM escalation posted on PR #670 — EOD deadline reinforced, reassignment recommended if Aditya doesn't respond; (b) PM ruling posted on PR #673 — accept scope bundling as-is, Hamza asked to convert REQUEST_CHANGES; (c) Bugs #797 and #783 verified (State/Unverified → State/Verified) with documented priority exception (kept at Low/Could Have); (d) TDD PRs #929 and #930 reviewed — missing MoSCoW and Points labels added; (e) Bug #620 regression flagged — Brent reported Day 33 that skill registration still fails despite PR #640 merge; (f) M3 ETA updated from ~Mar 12 to ~Mar 17 in milestone roadmap. +**Day 42 planning actions**: (a) 13 TDD counterpart issues created (#1091-#1103) for all bugs missing them. (b) All 20 unassigned bugs assigned to developers. (c) All 8 unassigned TDD issues assigned. (d) 3 untriaged issues (#1087-#1089) given milestones and labels. (e) #1060 closed as duplicate of #1076. (f) All 65 PRs reviewed — 24 reviewer assignments made. (g) 27 comment responses posted on active discussions. (h) Bug #993 reassigned from CoreRasurae to freemo to rebalance load. (i) Points estimates added to #1076 and #1080. **Critical path blockers** (ranked): -1. **PR #670** — TDD for bug #647 (Aditya). 2 trivial fixes. EOD Day 34 deadline. If missed → reassign. -2. **PR #673** — Robot TDD handler (Rui). Blocks 5 Critical TDD pipelines. PM ruling: merge as-is. -3. **Bug #620** — Skill registration regression. @freemo needs to investigate. -4. **Rebase debt** — ~15 PRs with merge conflicts constraining merge pipeline. +1. **PR #1053** — TDD for bug #647 (Aditya). Mergeable. REQUEST_CHANGES from hamza.khyari unresolved. Blocks bug #647 fix. +2. **29 conflicted PRs** — 45% of open PRs. Blocks merge velocity. All authors notified. +3. **Stalled bugfixes** — #821 (CoreRasurae), #783 (Aditya), #932 (hurui200320). TDD tests exist on master. Bugfix branches not started. +4. **M3 v3.2.0 backlog** — 63 open issues is excessive for a feature-complete milestone. Many are testing/cleanup tasks that should be expedited or reassessed. +5. **CoreRasurae overload** — Luis has 43 open issues total (heaviest load). Bug load rebalanced but feature load remains high. **Spec changes impact assessment (Day 31)**: ACP→A2A rename affects 10 source files, 13 classes, 640+ test references across 22 files. Zero A2A code exists — migration not started. All open PRs that touch ACP modules will need additional rebase work after #688/#689 merge. TUI spec adds ~1,500 lines with 18 ASCII mockups defining Textual-based UI — PR #667 was a placeholder that predates this spec. Server architecture adopts JSON-RPC 2.0 standard — PR #676 used custom protocol, now obsolete. @@ -4541,3 +4542,77 @@ Milestone per developer as of Day 32 (2026-03-12). Note: Milestone stats unchang **Stalled TDD pipelines**: None currently stalled — all TDD issues have been freshly assigned. Risk is that Brent has 4 TDD issues (#1030, #1032, #1033, #1034) — he should focus exclusively on these before any feature work. +### 2026-03-22 (Day 42 since kickoff on 2026-02-09) +- Timeline reference: Day 7/M1 = 2026-02-15, Day 14/M2 = 2026-02-22, Day 18/M3 = 2026-02-26, Day 22/M4 = 2026-03-02, Day 26/M5 = 2026-03-06, Day 30/M6 = 2026-03-10, Day 48/M7 = 2026-03-28 +- Summary (Team | Status | Risk | Notes): Team is **7-8 days behind** the original schedule — **slippage has increased since Day 39**. The project has **257 open issues** and **65 open PRs** across 9 milestones. **Bug count has risen back to 26 open bugs** (up from 10 on Day 39). **13 bugs lack TDD counterparts**, including 3 new Critical/Must Have bugs (#1078, #1079, #1080) with no milestone or assignee. **20 of 26 bugs are unassigned**. **58 of 257 open issues (23%) are unassigned**. **9 issues have no milestone**. **29 of 65 PRs (45%) have merge conflicts**. **3 stalled TDD pipelines** (#821, #783, #932 — TDD closed but bugfix not started). Days 39-42 saw strong merge velocity: bugs #967-969 fixed (Brent), #822/#823 fixed (Jeff), plan correct/explain/execute fixed, A2A facade operational, estimation actor merged, TUI persona system merged, overlay sandbox merged, scaling tests merged, CI pipeline finalized. However, **the bug backlog re-expanded** with newly discovered bugs (#1076, #1078-#1080) from specification alignment review. **Critical action needed**: assign all 20 unassigned bugs, create 13 missing TDD counterparts, triage 9 milestone-less issues. + +- Milestone forecast (Target -> ETA | Delta | Risk): + - M1 (2026-02-15) -> Done | 0d | COMPLETE + - M2 (2026-02-22) -> Done | 0d | COMPLETE + - M3 v3.2.0 (2026-02-26) -> ETA 2026-03-28 | +30d | **CRITICAL** — 63 open / 194 total (68%). Bugs #647, #620/#980, #783, #797 still open. 17 PRs targeting v3.2.0. TDD PR #1053 (Aditya) for bug #647 mergeable but not merged. + - M4 v3.3.0 (2026-03-02) -> ETA 2026-03-29 | +27d | **HIGH** — 33 open / 95 total (65%). Bugs #932, #986, #990, #1023-#1025 open. 7 PRs targeting v3.3.0. 11 unassigned issues. + - M5 v3.4.0 (2026-03-06) -> ETA 2026-03-30 | +24d | **HIGH** — 42 open / 112 total (62%). Bugs #821, #1022, #1028 open. 6 PRs targeting v3.4.0. 4 unassigned issues. + - M6 v3.5.0 (2026-03-10) -> ETA 2026-04-01 | +22d | **HIGH** — 53 open / 143 total (63%). Bugs #987-#989 open. 9 PRs targeting v3.5.0. 3 unassigned issues. + - M7 v3.6.0 (2026-03-28) -> ETA 2026-04-11 | +14d | **MEDIUM** — 66 open / 120 total (45%). Bugs #991-#993 open. 18 PRs targeting v3.6.0. 6 unassigned issues. + - M8 v3.7.0 (no deadline) -> No ETA | N/A | LOW — 30 open / 36 total (17%). TUI features, no active blockers. + - M9 v3.8.0 (no deadline) -> No ETA | N/A | LOW — 25 open / 30 total (17%). Server features, no active blockers. + +- Track forecast (Track | Status | ETA | Risk | Blocking): + - Track A (Plan Lifecycle) | Complete | Done | LOW | Config service (#352) 0% — deferred, non-blocking + - Track B (Projects & Resources) | Complete | Done | LOW | None + - Track C (Actors, Skills, Tools) | Complete | Done | LOW | None + - Track D (Decisions & Apply) | 90% | Mar 28 | MEDIUM | Decision domain #170, decision recording #172, plan explain #174 still open in M3 + - Track E (Subplans) | Complete | Done | LOW | None + - Track F (ACMS & Context) | 80% | Mar 30 | MEDIUM | Bug #1028 (ACMS pipeline wiring), #1022 (InvariantService), 8 ACMS features open in M5 + - Track Q (Quality & CI) | Ongoing | N/A | LOW | CI pipeline definitions merged (#983) + - Track T (Testing) | Active | Ongoing | **HIGH** | 10 open TDD issues (all unassigned), 3 stalled TDD pipelines, 13 bugs need TDD counterparts + +- Developer forecast (Name | Days Ahead/Behind | Availability | Risk | Focus): + - Jeff | -3d behind (62 open issues, heaviest workload) | available | **HIGH** | Must prioritize bug fixes. 13 open issues in v3.2.0, 3 in v3.3.0, 7 in v3.4.0. A2A facade functional but needs stabilization. + - Luis | -2d behind (43 open issues) | available | MEDIUM | 17 open issues in v3.5.0 (heaviest M5 load). Bugs #987-#989 in M5 unassigned — should be assigned to Luis. + - Aditya | -1d behind (22 open issues) | available | MEDIUM | TDD PR #1053 for bug #647 mergeable — needs to push for merge. 7 ACMS context features in M5. + - Hamza | on schedule (16 open issues, lightest load) | available | LOW | 12 open issues in v3.6.0 (resource types). Should take on bug assignments. + - Brent | -2d behind (19 open issues) | available | MEDIUM | 6 v3.2.0 issues (TDD and testing). PR author on 16 of 65 open PRs — merge velocity is critical. + - Rui | -1d behind (37 open issues, 2nd heaviest load) | available | MEDIUM | 13 v3.2.0 issues, 11 v3.4.0 issues, 5 v3.3.0 issues. Heavy on CLI alignment tasks. + +- Task inventory (Milestone x Developer — open issues only): + | Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total Open | + |-----------|------|--------|------|-------|-------|-----|------------|------------| + | v3.2.0 | 13 | 4 | 7 | 0 | 6 | 13 | 3 | 63 | + | v3.3.0 | 3 | 0 | 3 | 3 | 1 | 5 | 11 | 26 | + | v3.4.0 | 7 | 7 | 6 | 0 | 1 | 11 | 4 | 36 | + | v3.5.0 | 7 | 6 | 17 | 1 | 6 | 4 | 3 | 44 | + | v3.6.0 | 14 | 4 | 10 | 12 | 1 | 1 | 6 | 48 | + | v3.7.0 | 6 | 1 | 0 | 0 | 3 | 2 | 13 | 25 | + | v3.8.0 | 12 | 0 | 0 | 0 | 1 | 1 | 9 | 23 | + | No milestone | 0 | 0 | 0 | 0 | 0 | 0 | 9 | 9 | + | **Total** | **62** | **22** | **43** | **16** | **19** | **37** | **58** | **257** | + +- Open bugs: **26 open bug issues** (up from 10 on Day 39 — re-expansion due to newly discovered specification alignment bugs). **13 bugs have TDD counterparts** (7 open TDD, 3 stalled TDD). **13 bugs lack TDD counterparts** (must be created). **20 bugs are unassigned**. **6 bugs have no milestone**. **3 stalled TDD pipelines** (#840→#821, #842→#783, #950→#932). Details: + - #620 (v3.2.0, freemo): Skill registration broken. **No TDD counterpart. Needs creation.** + - #647 (v3.2.0, hurui200320): Container.resolve crash. TDD #648 (aditya) OPEN. PR #1053 mergeable. + - #783 (v3.2.0, aditya): init --yes input. TDD #842 CLOSED. **STALLED — no bugfix branch.** + - #797 (v3.2.0, hurui200320): actor list DB update. TDD #841 (aditya) OPEN. Low priority. + - #821 (v3.4.0, CoreRasurae): ACMS tier runtime. TDD #840 CLOSED. **STALLED — no bugfix branch.** + - #932 (v3.3.0, hurui200320): plan apply --yes. TDD #950 CLOSED. **STALLED — no bugfix branch.** + - #980 (v3.2.0, UNASSIGNED): Skill add regression. TDD #981 OPEN (UNASSIGNED). **Needs assignment.** + - #986 (v3.3.0, UNASSIGNED): CorrectionService DI. TDD #1030 OPEN (UNASSIGNED). **Needs assignment.** + - #987 (v3.5.0, UNASSIGNED): AutomationProfile session leak. **No TDD. Needs creation + assignment.** + - #988 (v3.5.0, UNASSIGNED): EventBus swallows exceptions. **No TDD. Needs creation + assignment.** + - #989 (v3.5.0, UNASSIGNED): JSON decode crash. **No TDD. Needs creation + assignment.** + - #990 (v3.3.0, UNASSIGNED): automation_profile DI bypass. TDD #1031 OPEN (UNASSIGNED). **Needs assignment.** + - #991 (v3.6.0, UNASSIGNED): AuditService TOCTOU race. **No TDD. Needs creation + assignment.** + - #992 (v3.6.0, UNASSIGNED): DI container audit cache. **No TDD. Needs creation + assignment.** + - #993 (v3.6.0, UNASSIGNED): server_connect non-atomic. **No TDD. Needs creation + assignment.** + - #1022 (v3.4.0, UNASSIGNED): InvariantService in-memory. TDD #1032 OPEN (UNASSIGNED). **Needs assignment.** + - #1023 (v3.3.0, UNASSIGNED): E2E init requirement. TDD #1033 OPEN (UNASSIGNED). **Needs assignment.** + - #1024 (v3.3.0, UNASSIGNED): SQLite DB URL. TDD #1034 OPEN (UNASSIGNED). **Needs assignment.** + - #1025 (v3.3.0, UNASSIGNED): plan correct auto-resolve. TDD #1035 OPEN (UNASSIGNED). **Needs assignment.** + - #1028 (v3.4.0, UNASSIGNED): ACMS pipeline wiring. TDD #1029 OPEN (UNASSIGNED). **Needs assignment.** + - #1038 (NO MS, UNASSIGNED): validation --required flag. **No TDD. Low priority.** + - #1039 (NO MS, UNASSIGNED): Missing validation YAML. **No TDD. Low priority.** + - #1076 (NO MS, UNASSIGNED): use_action automation_profile. **No TDD. Needs milestone + assignment.** + - #1078 (NO MS, UNASSIGNED): container-instance --mount. **No TDD. Critical. Needs milestone + assignment.** + - #1079 (NO MS, UNASSIGNED): context set --execution-env-priority. **No TDD. Critical. Needs milestone + assignment.** + - #1080 (NO MS, UNASSIGNED): execution env resolution. **No TDD. Critical. Needs milestone + assignment.** +