cleveragents-core/docs/timeline.md
T
freemo 83f2f3a0a1
CI / lint (push) Successful in 15s
CI / build (push) Successful in 17s
CI / quality (push) Successful in 19s
CI / security (push) Successful in 35s
CI / typecheck (push) Successful in 55s
CI / benchmark-regression (push) Has been skipped
CI / unit_tests (push) Successful in 2m31s
CI / docker (push) Successful in 10s
CI / integration_tests (push) Successful in 3m9s
CI / coverage (push) Successful in 4m52s
CI / benchmark-publish (push) Successful in 17m27s
Docs: Daily update to timeline
2026-03-09 17:01:41 -04:00

224 KiB

Implementation Timeline

Gantt Charts

Epic-Level Schedule

The following chart shows all 29 epics across 9 legendary workstreams, 7 milestone gates with dependency arrows, cross-workstream connections, developer resource allocation, and a risk register. Milestones are linked to their gating epics via arrows showing what work must complete before each release.

@startgantt

title CleverAgents Core — Epic-Level Project Schedule
footer Generated 2026-03-09 | 29 Epics | 9 Legendaries | 7 Milestones | 6 Developers | ~1550 SP

Project starts 2026-02-03
saturday are closed
sunday are closed
printscale weekly zoom 2

today is 2026-03-09
today is colored in #FF6666

<style>
ganttDiagram {
  task {
    FontName Arial
    FontSize 10
  }
  milestone {
    FontColor Navy
    FontSize 11
    FontStyle bold
    BackGroundColor Gold
    LineColor DarkGoldenRod
  }
  separator {
    FontSize 12
    FontStyle bold
    BackgroundColor LightSteelBlue
    FontColor MidnightBlue
    Margin 4
    Padding 6
  }
  arrow {
    LineColor #888888
    LineThickness 1.5
  }
  closed {
    BackgroundColor #F5F5F5
  }
}
</style>

' ================================================================
'  PRE-REBASELINE FOUNDATION (Legendary #370) — Target: v3.0.0
'  Scope: Bug fixes, tests, docs, security from pre-rebaseline era
'  Owner: Aditya (primary), Brent (docs)
'  Story Points: 26 (all complete except PRE_TEST)
' ================================================================
-- Pre-Rebaseline Foundation (Legendary #370) | v3.0.0 --

[Core Functionality (#26)] as [PRE_CORE] on {Aditya} requires 5 days
[PRE_CORE] starts 2026-02-03
[PRE_CORE] is 100% completed
[PRE_CORE] is colored in PaleGreen/SeaGreen

[Testing Framework (#24)] as [PRE_TEST] on {Aditya} requires 4 days
[PRE_TEST] starts 2026-02-03
[PRE_TEST] is 0% completed
[PRE_TEST] is colored in #E8E8E8/Silver

[Documentation (#27)] as [PRE_DOC] on {Brent} requires 4 days
[PRE_DOC] starts 2026-02-03
[PRE_DOC] is 100% completed
[PRE_DOC] is colored in PaleGreen/SeaGreen

[Bug Fixes (#25)] as [PRE_BUG] on {Aditya} requires 3 days
[PRE_BUG] starts 2026-02-03
[PRE_BUG] is 100% completed
[PRE_BUG] is colored in PaleGreen/SeaGreen

[Security Enhancements (#28)] as [PRE_SEC] on {Aditya} requires 2 days
[PRE_SEC] starts 2026-02-03
[PRE_SEC] is 100% completed
[PRE_SEC] is colored in PaleGreen/SeaGreen

' ================================================================
'  FOUNDATION & INFRASTRUCTURE (Legendary #371 - DONE) — v3.0.0
'  Scope: Architecture, preserved LangChain work, QA pipeline, traceability
'  Owner: Jeff (architecture), Brent (QA), Aditya (traceability)
'  Story Points: 32 (all complete)
' ================================================================
-- Foundation & Infrastructure (Legendary #371 - DONE) | v3.0.0 --

[Foundation Phases 0-1 (#346)] as [FOUND] on {Jeff} requires 1 days
[FOUND] starts 2026-02-09
[FOUND] is 100% completed
[FOUND] is colored in PaleGreen/SeaGreen

[Preserved Work (#347)] as [PRES] on {Jeff} requires 2 days
[PRES] starts 2026-02-09
[PRES] is 100% completed
[PRES] is colored in PaleGreen/SeaGreen

[Quality Automation Q0 (#349)] as [QA] on {Brent} requires 2 days
[QA] starts 2026-02-09
[QA] is 100% completed
[QA] is colored in PaleGreen/SeaGreen

[Commit Traceability (#348)] as [TRACE] on {Aditya} requires 2 days
[TRACE] starts at [FOUND]'s end
[TRACE] is 100% completed
[TRACE] is colored in PaleGreen/SeaGreen

' ── v3.0.0 MILESTONE ─────────────────────────────────────────
'  Gate: All pre-rebaseline + foundation work
'  Deliverables: Domain models, QA pipeline (97% coverage), architecture
-- v3.0.0 — Foundation Release (Feb 15) --

[v3.0.0 Release] as [MS1] happens 2026-02-15

' ================================================================
'  PLAN LIFECYCLE — WORKSTREAM A (Legendary #372) — v3.1.0-v3.4.0
'  Scope: Plan/Action/Session models, persistence, CLI, config service
'  Owner: Jeff (lead), Luis (persistence), Brent (testing), Aditya (docs)
'  Story Points: 95
'  Critical Path: QA → A1A5 → A6A8 → ... → A9
' ================================================================
-- Plan Lifecycle — Workstream A (Legendary #372) | v3.1.0 - v3.4.0 --

[Plan A1-A5: Models + Persistence (#350)] as [A1A5] on {Jeff} {Luis} {Brent} {Aditya} requires 5 days
[A1A5] starts at [QA]'s end
[A1A5] is 100% completed
[A1A5] is colored in PaleGreen/SeaGreen

[Plan A6-A8: Sessions + Config CLI (#351)] as [A6A8] on {Jeff} {Brent} {Luis} requires 3 days
[A6A8] starts at [A1A5]'s end
[A6A8] is 100% completed
[A6A8] is colored in PaleGreen/SeaGreen

[Execution Pipeline + Events (#361)] as [PIPE] on {Jeff} requires 2 days
[PIPE] starts 2026-02-18
[PIPE] is 100% completed
[PIPE] is colored in PaleGreen/SeaGreen

[Config Service A9 (#352)] as [A9] on {Jeff} {Luis} requires 2 days
[A9] starts 2026-03-06
[A9] is 0% completed
[A9] is colored in #E8E8E8/Silver

[Additional CLI Commands (#364)] as [CLI] on {Jeff} {Brent} requires 2 days
[CLI] starts 2026-02-23
[CLI] is 100% completed
[CLI] is colored in PaleGreen/SeaGreen

[Concurrency + Cleanup (#365)] as [CONCUR] on {Luis} requires 2 days
[CONCUR] starts 2026-02-23
[CONCUR] is 100% completed
[CONCUR] is colored in PaleGreen/SeaGreen

' ================================================================
'  PROJECTS & RESOURCES — WORKSTREAM B (Legendary #373 - DONE) — v3.1.0
'  Scope: Resource registry, project model, sandbox, context policy
'  Owner: Jeff (lead), Hamza (sandbox), Brent (testing)
'  Story Points: 42 (all complete)
' ================================================================
-- Projects & Resources — Workstream B (Legendary #373 - DONE) | v3.1.0 --

[Projects + Resources B0-B2 (#353)] as [PROJ] on {Jeff} {Hamza} {Brent} requires 5 days
[PROJ] starts at [QA]'s end
[PROJ] is 100% completed
[PROJ] is colored in PaleGreen/SeaGreen

' ── v3.1.0 MILESTONE ─────────────────────────────────────────
'  Gate: Plan lifecycle models + Project resources + Actor schema + Exec pipeline
'  Deliverables: Plan CRUD, resource registry, actor/skill/tool models
-- v3.1.0 — Models + Schema Release (Feb 22) --

[v3.1.0 Release] as [MS2] happens 2026-02-22

' ================================================================
'  ACTORS, SKILLS & TOOLS — WORKSTREAM C (Legendary #374) — v3.1.0-v3.3.0
'  Scope: Actor YAML, skill resolver, tool runtime, MCP adapter, tool sources
'  Owner: Jeff (lead), Aditya (schema/docs), Luis (persistence), Brent (QA)
'  Story Points: 158
'  COMPLETED: C0 100%, M1 100%, M2 100% — all actor/skill/tool work done
' ================================================================
-- Actors, Skills & Tools — Workstream C (Legendary #374) | v3.1.0 - v3.3.0 --

[Actor + Skill Schema C0 (#354)] as [C0] on {Jeff} {Aditya} {Luis} {Brent} requires 7 days
[C0] starts 2026-02-11
[C0] is 100% completed
[C0] is colored in PaleGreen/SeaGreen

[Actor Runtime + Tool Exec (#355)] as [M1] on {Jeff} {Hamza} {Luis} {Brent} requires 3 days
[M1] starts at [PROJ]'s end
[M1] is 100% completed
[M1] is colored in PaleGreen/SeaGreen

[Actor Graphs + Tool Sources (#356)] as [M2] on {Aditya} {Jeff} {Luis} {Brent} {Hamza} requires 5 days
[M2] starts at [M1]'s end
[M2] is 100% completed
[M2] is colored in PaleGreen/SeaGreen

' ── v3.2.0 MILESTONE ─────────────────────────────────────────
'  Gate: Sessions + Actor runtime + Tool execution operational
'  Deliverables: Session management, actor tool-calling runtime, sandbox apply
-- v3.2.0 — Runtime + Sessions (Feb 26) --

[v3.2.0 Release] as [MS3] happens 2026-02-26

' ================================================================
'  EXECUTION PIPELINE & DECISIONS (Legendary #375) — v3.2.0-v3.4.0
'  Scope: Decision model, validation pipeline, invariants, DoD gating
'  Owner: Jeff (invariants), Luis (validation), Hamza (decisions), Brent (QA)
'  Story Points: 64
' ================================================================
-- Execution Pipeline & Decisions (Legendary #375) | v3.2.0 - v3.4.0 --

[Decisions + Validations M3 (#357)] as [M3] on {Luis} {Hamza} {Brent} {Jeff} requires 4 days
[M3] starts at [M2]'s end
[M3] is 87% completed
[M3] is colored in LightSkyBlue/SteelBlue

' ── v3.3.0 MILESTONE ─────────────────────────────────────────
'  Gate: Tool source chain complete + Security hardening + Provider stability
'  Deliverables: Actor graphs, MCP adapter, security fixes, provider controls
-- v3.3.0 — Tool Sources + Security (Mar 02) --

[v3.3.0 Release] as [MS4] happens 2026-03-02

' ================================================================
'  HARDENING, TESTING & SECURITY (Legendary #376) — v3.3.0-v3.5.0
'  Scope: Corrections, subplans, checkpoints, security fixes, provider fixes
'  Owner: Luis (security/corrections), Jeff (phase reversion), Hamza (sandbox)
'  Story Points: 58
'  RISK: SEC at 80% — safety profiles remaining
' ================================================================
-- Hardening, Testing & Security (Legendary #376) | v3.3.0 - v3.5.0 --

[Corrections + Checkpoints M4 (#358)] as [M4] on {Luis} {Jeff} {Brent} {Hamza} requires 3 days
[M4] starts at [M3]'s end
[M4] is 95% completed
[M4] is colored in LightSkyBlue/SteelBlue

[Security + Safety Hardening (#362)] as [SEC] on {Luis} requires 3 days
[SEC] starts 2026-03-02
[SEC] is 80% completed
[SEC] is colored in LightSkyBlue/SteelBlue

[Provider Fixes + Runtime (#363)] as [PROV] on {Luis} requires 2 days
[PROV] starts 2026-02-12
[PROV] is 100% completed
[PROV] is colored in PaleGreen/SeaGreen

' ── v3.4.0 MILESTONE ─────────────────────────────────────────
'  Gate: Decisions + Validations + CLI polish + Concurrency
'  Deliverables: Decision tree, validation pipeline, invariants, CLI extensions
-- v3.4.0 — Decisions + Validation (Mar 06) --

[v3.4.0 Release] as [MS5] happens 2026-03-06

' ================================================================
'  DAY 14 REBASELINE MILESTONES (Legendary #377) — v3.4.0-v3.5.0
'  Scope: ACMS v1, context scaling, autonomy hardening, server stubs
'  Owner: Hamza (ACMS/context), Jeff (services/CLI), Luis (autonomy)
'  Story Points: 110
' ================================================================
-- Day 14 Rebaseline Milestones (Legendary #377) | v3.4.0 - v3.5.0 --

[ACMS v1 + Context Scaling M5 (#359)] as [M5] on {Hamza} {Jeff} {Aditya} {Brent} requires 4 days
[M5] starts at [M4]'s end
[M5] is 55% completed
[M5] is colored in LightSkyBlue/SteelBlue

[Autonomy Hardening + Stubs M6 (#360)] as [M6] on {Luis} {Jeff} {Hamza} {Brent} requires 5 days
[M6] starts at [M5]'s end
[M6] is 50% completed
[M6] is colored in LightSkyBlue/SteelBlue

[Subplans + Parallelism (#368)] as [SUBP] on {Luis} {Brent} requires 2 days
[SUBP] starts 2026-02-23
[SUBP] is 100% completed
[SUBP] is colored in PaleGreen/SeaGreen

[Large Project Autonomy (#369)] as [LARGE] on {Luis} {Brent} {Jeff} requires 4 days
[LARGE] starts 2026-03-17
[LARGE] is 60% completed
[LARGE] is colored in LightSkyBlue/SteelBlue

' ── v3.5.0 MILESTONE ─────────────────────────────────────────
'  Gate: Corrections + Checkpoints + ACMS v1 + Context tiers
'  Deliverables: Phase reversion, checkpoint/rollback, context pipeline, autonomy guardrails
-- v3.5.0 — Corrections + Context (Mar 10) --

[v3.5.0 Release] as [MS6] happens 2026-03-10

' ================================================================
'  POST-MVP DEFERRED WORK (Legendary #378) — v3.6.0
'  Scope: Virtual resources, remote clients, safety profiles, RDF, REPL
'  Owner: Luis (clients/security), Hamza (resources), Rui (REPL), Jeff (UI)
'  Story Points: 100
' ================================================================
-- Post-MVP Deferred Work (Legendary #378) | v3.6.0 --

[Post-MVP Deferred Work (#366)] as [POST] on {Luis} {Hamza} {Jeff} {Rui} {Brent} requires 8 days
[POST] starts at [M6]'s end
[POST] is 0% completed
[POST] is colored in #E8E8E8/Silver

[Multi-Agent RDF System (#367)] as [RDF] on {Aditya} requires 5 days
[RDF] starts 2026-03-24
[RDF] is 0% completed
[RDF] is colored in #E8E8E8/Silver

' ── v3.6.0 MILESTONE ─────────────────────────────────────────
'  Gate: All post-MVP deferred work
'  Deliverables: Remote clients, safety enforcement, virtual resources, RDF, TUI
-- v3.6.0 — Post-MVP Release (Mar 27) --

[v3.6.0 Release] as [MS7] happens 2026-03-27
' ================================================================
'  DEPENDENCY ARROWS
'  Simplified: milestone gates + critical path + key cross-links
'  21 arrows (reduced from 42 for readability)
' ================================================================

' Milestone gates: one key deliverable per release
[QA] -> [MS1]
[A1A5] -> [MS2]
[PROJ] -> [MS2]
[M1] -> [MS3]
[M2] -> [MS4]
[M3] -> [MS5]
[M4] -> [MS6]
[POST] -> [MS7]
[LARGE] -> [MS7]

' Critical path + cross-workstream dependencies
[FOUND] -> [TRACE]
[QA] -> [A1A5]
[QA] -> [PROJ]
[A1A5] -> [PIPE]
[PROJ] -> [M1]
[M1] -> [M2]
[M2] -> [M3]
[M3] -> [M4]
[M4] -> [M5]
[M5] -> [M6]
[M6] -> [POST]
[A6A8] -> [CLI]

' ================================================================
'  DEVELOPER ALLOCATION LEGEND
' ================================================================

legend right
  **CleverAgents Core — Epic-Level Schedule**
  ----
  **Critical Path (longest dependency chain):**
  QA -> A1A5 -> PIPE -> M1 -> M2 -> M3 -> M4 -> M5 -> M6 -> POST
  ----
  |= Developer |= Role |= Total Pts |= Est. Hours |
  | Jeff (freemo) | CTO / Lead Architect | 480 | ~960h |
  | Luis (CoreRasurae) | Sr. Python Architect | 338 | ~676h |
  | Aditya | Domain Expert (Agents) | 183 | ~366h |
  | Hamza (hamza.khyari) | Infrastructure / RDF | 171 | ~342h |
  | Brent (brent.edwards) | Quality / QA | 170 | ~340h |
  | Rui (hurui200320) | Testing | 8 | ~16h |
  ----
  **Per-Milestone Allocation (done / total story points)**
  |= Dev |= v3.0.0 |= v3.1.0 |= v3.2.0 |= v3.3.0 |= v3.4.0 |= v3.5.0 |= v3.6.0 |
  | Jeff | 188/188 | 176/176 | 58/58 | 47/47 | 5/61 | 13/92 | 0/64 |
  | Luis | 16/16 | 29/29 | 21/21 | 29/34 | - | 0/39 | 0/24 |
  | Aditya | 128/128 | 86/86 | - | - | 0/8 | - | - |
  | Hamza | 19/19 | 5/5 | 13/23 | 32/32 | 0/37 | - | 0/29 |
  | Brent | 71/71 | 21/21 | 11/11 | 24/24 | 8/14 | 25/30 | 0/5 |
  | Rui | - | - | - | - | - | - | - |
  ----
  **Milestone Scope**
  |= Milestone |= Target |= Epics |= SP |= Key Deliverables |
  | v3.0.0 | Feb 15 | 9 | 172 | Minimal local source-code workflow |
  | v3.1.0 | Feb 22 | 4 | 208 | Actor graphs + tool sources |
  | v3.2.0 | Feb 26 | 2 | 104 | Decisions + validations + invariants |
  | v3.3.0 | Mar 02 | 3 | 126 | Corrections + subplans + checkpoints |
  | v3.4.0 | Mar 06 | 3 | 129 | ACMS v1 + context scaling |
  | v3.5.0 | Mar 10 | 2 | 151 | Autonomy hardening + server stubs |
  | v3.6.0 | Mar 27 | 2 | 100 | Deferred work |
  ----
  **Risk Register**
  |= Epic |= Completion |= Risk |= Blocker |
  | M5 (#359) | 12% | High | ACMS pipeline + UKO + context strategies |
  | M6 (#360) | 32% | Medium | Autonomy hardening + server stubs |
  | M3 (#357) | 87% | Medium | Decision recording + plan explain (Hamza PRs) |
  | SEC (#362) | 80% | Low-Med | Safety profiles remaining |
  | A9 (#352) | 0% | Low | Config deferred to v3.4 |
  ----
  **Color Key**
  |= Color |= Meaning |
  | <back:PaleGreen>    </back> | Completed (100%) |
  | <back:LightSkyBlue>    </back> | In Progress |
  | <back:#E8E8E8>    </back> | Not Started |
  | <back:Gold>  <>  </back> | Milestone Target |
  | <back:#FF6666>  |  </back> | Today (2026-03-02) |
  ----
  29 Epics | 9 Legendaries | 7 Milestones | 6 Developers
  ~1649 total story points | ~3300 estimated hours
end legend

@endgantt

Detailed Issue-Level Schedule (213 Issues)

The following chart expands every epic into its individual issues, showing per-developer scheduling, completion status, and the full project timeline at the task level.

@startgantt

title CleverAgents Core - Detailed Project Gantt Chart

' NOTE: This chart contains ~250 tasks. Use a local PlantUML renderer
' (java -jar plantuml.jar docs/gantt-detailed.puml) for best results.
' Online renderers may truncate or time out.

Project starts 2026-02-03
saturday are closed
sunday are closed
printscale weekly zoom 2

today is 2026-03-09
today is colored in #FF6666

<style>
ganttDiagram {
  task {
    FontName Arial
    FontSize 9
  }
  milestone {
    FontColor Navy
    FontSize 11
    FontStyle bold
    BackGroundColor Gold
    LineColor DarkGoldenRod
  }
  separator {
    FontSize 11
    FontStyle bold
    BackgroundColor LightSteelBlue
    FontColor MidnightBlue
    Margin 3
    Padding 4
  }
  arrow {
    LineColor #888888
    LineThickness 1.5
  }
  closed {
    BackgroundColor #F5F5F5
  }
}
</style>

' ================================================================
'  LEGENDARY #370: Pre-Rebaseline Foundation
' ================================================================
-- Pre-Rebaseline Foundation (#370) --

' --- Comprehensive Testing Framework (#24) ---
[Comprehensive Testing Framework (#24)] as [PRE_TEST] on {Aditya} requires 4 days
[PRE_TEST] starts 2026-02-03
[PRE_TEST] is 0% completed
[PRE_TEST] is colored in DarkSeaGreen/ForestGreen

[Create Unit Test Suite for Core Bug Fixes (#13)] as [I13] on {Aditya} lasts 1 day
[I13] starts 2026-02-03
[I13] is 0% completed
[I13] is colored in #E8E8E8/Silver
[Create Integration Test Scripts for Example Wor... (#14)] as [I14] on {Aditya} lasts 1 day
[I14] starts 2026-02-04
[I14] is 0% completed
[I14] is colored in #E8E8E8/Silver
[Add comprehensive unit tests for core applicati... (#17)] as [I17] on {Aditya} lasts 1 day
[I17] starts 2026-02-05
[I17] is 0% completed
[I17] is colored in #E8E8E8/Silver

' --- Bug Fixes and Stability Improvements (#25) ---
[Bug Fixes and Stability Improvements (#25)] as [PRE_BUG] on {Aditya} requires 3 days
[PRE_BUG] starts 2026-02-03
[PRE_BUG] is 100% completed
[PRE_BUG] is colored in DarkSeaGreen/ForestGreen

[Graph Routing Based On User Input (#3)] as [I3] lasts 1 day
[I3] starts 2026-02-03
[I3] is 100% completed
[I3] is colored in PaleGreen/SeaGreen
[Fix duplicate output responses in interactive C... (#4)] as [I4] on {Aditya} lasts 1 day
[I4] starts 2026-02-03
[I4] is 100% completed
[I4] is colored in PaleGreen/SeaGreen

' --- Core Functionality Enhancements (#26) ---
[Core Functionality Enhancements (#26)] as [PRE_CORE] on {Aditya} requires 5 days
[PRE_CORE] starts 2026-02-03
[PRE_CORE] is 63% completed
[PRE_CORE] is colored in DarkSeaGreen/ForestGreen

[Conversation State Management (#1)] as [I1] lasts 1 day
[I1] starts 2026-02-03
[I1] is 100% completed
[I1] is colored in PaleGreen/SeaGreen
[Consistent Async Event Loop Management System (#2)] as [I2] lasts 1 day
[I2] starts 2026-02-04
[I2] is 100% completed
[I2] is colored in PaleGreen/SeaGreen
[Establish Unit Test Infrastructure and Add BDD ... (#15)] as [I15] lasts 1 day
[I15] starts 2026-02-05
[I15] is 100% completed
[I15] is colored in PaleGreen/SeaGreen
[Add comprehensive unit tests for reactive strea... (#18)] as [I18] on {Aditya} lasts 1 day
[I18] starts 2026-02-03
[I18] is 100% completed
[I18] is colored in PaleGreen/SeaGreen
[Add comprehensive unit tests for template engin... (#19)] as [I19] on {Aditya} lasts 1 day
[I19] starts 2026-02-04
[I19] is 100% completed
[I19] is colored in PaleGreen/SeaGreen
[Enhance routing logic robustness and reliabilit... (#20)] as [I20] on {Aditya} lasts 1 day
[I20] starts 2026-02-05
[I20] is 100% completed
[I20] is colored in PaleGreen/SeaGreen
[Resolve all static type checking errors and cod... (#23)] as [I23] on {Aditya} lasts 1 day
[I23] starts 2026-02-06
[I23] is 100% completed
[I23] is colored in PaleGreen/SeaGreen

' --- Documentation and User Guidance (#27) ---
[Documentation and User Guidance (#27)] as [PRE_DOC] on {Brent} requires 4 days
[PRE_DOC] starts 2026-02-03
[PRE_DOC] is 100% completed
[PRE_DOC] is colored in DarkSeaGreen/ForestGreen

[Security issues in CleverAgents... (#7)] as [I7] on {Brent} lasts 1 day
[I7] starts 2026-02-03
[I7] is 100% completed
[I7] is colored in PaleGreen/SeaGreen
[Add Comprehensive Documentation (README & YAML ... (#8)] as [I8] lasts 1 day
[I8] starts 2026-02-03
[I8] is 100% completed
[I8] is colored in PaleGreen/SeaGreen
[Create Example Configuration Files (Chat, Contr... (#9)] as [I9] lasts 1 day
[I9] starts 2026-02-04
[I9] is 100% completed
[I9] is colored in PaleGreen/SeaGreen
[Fix Critical Interactive Session Bugs (Duplicat... (#10)] as [I10] lasts 1 day
[I10] starts 2026-02-05
[I10] is 100% completed
[I10] is colored in PaleGreen/SeaGreen

' --- Security Enhancements (#28) ---
[Security Enhancements (#28)] as [PRE_SEC] on {Aditya} requires 2 days
[PRE_SEC] starts 2026-02-03
[PRE_SEC] is 100% completed
[PRE_SEC] is colored in DarkSeaGreen/ForestGreen

[Fix Nested JSON Parsing and Add Sanitization fo... (#11)] as [I11] on {Aditya} lasts 1 day
[I11] starts 2026-02-03
[I11] is 100% completed
[I11] is colored in PaleGreen/SeaGreen
[Enhance Tool Agent Error Logging and Debugging (#12)] as [I12] on {Aditya} lasts 1 day
[I12] starts 2026-02-04
[I12] is 100% completed
[I12] is colored in PaleGreen/SeaGreen

' ================================================================
'  LEGENDARY #371: Foundation & Infrastructure - DONE
' ================================================================
-- Foundation & Infrastructure - DONE (#371) --

' --- Foundation Phases 0-1 (#346) ---
[Foundation Phases 0-1 (#346)] as [FOUND] requires 1 days
[FOUND] starts 2026-02-09
[FOUND] is 100% completed
[FOUND] is colored in DarkSeaGreen/ForestGreen

[Phase 0: Discovery and Requirements Elaboration (#215)] as [I215] lasts 1 day
[I215] starts 2026-02-09
[I215] is 100% completed
[I215] is colored in PaleGreen/SeaGreen
[Phase 1: Architecture Definition (#216)] as [I216] lasts 1 day
[I216] starts 2026-02-10
[I216] is 100% completed
[I216] is colored in PaleGreen/SeaGreen

' --- Preserved Work (#347) ---
[Preserved Work (#347)] as [PRES] requires 2 days
[PRES] starts 2026-02-09
[PRES] is 100% completed
[PRES] is colored in DarkSeaGreen/ForestGreen

[LangChain/LangGraph Foundation (#217)] as [I217] lasts 1 day
[I217] starts 2026-02-09
[I217] is 100% completed
[I217] is colored in PaleGreen/SeaGreen
[Core LangGraph Workflows (#218)] as [I218] lasts 1 day
[I218] starts 2026-02-10
[I218] is 100% completed
[I218] is colored in PaleGreen/SeaGreen
[Provider Integration (#219)] as [I219] lasts 1 day
[I219] starts 2026-02-11
[I219] is 100% completed
[I219] is colored in PaleGreen/SeaGreen
[Actor System (Stage 7.5) (#220)] as [I220] lasts 1 day
[I220] starts 2026-02-12
[I220] is 100% completed
[I220] is colored in PaleGreen/SeaGreen

' --- Commit Traceability Fixups (#348) ---
[Commit Traceability Fixups (#348)] as [TRACE] requires 2 days
[TRACE] starts at [FOUND]'s end
[TRACE] is 100% completed
[TRACE] is colored in DarkSeaGreen/ForestGreen

[Traceability (Aditya): Found commit 'docs(skill... (#221)] as [I221] lasts 1 day
[I221] starts 2026-02-10
[I221] is 100% completed
[I221] is colored in PaleGreen/SeaGreen
[Traceability (Aditya): Found commit 'feat(cli):... (#222)] as [I222] lasts 1 day
[I222] starts 2026-02-11
[I222] is 100% completed
[I222] is colored in PaleGreen/SeaGreen
[Traceability (Aditya): Found commit 'docs(actor... (#223)] as [I223] lasts 1 day
[I223] starts 2026-02-12
[I223] is 100% completed
[I223] is colored in PaleGreen/SeaGreen
[Traceability (Aditya): Found commit 'Feat: Hard... (#224)] as [I224] lasts 1 day
[I224] starts 2026-02-13
[I224] is 100% completed
[I224] is colored in PaleGreen/SeaGreen
[Traceability (Aditya): Found commit 'feat(tool)... (#225)] as [I225] lasts 1 day
[I225] starts 2026-02-16
[I225] is 100% completed
[I225] is colored in PaleGreen/SeaGreen
[Traceability (Jeff): No matching commit in loca... (#226)] as [I226] lasts 1 day
[I226] starts 2026-02-17
[I226] is 100% completed
[I226] is colored in PaleGreen/SeaGreen
[Traceability (Jeff): No matching commit in loca... (#227)] as [I227] lasts 1 day
[I227] starts 2026-02-18
[I227] is 100% completed
[I227] is colored in PaleGreen/SeaGreen
[Traceability (Luis): No matching commit in loca... (#228)] as [I228] lasts 1 day
[I228] starts 2026-02-19
[I228] is 100% completed
[I228] is colored in PaleGreen/SeaGreen
[Traceability (Luis): Found commit 'feat(core): ... (#229)] as [I229] lasts 1 day
[I229] starts 2026-02-20
[I229] is 100% completed
[I229] is colored in PaleGreen/SeaGreen

' --- Quality Automation Setup (Q0) (#349) ---
[Quality Automation Setup (Q0) (#349)] as [QA] on {Brent} requires 2 days
[QA] starts 2026-02-09
[QA] is 100% completed
[QA] is colored in DarkSeaGreen/ForestGreen

[feat(qa): add pre-commit baseline hooks (#212)] as [I212] on {Brent} lasts 1 day
[I212] starts 2026-02-09
[I212] is 100% completed
[I212] is colored in PaleGreen/SeaGreen
[feat(ci): add nox-based PR validation workflow (#213)] as [I213] on {Brent} lasts 1 day
[I213] starts 2026-02-10
[I213] is 100% completed
[I213] is colored in PaleGreen/SeaGreen
[feat(qa): enforce coverage >=97% in CI (#214)] as [I214] on {Brent} lasts 1 day
[I214] starts 2026-02-11
[I214] is 100% completed
[I214] is colored in PaleGreen/SeaGreen

' ================================================================
'  LEGENDARY #372: Plan Lifecycle - Workstream A
' ================================================================
-- Plan Lifecycle - Workstream A (#372) --

' --- Plan Lifecycle A1-A5 (Models & Persistence) (#350) ---
[Plan Lifecycle A1-A5 (Models & Persistence) (#350)] as [A1A5] on {Aditya} {Brent} {Jeff} {Luis} requires 5 days
[A1A5] starts at [QA]'s end
[A1A5] is 100% completed
[A1A5] is colored in DarkSeaGreen/ForestGreen

[Stage A1: Plan Data Model (#230)] as [I230] lasts 1 day
[I230] starts 2026-02-11
[I230] is 100% completed
[I230] is colored in PaleGreen/SeaGreen
[Stage A2: Action Model (#231)] as [I231] lasts 1 day
[I231] starts 2026-02-12
[I231] is 100% completed
[I231] is colored in PaleGreen/SeaGreen
[Stage A3: Plan State Machine (#236)] as [I236] lasts 1 day
[I236] starts 2026-02-13
[I236] is 100% completed
[I236] is colored in PaleGreen/SeaGreen
[Stage A4: Plan CLI Commands (#237)] as [I237] lasts 1 day
[I237] starts 2026-02-16
[I237] is 100% completed
[I237] is colored in PaleGreen/SeaGreen
[Stage A6: Automation Levels Foundation (Luis) (#250)] as [I250] lasts 1 day
[I250] starts 2026-02-17
[I250] is 100% completed
[I250] is colored in PaleGreen/SeaGreen
[feat(domain): align action model with spec (#232)] as [I232] on {Jeff} lasts 1 day
[I232] starts 2026-02-11
[I232] is 100% completed
[I232] is colored in PaleGreen/SeaGreen
[feat(domain): rebaseline plan phases and apply ... (#235)] as [I235] on {Jeff} lasts 1 day
[I235] starts 2026-02-12
[I235] is 100% completed
[I235] is colored in PaleGreen/SeaGreen
[feat(cli): align action commands to spec (#238)] as [I238] on {Jeff} lasts 1 day
[I238] starts 2026-02-13
[I238] is 100% completed
[I238] is colored in PaleGreen/SeaGreen
[feat(cli): align plan use/list/status flags (#239)] as [I239] on {Jeff} lasts 1 day
[I239] starts 2026-02-16
[I239] is 100% completed
[I239] is colored in PaleGreen/SeaGreen
[feat(cli): stabilize action/plan output formats (#240)] as [I240] on {Jeff} lasts 1 day
[I240] starts 2026-02-17
[I240] is 100% completed
[I240] is colored in PaleGreen/SeaGreen
[feat(db): add spec-aligned action and plan tabl... (#242)] as [I242] on {Jeff} lasts 1 day
[I242] starts 2026-02-18
[I242] is 100% completed
[I242] is colored in PaleGreen/SeaGreen
[feat(db): rebaseline plan phase/state enums for... (#243)] as [I243] on {Jeff} lasts 1 day
[I243] starts 2026-02-19
[I243] is 100% completed
[I243] is colored in PaleGreen/SeaGreen
[feat(repo): add lifecycle plan repository (#244)] as [I244] on {Jeff} lasts 1 day
[I244] starts 2026-02-20
[I244] is 100% completed
[I244] is colored in PaleGreen/SeaGreen
[feat(uow): wire lifecycle repositories (#245)] as [I245] on {Jeff} lasts 1 day
[I245] starts 2026-02-23
[I245] is 100% completed
[I245] is colored in PaleGreen/SeaGreen
[feat(service): persist plan lifecycle via repos... (#246)] as [I246] on {Jeff} lasts 1 day
[I246] starts 2026-02-24
[I246] is 100% completed
[I246] is colored in PaleGreen/SeaGreen
[refactor(plan): remove legacy plan persistence (#247)] as [I247] on {Jeff} lasts 1 day
[I247] starts 2026-02-25
[I247] is 100% completed
[I247] is colored in PaleGreen/SeaGreen
[feat(domain): align plan model with spec (#233)] as [I233] on {Luis} lasts 1 day
[I233] starts 2026-02-11
[I233] is 100% completed
[I233] is colored in PaleGreen/SeaGreen
[docs(action): add action YAML schema and examples (#234)] as [I234] on {Aditya} lasts 1 day
[I234] starts 2026-02-11
[I234] is 100% completed
[I234] is colored in PaleGreen/SeaGreen
[test(cli): expand lifecycle command coverage (#241)] as [I241] on {Brent} lasts 1 day
[I241] starts 2026-02-11
[I241] is 100% completed
[I241] is colored in PaleGreen/SeaGreen
[test(persistence): add plan/action persistence ... (#248)] as [I248] on {Brent} lasts 1 day
[I248] starts 2026-02-12
[I248] is 100% completed
[I248] is colored in PaleGreen/SeaGreen
[test(persistence): add Robot persistence coverage (#249)] as [I249] on {Brent} lasts 1 day
[I249] starts 2026-02-13
[I249] is 100% completed
[I249] is colored in PaleGreen/SeaGreen

' --- Plan Lifecycle A6-A8 (Sessions & Config CLI) (#351) ---
[Plan Lifecycle A6-A8 (Sessions & Config CLI) (#351)] as [A6A8] on {Brent} {Jeff} {Luis} requires 3 days
[A6A8] starts at [A1A5]'s end
[A6A8] is 100% completed
[A6A8] is colored in DarkSeaGreen/ForestGreen

[feat(cli): add automation-profile commands (#251)] as [I251] on {Jeff} lasts 1 day
[I251] starts 2026-02-18
[I251] is 100% completed
[I251] is colored in PaleGreen/SeaGreen
[refactor(automation): remove automation_level l... (#252)] as [I252] on {Jeff} lasts 1 day
[I252] starts 2026-02-19
[I252] is 100% completed
[I252] is colored in PaleGreen/SeaGreen
[feat(session): add session domain models and co... (#253)] as [I253] on {Jeff} lasts 1 day
[I253] starts 2026-02-20
[I253] is 100% completed
[I253] is colored in PaleGreen/SeaGreen
[test(session): add robot session model smoke tests (#254)] as [I254] on {Brent} lasts 1 day
[I254] starts 2026-02-18
[I254] is 100% completed
[I254] is colored in PaleGreen/SeaGreen
[feat(cli): add session commands (#256)] as [I256] on {Brent} lasts 1 day
[I256] starts 2026-02-19
[I256] is 100% completed
[I256] is colored in PaleGreen/SeaGreen
[feat(cli): add config get/set/list commands (#257)] as [I257] on {Brent} lasts 1 day
[I257] starts 2026-02-20
[I257] is 100% completed
[I257] is colored in PaleGreen/SeaGreen
[feat(session): add session persistence and repo... (#255)] as [I255] on {Luis} lasts 1 day
[I255] starts 2026-02-18
[I255] is 100% completed
[I255] is colored in PaleGreen/SeaGreen

' --- Config Service A9 (Multi-Level Resolution) (#352) ---
[Config Service A9 (Multi-Level Resolution) (#352)] as [A9] on {Jeff} {Luis} requires 2 days
[A9] starts 2026-03-06
[A9] is 0% completed
[A9] is colored in #D0D0D0/DimGray

[feat(config): add config service with multi-lev... (#258)] as [I258] on {Jeff} lasts 1 day
[I258] starts 2026-03-06
[I258] is 0% completed
[I258] is colored in #E8E8E8/Silver
[feat(config): add project-scoped config overrides (#259)] as [I259] on {Luis} lasts 1 day
[I259] starts 2026-03-06
[I259] is 0% completed
[I259] is colored in #E8E8E8/Silver

' --- Additional CLI Commands & UX (#364) ---
[Additional CLI Commands & UX (#364)] as [CLI] on {Brent} {Jeff} requires 2 days
[CLI] starts 2026-02-23
[CLI] is 0% completed
[CLI] is colored in #D0D0D0/DimGray

[feat(cli): add action and plan CLI extensions (#325)] as [I325] on {Jeff} lasts 1 day
[I325] starts 2026-02-23
[I325] is 0% completed
[I325] is colored in #E8E8E8/Silver
[test(cli): cover action and plan extensions (#326)] as [I326] on {Brent} lasts 1 day
[I326] starts 2026-02-23
[I326] is 0% completed
[I326] is colored in #E8E8E8/Silver

' --- Concurrency & Cleanup (#365) ---
[Concurrency & Cleanup (#365)] as [CONCUR] on {Luis} requires 2 days
[CONCUR] starts 2026-02-23
[CONCUR] is 0% completed
[CONCUR] is colored in #D0D0D0/DimGray

[feat(concurrency): add plan and project locks (#327)] as [I327] on {Luis} lasts 1 day
[I327] starts 2026-02-23
[I327] is 0% completed
[I327] is colored in #E8E8E8/Silver
[feat(concurrency): add plan resume (#328)] as [I328] on {Luis} lasts 1 day
[I328] starts 2026-02-24
[I328] is 0% completed
[I328] is colored in #E8E8E8/Silver

' ================================================================
'  LEGENDARY #373: Projects & Resources - Workstream B - DONE
' ================================================================
-- Projects & Resources - Workstream B - DONE (#373) --

' --- Projects & Resources B0-B2 (#353) ---
[Projects & Resources B0-B2 (#353)] as [PROJ] on {Brent} {Hamza} {Jeff} requires 5 days
[PROJ] starts at [QA]'s end
[PROJ] is 100% completed
[PROJ] is colored in DarkSeaGreen/ForestGreen

[feat(domain): add spec-aligned Resource and Pro... (#260)] as [I260] on {Hamza} lasts 1 day
[I260] starts 2026-02-11
[I260] is 100% completed
[I260] is colored in PaleGreen/SeaGreen
[feat(sandbox): add git_worktree and copy_on_wri... (#271)] as [I271] on {Hamza} lasts 1 day
[I271] starts 2026-02-12
[I271] is 100% completed
[I271] is colored in PaleGreen/SeaGreen
[fix(sandbox): fix CI failures in git_worktree a... (#272)] as [I272] on {Hamza} lasts 1 day
[I272] starts 2026-02-13
[I272] is 100% completed
[I272] is colored in PaleGreen/SeaGreen
[feat(resource): add resource type model + schem... (#261)] as [I261] on {Jeff} lasts 1 day
[I261] starts 2026-02-11
[I261] is 100% completed
[I261] is colored in PaleGreen/SeaGreen
[feat(resource): add git-checkout and fs-directo... (#262)] as [I262] on {Jeff} lasts 1 day
[I262] starts 2026-02-12
[I262] is 100% completed
[I262] is colored in PaleGreen/SeaGreen
[feat(db): add projects and project links tables (#263)] as [I263] on {Jeff} lasts 1 day
[I263] starts 2026-02-13
[I263] is 100% completed
[I263] is colored in PaleGreen/SeaGreen
[feat(db): add resource registry tables (#264)] as [I264] on {Jeff} lasts 1 day
[I264] starts 2026-02-16
[I264] is 100% completed
[I264] is colored in PaleGreen/SeaGreen
[feat(repo): add resource repositories (#266)] as [I266] on {Jeff} lasts 1 day
[I266] starts 2026-02-17
[I266] is 100% completed
[I266] is colored in PaleGreen/SeaGreen
[feat(repo): add project repositories (#267)] as [I267] on {Jeff} lasts 1 day
[I267] starts 2026-02-18
[I267] is 100% completed
[I267] is colored in PaleGreen/SeaGreen
[feat(service): wire resource registry and proje... (#268)] as [I268] on {Jeff} lasts 1 day
[I268] starts 2026-02-19
[I268] is 100% completed
[I268] is colored in PaleGreen/SeaGreen
[feat(cli): add resource commands (core) (#269)] as [I269] on {Jeff} lasts 1 day
[I269] starts 2026-02-20
[I269] is 100% completed
[I269] is colored in PaleGreen/SeaGreen
[feat(cli): add project commands (core) (#270)] as [I270] on {Jeff} lasts 1 day
[I270] starts 2026-02-23
[I270] is 100% completed
[I270] is colored in PaleGreen/SeaGreen
[feat(cli): add resource tree and inspect commands (#273)] as [I273] on {Jeff} lasts 1 day
[I273] starts 2026-02-24
[I273] is 100% completed
[I273] is colored in PaleGreen/SeaGreen
[feat(project): add context policy model (#274)] as [I274] on {Jeff} lasts 1 day
[I274] starts 2026-02-25
[I274] is 100% completed
[I274] is colored in PaleGreen/SeaGreen
[test(db): add resource registry robot smoke test (#265)] as [I265] on {Brent} lasts 1 day
[I265] starts 2026-02-11
[I265] is 100% completed
[I265] is colored in PaleGreen/SeaGreen

' ================================================================
'  LEGENDARY #374: Actors, Skills & Tools - Workstream C
' ================================================================
-- Actors, Skills & Tools - Workstream C (#374) --

' --- Actor & Skill Schema + CLI (C0) (#354) ---
[Actor & Skill Schema + CLI (C0) (#354)] as [C0] on {Aditya} {Brent} {Jeff} {Luis} requires 7 days
[C0] starts 2026-02-11
[C0] is 100% completed
[C0] is colored in DarkSeaGreen/ForestGreen

[feat(tool): add tool runtime core (#275)] as [I275] on {Jeff} lasts 1 day
[I275] starts 2026-02-11
[I275] is 100% completed
[I275] is colored in PaleGreen/SeaGreen
[feat(tool): add built-in file tools (#276)] as [I276] on {Jeff} lasts 1 day
[I276] starts 2026-02-12
[I276] is 100% completed
[I276] is colored in PaleGreen/SeaGreen
[feat(tool): add tool and validation domain models (#277)] as [I277] on {Jeff} lasts 1 day
[I277] starts 2026-02-13
[I277] is 100% completed
[I277] is colored in PaleGreen/SeaGreen
[feat(cli): add tool and validation commands (#280)] as [I280] on {Jeff} lasts 1 day
[I280] starts 2026-02-16
[I280] is 100% completed
[I280] is colored in PaleGreen/SeaGreen
[feat(skill): add skill domain model and resolver (#282)] as [I282] on {Jeff} lasts 1 day
[I282] starts 2026-02-17
[I282] is 100% completed
[I282] is colored in PaleGreen/SeaGreen
[feat(actor): align actor registry persistence (#287)] as [I287] on {Jeff} lasts 1 day
[I287] starts 2026-02-18
[I287] is 100% completed
[I287] is colored in PaleGreen/SeaGreen
[feat(tool): add tool lifecycle runtime (#291)] as [I291] on {Jeff} lasts 1 day
[I291] starts 2026-02-19
[I291] is 100% completed
[I291] is colored in PaleGreen/SeaGreen
[feat(skill): add skill protocol and metadata (#295)] as [I295] on {Jeff} lasts 1 day
[I295] starts 2026-02-20
[I295] is 100% completed
[I295] is colored in PaleGreen/SeaGreen
[feat(skill): add skill context and registry (#296)] as [I296] on {Jeff} lasts 1 day
[I296] starts 2026-02-23
[I296] is 100% completed
[I296] is colored in PaleGreen/SeaGreen
[feat(skill): add inline tool executor (#297)] as [I297] on {Jeff} lasts 1 day
[I297] starts 2026-02-24
[I297] is 100% completed
[I297] is colored in PaleGreen/SeaGreen
[feat(skill): add file operation skills (#298)] as [I298] on {Jeff} lasts 1 day
[I298] starts 2026-02-25
[I298] is 100% completed
[I298] is colored in PaleGreen/SeaGreen
[feat(skill): add directory and search skills (#299)] as [I299] on {Jeff} lasts 1 day
[I299] starts 2026-02-26
[I299] is 100% completed
[I299] is colored in PaleGreen/SeaGreen
[feat(change): add tool router for providers (#302)] as [I302] on {Jeff} lasts 1 day
[I302] starts 2026-02-27
[I302] is 100% completed
[I302] is colored in PaleGreen/SeaGreen
[feat(cli): align actor commands to YAML (#288)] as [I288] on {Jeff} lasts 1 day
[I288] starts 2026-03-02
[I288] is 100% completed
[I288] is colored in PaleGreen/SeaGreen
[test(tool): add robot tool model smoke tests (#278)] as [I278] on {Brent} lasts 1 day
[I278] starts 2026-02-11
[I278] is 100% completed
[I278] is colored in PaleGreen/SeaGreen
[test(skill): add robot skill resolver smoke tests (#283)] as [I283] on {Brent} lasts 1 day
[I283] starts 2026-02-12
[I283] is 100% completed
[I283] is colored in PaleGreen/SeaGreen
[feat(tool): add tool registry persistence (#279)] as [I279] on {Luis} lasts 1 day
[I279] starts 2026-02-11
[I279] is 100% completed
[I279] is colored in PaleGreen/SeaGreen
[feat(skill): add skill registry persistence (#284)] as [I284] on {Luis} lasts 1 day
[I284] starts 2026-02-12
[I284] is 100% completed
[I284] is colored in PaleGreen/SeaGreen
[feat(skill): add git operation skills (#300)] as [I300] on {Luis} lasts 1 day
[I300] starts 2026-02-13
[I300] is 100% completed
[I300] is colored in PaleGreen/SeaGreen
[feat(change): add ChangeSet models and invocati... (#301)] as [I301] on {Luis} lasts 1 day
[I301] starts 2026-02-16
[I301] is 100% completed
[I301] is colored in PaleGreen/SeaGreen
[feat(change): add diff review artifacts (#303)] as [I303] on {Luis} lasts 1 day
[I303] starts 2026-02-17
[I303] is 100% completed
[I303] is colored in PaleGreen/SeaGreen
[docs(skill): add skill YAML schema and examples (#281)] as [I281] on {Aditya} lasts 1 day
[I281] starts 2026-02-11
[I281] is 100% completed
[I281] is colored in PaleGreen/SeaGreen
[feat(cli): add skill commands (#285)] as [I285] on {Aditya} lasts 1 day
[I285] starts 2026-02-12
[I285] is 100% completed
[I285] is colored in PaleGreen/SeaGreen
[docs(actor): update schema.py module docstring (#286)] as [I286] on {Aditya} lasts 1 day
[I286] starts 2026-02-13
[I286] is 100% completed
[I286] is colored in PaleGreen/SeaGreen
[Feat: Harden actor configuration handling with ... (#289)] as [I289] on {Aditya} lasts 1 day
[I289] starts 2026-02-16
[I289] is 100% completed
[I289] is colored in PaleGreen/SeaGreen
[feat(tool): add tool and validation domain models (#290)] as [I290] on {Aditya} lasts 1 day
[I290] starts 2026-02-17
[I290] is 100% completed
[I290] is colored in PaleGreen/SeaGreen
[feat(actor): add actor yaml schema models (#292)] as [I292] on {Aditya} lasts 1 day
[I292] starts 2026-02-18
[I292] is 100% completed
[I292] is colored in PaleGreen/SeaGreen
[docs(actor): add comprehensive actor YAML examp... (#293)] as [I293] on {Aditya} lasts 1 day
[I293] starts 2026-02-19
[I293] is 100% completed
[I293] is colored in PaleGreen/SeaGreen
[feat(actor): add actor registry and loader (#294)] as [I294] on {Aditya} lasts 1 day
[I294] starts 2026-02-20
[I294] is 100% completed
[I294] is colored in PaleGreen/SeaGreen

' --- Actor Runtime & Tool Execution (M1) (#355) ---
[Actor Runtime & Tool Execution (M1) (#355)] as [M1] on {Brent} {Hamza} {Jeff} {Luis} requires 3 days
[M1] starts at [PROJ]'s end
[M1] is 100% completed
[M1] is colored in DarkSeaGreen/ForestGreen

[feat(actor): add tool-calling runtime for execu... (#152)] as [I152] on {Jeff} lasts 1 day
[I152] starts 2026-02-18
[I152] is 100% completed
[I152] is colored in PaleGreen/SeaGreen
[feat(plan): wire execute phase to actor runtime... (#153)] as [I153] on {Jeff} lasts 1 day
[I153] starts 2026-02-19
[I153] is 100% completed
[I153] is colored in PaleGreen/SeaGreen
[feat(resource): add handler runtime for git-che... (#154)] as [I154] on {Hamza} lasts 1 day
[I154] starts 2026-02-18
[I154] is 100% completed
[I154] is colored in PaleGreen/SeaGreen
[feat(apply): merge sandbox changes into targets... (#155)] as [I155] on {Luis} lasts 1 day
[I155] starts 2026-02-18
[I155] is 100% completed
[I155] is colored in PaleGreen/SeaGreen
[test(e2e): add M1 source-code plan lifecycle suite (#156)] as [I156] on {Brent} lasts 1 day
[I156] starts 2026-02-18
[I156] is 100% completed
[I156] is colored in PaleGreen/SeaGreen

' --- Actor Graphs + Tool Sources (M2) (#356) ---
[Actor Graphs + Tool Sources (M2) (#356)] as [M2] on {Aditya} {Brent} {Hamza} {Jeff} {Luis} requires 5 days
[M2] starts at [M1]'s end
[M2] is 100% completed
[M2] is colored in DarkSeaGreen/ForestGreen

[feat(actor): extend hierarchical actor YAML sch... (#157)] as [I157] on {Aditya} lasts 1 day
[I157] starts 2026-02-23
[I157] is 100% completed
[I157] is colored in PaleGreen/SeaGreen
[feat(skill): add MCP adapter for external tools (#159)] as [I159] on {Aditya} lasts 1 day
[I159] starts 2026-02-24
[I159] is 100% completed
[I159] is colored in PaleGreen/SeaGreen
[feat(skill): add agent skills loader (#160)] as [I160] on {Aditya} lasts 1 day
[I160] starts 2026-02-25
[I160] is 100% completed
[I160] is colored in PaleGreen/SeaGreen
[feat(cli): add skill tools and refresh commands (#167)] as [I167] on {Aditya} lasts 1 day
[I167] starts 2026-02-26
[I167] is 100% completed
[I167] is colored in PaleGreen/SeaGreen
[feat(skill): add MCP refresh hooks (#168)] as [I168] on {Aditya} lasts 1 day
[I168] starts 2026-02-27
[I168] is 100% completed
[I168] is colored in PaleGreen/SeaGreen
[feat(lsp): add registry and runtime stubs (#164)] as [I164] on {Jeff} lasts 1 day
[I164] starts 2026-02-23
[I164] is 100% completed
[I164] is colored in PaleGreen/SeaGreen
[feat(actor): compile hierarchical actor configs... (#158)] as [I158] on {Jeff} lasts 1 day
[I158] starts 2026-02-24
[I158] is 100% completed
[I158] is colored in PaleGreen/SeaGreen
[feat(skill): integrate agent skills discovery (#161)] as [I161] on {Jeff} lasts 1 day
[I161] starts 2026-02-25
[I161] is 100% completed
[I161] is colored in PaleGreen/SeaGreen
[feat(skill): add registry flattening and capabi... (#165)] as [I165] on {Jeff} lasts 1 day
[I165] starts 2026-02-26
[I165] is 100% completed
[I165] is colored in PaleGreen/SeaGreen
[feat(resource): add resource registry and DAG m... (#162)] as [I162] on {Hamza} lasts 1 day
[I162] starts 2026-02-23
[I162] is 100% completed
[I162] is colored in PaleGreen/SeaGreen
[feat(changeset): persist changesets and diff ar... (#163)] as [I163] on {Luis} lasts 1 day
[I163] starts 2026-02-23
[I163] is 100% completed
[I163] is colored in PaleGreen/SeaGreen
[feat(skill): persist flattened tool sets (#166)] as [I166] on {Luis} lasts 1 day
[I166] starts 2026-02-24
[I166] is 100% completed
[I166] is colored in PaleGreen/SeaGreen
[test(e2e): add M2 actor + tool source smoke suite (#169)] as [I169] on {Brent} lasts 1 day
[I169] starts 2026-02-23
[I169] is 100% completed
[I169] is colored in PaleGreen/SeaGreen

' ================================================================
'  LEGENDARY #375: Execution Pipeline & Decisions
' ================================================================
-- Execution Pipeline & Decisions (#375) --

' --- Execution Pipeline & Domain Events (#361) ---
[Execution Pipeline & Domain Events (#361)] as [PIPE] on {Jeff} requires 2 days
[PIPE] starts 2026-02-18
[PIPE] is 100% completed
[PIPE] is colored in DarkSeaGreen/ForestGreen

[feat(execute): add changeset model and change c... (#304)] as [I304] on {Jeff} lasts 1 day
[I304] starts 2026-02-18
[I304] is 100% completed
[I304] is colored in PaleGreen/SeaGreen
[feat(plan): execute strategize and execute via ... (#305)] as [I305] on {Jeff} lasts 1 day
[I305] starts 2026-02-19
[I305] is 100% completed
[I305] is colored in PaleGreen/SeaGreen
[feat(plan): add diff review and apply integration (#306)] as [I306] on {Jeff} lasts 1 day
[I306] starts 2026-02-20
[I306] is 100% completed
[I306] is colored in PaleGreen/SeaGreen

' --- Decisions + Validations + Invariants (M3) (#357) ---
[Decisions + Validations + Invariants (M3) (#357)] as [M3] on {Brent} {Hamza} {Jeff} {Luis} requires 4 days
[M3] starts at [M2]'s end
[M3] is 87% completed
[M3] is colored in CornflowerBlue/MediumBlue

[feat(decision): add decision domain and context... (#170)] as [I170] on {Hamza} lasts 1 day
[I170] starts 2026-03-02
[I170] is 0% completed
[I170] is colored in #E8E8E8/Silver
[feat(decision): add decision persistence (#171)] as [I171] on {Hamza} lasts 1 day
[I171] starts 2026-03-03
[I171] is 100% completed
[I171] is colored in PaleGreen/SeaGreen
[feat(service): add decision recording and snaps... (#172)] as [I172] on {Hamza} lasts 1 day
[I172] starts 2026-03-04
[I172] is 0% completed
[I172] is colored in #E8E8E8/Silver
[feat(cli): add plan explain and decision tree o... (#174)] as [I174] on {Hamza} lasts 1 day
[I174] starts 2026-03-05
[I174] is 0% completed
[I174] is colored in #E8E8E8/Silver
[feat(di): wire decision services (#173)] as [I173] on {Luis} lasts 1 day
[I173] starts 2026-03-02
[I173] is 100% completed
[I173] is colored in PaleGreen/SeaGreen
[feat(validation): add validation pipeline and r... (#175)] as [I175] on {Luis} lasts 1 day
[I175] starts 2026-03-03
[I175] is 100% completed
[I175] is colored in PaleGreen/SeaGreen
[feat(validation): add validation runner and app... (#176)] as [I176] on {Luis} lasts 1 day
[I176] starts 2026-03-04
[I176] is 100% completed
[I176] is colored in PaleGreen/SeaGreen
[feat(dod): enforce definition-of-done gating (#178)] as [I178] on {Luis} lasts 1 day
[I178] starts 2026-03-05
[I178] is 100% completed
[I178] is colored in PaleGreen/SeaGreen
[feat(invariant): add invariant models and enfor... (#177)] as [I177] on {Jeff} lasts 1 day
[I177] starts 2026-03-02
[I177] is 100% completed
[I177] is colored in PaleGreen/SeaGreen
[test(e2e): add M3 decision + validation suites (#179)] as [I179] on {Brent} lasts 1 day
[I179] starts 2026-03-02
[I179] is 100% completed
[I179] is colored in PaleGreen/SeaGreen
[test(persistence): add decision persistence suites (#180)] as [I180] on {Brent} lasts 1 day
[I180] starts 2026-03-03
[I180] is 100% completed
[I180] is colored in PaleGreen/SeaGreen

' ================================================================
'  LEGENDARY #376: Hardening, Testing & Security
' ================================================================
-- Hardening, Testing & Security (#376) --

' --- Corrections + Subplans + Checkpoints (M4) (#358) ---
[Corrections + Subplans + Checkpoints (M4) (#358)] as [M4] on {Brent} {Hamza} {Jeff} {Luis} requires 3 days
[M4] starts at [M3]'s end
[M4] is 95% completed
[M4] is colored in CornflowerBlue/MediumBlue

[feat(correction): add correction model and CLI ... (#181)] as [I181] on {Jeff} lasts 1 day
[I181] starts 2026-03-06
[I181] is 100% completed
[I181] is colored in PaleGreen/SeaGreen
[feat(correction): implement revert and append f... (#182)] as [I182] on {Jeff} lasts 1 day
[I182] starts 2026-03-09
[I182] is 100% completed
[I182] is colored in PaleGreen/SeaGreen
[feat(plan): add phase reversion state machine (#185)] as [I185] on {Jeff} lasts 1 day
[I185] starts 2026-03-10
[I185] is 0% completed
[I185] is colored in #E8E8E8/Silver
[feat(sandbox): add checkpoint and rollback hooks (#183)] as [I183] on {Hamza} lasts 1 day
[I183] starts 2026-03-06
[I183] is 100% completed
[I183] is colored in PaleGreen/SeaGreen
[feat(subplan): execute and merge subplans (#184)] as [I184] on {Luis} lasts 1 day
[I184] starts 2026-03-06
[I184] is 0% completed
[I184] is colored in #E8E8E8/Silver
[feat(plan): add error recovery patterns and CLI... (#186)] as [I186] on {Luis} lasts 1 day
[I186] starts 2026-03-09
[I186] is 100% completed
[I186] is colored in PaleGreen/SeaGreen
[test(e2e): add M4 correction + subplan suites (#187)] as [I187] on {Brent} lasts 1 day
[I187] starts 2026-03-06
[I187] is 100% completed
[I187] is colored in PaleGreen/SeaGreen

' --- Security & Safety Hardening (#362) ---
[Security & Safety Hardening (#362)] as [SEC] on {Luis} requires 3 days
[SEC] starts 2026-03-02
[SEC] is 80% completed
[SEC] is colored in CornflowerBlue/MediumBlue

[fix(security): remove eval-based config parsing (#318)] as [I318] on {Luis} lasts 1 day
[I318] starts 2026-03-02
[I318] is 100% completed
[I318] is colored in PaleGreen/SeaGreen
[fix(security): harden template rendering (#319)] as [I319] on {Luis} lasts 1 day
[I319] starts 2026-03-03
[I319] is 100% completed
[I319] is colored in PaleGreen/SeaGreen
[fix(security): enforce explicit exception handling (#320)] as [I320] on {Luis} lasts 1 day
[I320] starts 2026-03-04
[I320] is 100% completed
[I320] is colored in PaleGreen/SeaGreen
[fix(security): close async resources and leaks (#321)] as [I321] on {Luis} lasts 1 day
[I321] starts 2026-03-05
[I321] is 100% completed
[I321] is colored in PaleGreen/SeaGreen
[feat(security): enforce read-only actions (#322)] as [I322] on {Luis} lasts 1 day
[I322] starts 2026-03-06
[I322] is 100% completed
[I322] is colored in PaleGreen/SeaGreen

' --- Provider Fixes & Runtime Tweaks (#363) ---
[Provider Fixes & Runtime Tweaks (#363)] as [PROV] on {Luis} requires 2 days
[PROV] starts 2026-02-12
[PROV] is 0% completed
[PROV] is colored in #D0D0D0/DimGray

[fix(provider): remove FakeListLLM defaults (#323)] as [I323] on {Luis} lasts 1 day
[I323] starts 2026-02-12
[I323] is 0% completed
[I323] is colored in #E8E8E8/Silver
[feat(provider): add cost controls and fallback (#324)] as [I324] on {Luis} lasts 1 day
[I324] starts 2026-02-13
[I324] is 0% completed
[I324] is colored in #E8E8E8/Silver

' ================================================================
'  LEGENDARY #377: Day 14 Rebaseline Milestones
' ================================================================
-- Day 14 Rebaseline Milestones (#377) --

' --- ACMS v1 + Context Scaling (M5) (#359) ---
[ACMS v1 + Context Scaling (M5) (#359)] as [M5] on {Aditya} {Brent} {Hamza} {Jeff} requires 4 days
[M5] starts at [M4]'s end
[M5] is 7% completed
[M5] is colored in CornflowerBlue/MediumBlue

[feat(acms): add ACMS v1 context pipeline (#188)] as [I188] on {Hamza} lasts 1 day
[I188] starts 2026-03-11
[I188] is 0% completed
[I188] is colored in #E8E8E8/Silver
[feat(uko): add UKO ontology scaffolding (#189)] as [I189] on {Hamza} lasts 1 day
[I189] starts 2026-03-12
[I189] is 0% completed
[I189] is colored in #E8E8E8/Silver
[feat(acms): add context strategy registry (#191)] as [I191] on {Hamza} lasts 1 day
[I191] starts 2026-03-13
[I191] is 0% completed
[I191] is colored in #E8E8E8/Silver
[feat(acms): add scoped backend view filtering (#193)] as [I193] on {Hamza} lasts 1 day
[I193] starts 2026-03-16
[I193] is 0% completed
[I193] is colored in #E8E8E8/Silver
[feat(context): add repo indexing service (#195)] as [I195] on {Hamza} lasts 1 day
[I195] starts 2026-03-17
[I195] is 0% completed
[I195] is colored in #E8E8E8/Silver
[feat(plan): add multi-project subplan support (#199)] as [I199] on {Hamza} lasts 1 day
[I199] starts 2026-03-18
[I199] is 0% completed
[I199] is colored in #E8E8E8/Silver
[feat(automation): add automation profiles and g... (#196)] as [I196] on {Jeff} lasts 1 day
[I196] starts 2026-03-11
[I196] is 100% completed
[I196] is colored in PaleGreen/SeaGreen
[feat(acms): add context request protocol models (#190)] as [I190] on {Jeff} lasts 1 day
[I190] starts 2026-03-12
[I190] is 0% completed
[I190] is colored in #E8E8E8/Silver
[feat(acms): add strategy coordinator and fusion... (#192)] as [I192] on {Jeff} lasts 1 day
[I192] starts 2026-03-13
[I192] is 0% completed
[I192] is colored in #E8E8E8/Silver
[feat(acms): add skeleton compressor (#194)] as [I194] on {Jeff} lasts 1 day
[I194] starts 2026-03-16
[I194] is 0% completed
[I194] is colored in #E8E8E8/Silver
[feat(service): add subplan service and spawn wo... (#197)] as [I197] on {Jeff} lasts 1 day
[I197] starts 2026-03-17
[I197] is 0% completed
[I197] is colored in #E8E8E8/Silver
[feat(actor): add plan_subplan tool and decision... (#198)] as [I198] on {Aditya} lasts 1 day
[I198] starts 2026-03-11
[I198] is 0% completed
[I198] is colored in #E8E8E8/Silver
[test(e2e): add M5 ACMS + context suites (#200)] as [I200] on {Brent} lasts 1 day
[I200] starts 2026-03-11
[I200] is 0% completed
[I200] is colored in #E8E8E8/Silver

' --- Autonomy Hardening + Server Stubs (M6) (#360) ---
[Autonomy Hardening + Server Stubs (M6) (#360)] as [M6] on {Brent} {Hamza} {Jeff} {Luis} requires 5 days
[M6] starts at [M5]'s end
[M6] is 9% completed
[M6] is colored in CornflowerBlue/MediumBlue

[feat(interfaces): add server client stubs (#201)] as [I201] on {Luis} lasts 1 day
[I201] starts 2026-03-17
[I201] is 0% completed
[I201] is colored in #E8E8E8/Silver
[feat(automation): add autonomy guardrails and a... (#204)] as [I204] on {Luis} lasts 1 day
[I204] starts 2026-03-18
[I204] is 0% completed
[I204] is colored in #E8E8E8/Silver
[feat(checkpoint): add checkpointing and rollback (#206)] as [I206] on {Luis} lasts 1 day
[I206] starts 2026-03-19
[I206] is 0% completed
[I206] is colored in #E8E8E8/Silver
[feat(validation): add semantic validation service (#207)] as [I207] on {Luis} lasts 1 day
[I207] starts 2026-03-20
[I207] is 0% completed
[I207] is colored in #E8E8E8/Silver
[feat(acp): add local facade and server stubs (#202)] as [I202] on {Jeff} lasts 1 day
[I202] starts 2026-03-17
[I202] is 100% completed
[I202] is colored in PaleGreen/SeaGreen
[feat(lsp): add LSP server stub (#203)] as [I203] on {Jeff} lasts 1 day
[I203] starts 2026-03-18
[I203] is 0% completed
[I203] is colored in #E8E8E8/Silver
[feat(plan): add large-project decomposition and... (#205)] as [I205] on {Jeff} lasts 1 day
[I205] starts 2026-03-19
[I205] is 0% completed
[I205] is colored in #E8E8E8/Silver
[chore(cli): polish help and output (#210)] as [I210] on {Jeff} lasts 1 day
[I210] starts 2026-03-20
[I210] is 0% completed
[I210] is colored in #E8E8E8/Silver
[feat(context): add hot/warm/cold tiers and acto... (#208)] as [I208] on {Hamza} lasts 1 day
[I208] starts 2026-03-17
[I208] is 0% completed
[I208] is colored in #E8E8E8/Silver
[feat(estimation): add cost and risk estimation ... (#209)] as [I209] on {Hamza} lasts 1 day
[I209] starts 2026-03-18
[I209] is 0% completed
[I209] is colored in #E8E8E8/Silver
[test(e2e): add M6 autonomy acceptance suite (#211)] as [I211] on {Brent} lasts 1 day
[I211] starts 2026-03-17
[I211] is 0% completed
[I211] is colored in #E8E8E8/Silver

' --- Subplans & Parallelism (#368) ---
[Subplans & Parallelism (#368)] as [SUBP] on {Brent} {Luis} requires 2 days
[SUBP] starts 2026-02-23
[SUBP] is 100% completed
[SUBP] is colored in DarkSeaGreen/ForestGreen

[feat(core): add v3 lifecycle models, automation... (#307)] as [I307] on {Luis} lasts 1 day
[I307] starts 2026-02-23
[I307] is 100% completed
[I307] is colored in PaleGreen/SeaGreen
[Traceability (Luis): Updated E1.domain commit m... (#308)] as [I308] lasts 1 day
[I308] starts 2026-02-23
[I308] is 100% completed
[I308] is colored in PaleGreen/SeaGreen
[Stage E1: Subplan Model (Luis) (#309)] as [I309] lasts 1 day
[I309] starts 2026-02-24
[I309] is 100% completed
[I309] is colored in PaleGreen/SeaGreen
[test(domain): add subplan model suites (#310)] as [I310] on {Brent} lasts 1 day
[I310] starts 2026-02-23
[I310] is 100% completed
[I310] is colored in PaleGreen/SeaGreen

' --- Large Project Autonomy & Context (#369) ---
[Large Project Autonomy & Context (#369)] as [LARGE] on {Brent} {Jeff} {Luis} requires 4 days
[LARGE] starts 2026-03-17
[LARGE] is 57% completed
[LARGE] is colored in CornflowerBlue/MediumBlue

[feat(cli): add output rendering framework with ... (#311)] as [I311] on {Jeff} lasts 1 day
[I311] starts 2026-03-17
[I311] is 100% completed
[I311] is colored in PaleGreen/SeaGreen
[feat(async): add async command execution and wo... (#312)] as [I312] on {Luis} lasts 1 day
[I312] starts 2026-03-17
[I312] is 0% completed
[I312] is colored in #E8E8E8/Silver
[feat(async): wire retry policies into services (#313)] as [I313] on {Luis} lasts 1 day
[I313] starts 2026-03-18
[I313] is 0% completed
[I313] is colored in #E8E8E8/Silver
[test(validation): add semantic validation suites (#316)] as [I316] on {Luis} lasts 1 day
[I316] starts 2026-03-19
[I316] is 0% completed
[I316] is colored in #E8E8E8/Silver
[docs(qa): add review playbook and priority matrix (#314)] as [I314] on {Brent} lasts 1 day
[I314] starts 2026-03-17
[I314] is 100% completed
[I314] is colored in PaleGreen/SeaGreen
[test(validation): add edge case suites (#315)] as [I315] on {Brent} lasts 1 day
[I315] starts 2026-03-18
[I315] is 100% completed
[I315] is colored in PaleGreen/SeaGreen
[test(perf): add scale test fixtures (#317)] as [I317] on {Brent} lasts 1 day
[I317] starts 2026-03-19
[I317] is 100% completed
[I317] is colored in PaleGreen/SeaGreen

' ================================================================
'  LEGENDARY #378: Post-MVP Deferred Work
' ================================================================
-- Post-MVP Deferred Work (#378) --

' --- Post-MVP Deferred Work (#366) ---
[Post-MVP Deferred Work (#366)] as [POST] on {Brent} {Hamza} {Jeff} {Luis} {Rui} requires 8 days
[POST] starts at [M6]'s end
[POST] is 0% completed
[POST] is colored in #D0D0D0/DimGray

[feat(resource): add virtual core resource types (#329)] as [I329] on {Hamza} lasts 1 day
[I329] starts 2026-03-24
[I329] is 0% completed
[I329] is colored in #E8E8E8/Silver
[feat(resource): add deferred physical resource ... (#330)] as [I330] on {Hamza} lasts 1 day
[I330] starts 2026-03-25
[I330] is 0% completed
[I330] is colored in #E8E8E8/Silver
[feat(resource): add deferred virtual resource t... (#331)] as [I331] on {Hamza} lasts 1 day
[I331] starts 2026-03-26
[I331] is 0% completed
[I331] is colored in #E8E8E8/Silver
[feat(resource): add virtual resource equivalenc... (#334)] as [I334] on {Hamza} lasts 1 day
[I334] starts 2026-03-27
[I334] is 0% completed
[I334] is colored in #E8E8E8/Silver
[feat(client): add remote project support (#338)] as [I338] on {Hamza} lasts 1 day
[I338] starts 2026-03-30
[I338] is 0% completed
[I338] is colored in #E8E8E8/Silver
[feat(resource): add database resources (#342)] as [I342] on {Hamza} lasts 1 day
[I342] starts 2026-03-31
[I342] is 0% completed
[I342] is colored in #E8E8E8/Silver
[feat(resource): add cloud infrastructure resources (#343)] as [I343] on {Hamza} lasts 1 day
[I343] starts 2026-04-01
[I343] is 0% completed
[I343] is colored in #E8E8E8/Silver
[feat(security): add safety profile model and en... (#332)] as [I332] on {Luis} lasts 1 day
[I332] starts 2026-03-24
[I332] is 0% completed
[I332] is colored in #E8E8E8/Silver
[feat(client): add server http client (#335)] as [I335] on {Luis} lasts 1 day
[I335] starts 2026-03-25
[I335] is 0% completed
[I335] is colored in #E8E8E8/Silver
[feat(client): add plan sync and remote execution (#336)] as [I336] on {Luis} lasts 1 day
[I336] starts 2026-03-26
[I336] is 0% completed
[I336] is colored in #E8E8E8/Silver
[feat(client): add websocket updates (#337)] as [I337] on {Luis} lasts 1 day
[I337] starts 2026-03-27
[I337] is 0% completed
[I337] is colored in #E8E8E8/Silver
[feat(cli): add auth and team commands (#340)] as [I340] on {Luis} lasts 1 day
[I340] starts 2026-03-30
[I340] is 0% completed
[I340] is colored in #E8E8E8/Silver
[feat(security): add permission system (#344)] as [I344] on {Luis} lasts 1 day
[I344] starts 2026-03-31
[I344] is 0% completed
[I344] is colored in #E8E8E8/Silver
[feat(security): add safety profile enforcement (#345)] as [I345] on {Luis} lasts 1 day
[I345] starts 2026-04-01
[I345] is 0% completed
[I345] is colored in #E8E8E8/Silver
[test(security): cover safety profile enforcement (#333)] as [I333] on {Brent} lasts 1 day
[I333] starts 2026-03-24
[I333] is 0% completed
[I333] is colored in #E8E8E8/Silver
[feat(cli): add interactive repl (#339)] as [I339] on {Rui} lasts 1 day
[I339] starts 2026-03-24
[I339] is 0% completed
[I339] is colored in #E8E8E8/Silver
[feat(ui): add TUI/Web interface (#341)] as [I341] on {Jeff} lasts 1 day
[I341] starts 2026-03-24
[I341] is 0% completed
[I341] is colored in #E8E8E8/Silver

' --- Multi-Agent RDF System (#367) ---
[Multi-Agent RDF System (#367)] as [RDF] on {Aditya} requires 5 days
[RDF] starts 2026-03-24
[RDF] is 0% completed
[RDF] is colored in #D0D0D0/DimGray

[Build an automated multi-agent system that gene... (#29)] as [I29] on {Aditya} lasts 1 day
[I29] starts 2026-03-24
[I29] is 0% completed
[I29] is colored in #E8E8E8/Silver
' ================================================================
'  DEPENDENCY ARROWS
'  Intra-epic developer chains + verified cross-epic links
'  ~184 arrows connecting 212 of 213 issues
' ================================================================

' --- Pre-Rebaseline Foundation (#370) ---

' Testing Framework (#24) - Aditya chain
[I13] -> [I14]
[I14] -> [I17]

' Bug Fixes (#25) → cross-epic links (same legendary)
[I3] -> [I9]
[I4] -> [I14]

' Core Functionality (#26) - unassigned chain
[I1] -> [I2]
[I2] -> [I15]
' Core Functionality (#26) - Aditya chain
[I18] -> [I19]
[I19] -> [I20]
[I20] -> [I23]
' Cross-track
[I15] -> [I23]

' Documentation (#27)
[I8] -> [I9]
[I9] -> [I10]
[I7] -> [I10]

' Security (#28) - Aditya chain
[I11] -> [I12]

' --- Foundation & Infrastructure (#371) ---

' Foundation Phases (#346)
[I215] -> [I216]

' Preserved Work (#347) - sequential
[I217] -> [I218]
[I218] -> [I219]
[I219] -> [I220]

' Traceability (#348) - sequential commits
[I221] -> [I222]
[I222] -> [I223]
[I223] -> [I224]
[I224] -> [I225]
[I225] -> [I226]
[I226] -> [I227]
[I227] -> [I228]
[I228] -> [I229]

' QA (#349) - Brent chain
[I212] -> [I213]
[I213] -> [I214]

' Cross: Foundation → Traceability
[I215] -> [I221]

' --- Plan Lifecycle A1-A5 (#350) ---

' Generic plan model chain
[I230] -> [I231]
[I231] -> [I236]
[I236] -> [I237]
' Jeff alignment → CLI → DB → service chain
[I232] -> [I235]
[I235] -> [I238]
[I238] -> [I239]
[I239] -> [I240]
[I240] -> [I242]
[I242] -> [I243]
[I243] -> [I244]
[I244] -> [I245]
[I245] -> [I246]
[I246] -> [I247]
' Brent testing chain
[I241] -> [I248]
[I248] -> [I249]
' Cross-developer: Luis→generic, Aditya→Brent
[I233] -> [I250]
[I234] -> [I248]

' --- Plan Lifecycle A6-A8 (#351) ---

' Jeff session chain
[I251] -> [I252]
[I252] -> [I253]
' Brent testing chain
[I254] -> [I256]
[I256] -> [I257]
' Luis persistence feeds session
[I255] -> [I253]
' Cross: A1-A5 → A6-A8
[I240] -> [I251]
[I249] -> [I254]

' --- Config Service A9 (#352) ---
[I258] -> [I259]

' --- CLI Extensions (#364) ---
[I325] -> [I326]

' --- Concurrency (#365) ---
[I327] -> [I328]

' Cross: Sessions → CLI/Concurrency
[I257] -> [I325]
[I253] -> [I327]

' --- Projects & Resources B0-B2 (#353) ---

' Hamza domain + sandbox chain
[I260] -> [I271]
[I271] -> [I272]
' Jeff resource → project chain
[I261] -> [I262]
[I262] -> [I263]
[I263] -> [I264]
[I264] -> [I266]
[I266] -> [I267]
[I267] -> [I268]
[I268] -> [I269]
[I269] -> [I270]
[I270] -> [I273]
[I273] -> [I274]
' Cross-developer: Brent→Hamza
[I265] -> [I271]

' --- Actor & Skill Schema C0 (#354) ---

' Jeff tool/skill core chain
[I275] -> [I276]
[I276] -> [I277]
[I277] -> [I280]
[I280] -> [I282]
[I282] -> [I287]
[I287] -> [I291]
[I291] -> [I295]
[I295] -> [I296]
[I296] -> [I297]
[I297] -> [I298]
[I298] -> [I299]
[I299] -> [I302]
[I302] -> [I288]
' Luis persistence chain
[I279] -> [I284]
[I284] -> [I300]
[I300] -> [I301]
[I301] -> [I303]
' Brent testing
[I278] -> [I283]
' Aditya docs/schema chain
[I281] -> [I285]
[I285] -> [I286]
[I286] -> [I289]
[I289] -> [I290]
[I290] -> [I292]
[I292] -> [I293]
[I293] -> [I294]
' Cross-developer: Luis→Jeff, Brent→Aditya, Aditya→Jeff
[I284] -> [I280]
[I283] -> [I286]
[I294] -> [I288]

' --- Actor Runtime M1 (#355) ---

' Jeff chain
[I152] -> [I153]
' Cross: C0 → M1 (connects parallel developers)
[I276] -> [I154]
[I279] -> [I155]
[I278] -> [I156]

' Cross: M1 → M2
[I153] -> [I158]

' --- Actor Graphs M2 (#356) ---

' Aditya chain
[I157] -> [I159]
[I159] -> [I160]
[I160] -> [I167]
[I167] -> [I168]
' Jeff chain
[I164] -> [I158]
[I158] -> [I161]
[I161] -> [I165]
' Luis chain
[I163] -> [I166]
' Cross-developer: Hamza→Luis
[I162] -> [I166]
' Cross: Brent M2 → M3
[I169] -> [I170]

' --- Execution Pipeline (#361) ---

[I304] -> [I305]
[I305] -> [I306]
' Cross: PIPE → M3
[I306] -> [I170]

' --- Decisions M3 (#357) ---

' Hamza decision chain
[I170] -> [I171]
[I171] -> [I172]
[I172] -> [I174]
' Luis validation chain
[I173] -> [I175]
[I175] -> [I176]
[I176] -> [I178]
' Brent testing
[I179] -> [I180]
' Cross-developer: Jeff invariant → Luis validation
[I177] -> [I175]

' Cross: M3 → M4
[I178] -> [I181]

' --- Corrections M4 (#358) ---

' Jeff correction chain
[I181] -> [I182]
[I182] -> [I185]
' Luis chain
[I184] -> [I186]
' Cross-developer: Hamza→Luis, Brent→Jeff
[I183] -> [I186]
[I187] -> [I182]

' --- Security & Safety (#362) ---

[I318] -> [I319]
[I319] -> [I320]
[I320] -> [I321]
[I321] -> [I322]

' --- Provider Fixes (#363) ---

[I323] -> [I324]

' Cross: M4 → M5
[I185] -> [I188]

' --- ACMS v1 + Context M5 (#359) ---

' Hamza ACMS chain
[I188] -> [I189]
[I189] -> [I191]
[I191] -> [I193]
[I193] -> [I195]
[I195] -> [I199]
' Jeff ACMS chain
[I196] -> [I190]
[I190] -> [I192]
[I192] -> [I194]
[I194] -> [I197]
' Cross-developer: Aditya→Hamza, Brent→Jeff
[I198] -> [I189]
[I200] -> [I190]

' Cross: M5 → M6
[I194] -> [I201]
[I193] -> [I208]

' --- Autonomy M6 (#360) ---

' Luis service chain
[I201] -> [I204]
[I204] -> [I206]
[I206] -> [I207]
' Jeff server/CLI chain
[I202] -> [I203]
[I203] -> [I205]
[I205] -> [I210]
' Hamza context chain
[I208] -> [I209]
' Cross-developer: Brent→Luis
[I211] -> [I204]

' --- Subplans & Parallelism (#368) ---

[I307] -> [I309]
[I308] -> [I309]
[I310] -> [I309]

' --- Large Project Autonomy (#369) ---

' Luis async chain
[I312] -> [I313]
[I313] -> [I316]
' Brent QA chain
[I314] -> [I315]
[I315] -> [I317]
' Cross-developer: Jeff→Luis
[I311] -> [I313]

' Cross: M6 → Post-MVP
[I210] -> [I341]
[I207] -> [I332]

' --- Post-MVP Deferred Work (#366) ---

' Hamza resource chain
[I329] -> [I330]
[I330] -> [I331]
[I331] -> [I334]
[I334] -> [I338]
[I338] -> [I342]
[I342] -> [I343]
' Luis client/security chain
[I332] -> [I335]
[I335] -> [I336]
[I336] -> [I337]
[I337] -> [I340]
[I340] -> [I344]
[I344] -> [I345]
' Cross-developer orphan connections
[I333] -> [I335]
[I339] -> [I330]
[I341] -> [I338]


' ================================================================
'  MILESTONE MARKERS
' ================================================================
-- Milestones --

[v3.0.0 - M1 Release] as [MS1] happens 2026-02-13
[v3.1.0 - M2 Release] as [MS2] happens 2026-02-20
[v3.2.0 - M3 Release] as [MS3] happens 2026-02-26
[v3.3.0 - M4 Release] as [MS4] happens 2026-03-02
[v3.4.0 - M5 Release] as [MS5] happens 2026-03-06
[v3.5.0 - M6 Release] as [MS6] happens 2026-03-10
[v3.6.0 - Post-MVP] as [MS7] happens 2026-03-27

' ================================================================
'  DEVELOPER ALLOCATION LEGEND
' ================================================================

legend right
  **CleverAgents Core - Developer Allocation**
  ----
  |= Developer |= Role |= Total Pts |= Est. Hours |
  | Jeff (freemo) | CTO / Lead Architect | 480 | ~960h |
  | Luis (CoreRasurae) | Sr. Python Architect | 338 | ~676h |
  | Aditya | Domain Expert (Agents) | 183 | ~366h |
  | Hamza (hamza.khyari) | Infrastructure / RDF | 171 | ~342h |
  | Brent (brent.edwards) | Quality / QA | 170 | ~340h |
  | Rui (hurui200320) | Testing | 8 | ~16h |
  ----
  **Per-Milestone (done/total story points)**
  |= Dev |= v3.0 |= v3.1 |= v3.2 |= v3.3 |= v3.4 |= v3.5 |= v3.6 |
  | Jeff | 172/172 | 105/142 | 37/37 | 31/34 | 5/45 | 13/42 | 0/8 |
  | Luis | 8/32 | 29/66 | 0/34 | 16/61 | 13/21 | 0/68 | 0/56 |
  | Aditya | 55/94 | 44/81 | - | - | 0/8 | - | - |
  | Hamza | 11/19 | 0/5 | 0/23 | 0/5 | 0/45 | 0/21 | 0/53 |
  | Brent | 65/70 | 10/20 | 0/10 | 21/26 | 5/10 | 24/29 | 0/5 |
  | Rui | - | - | - | - | - | - | 0/8 |
  ----
  **Color Key**
  |= Color |= Meaning |
  | <back:DarkSeaGreen>      </back> | Epic: Complete |
  | <back:CornflowerBlue>      </back> | Epic: In Progress |
  | <back:#D0D0D0>      </back> | Epic: Not Started |
  | <back:PaleGreen>      </back> | Issue: Complete |
  | <back:LightSkyBlue>      </back> | Issue: In Progress |
  | <back:#E8E8E8>      </back> | Issue: Not Started |
  | <back:Gold>  <>  </back> | Milestone Target |
  | <back:#FF6666>  |  </back> | Today (2026-03-02) |
  ----
  243 Issues | 29 Epics | 9 Legendaries | 7 Milestones
  ~1649 total story points | ~3300 estimated hours
end legend

@endgantt

This section provides a high-level overview of the CleverAgents implementation roadmap: what has been completed, what is in progress, and what remains across all major milestones. The project kicked off on 2026-02-09 and follows a milestone-driven schedule with six parallel workstreams converging at defined merge points.

Current Status Summary

As of Day 29 evening (2026-03-09), the project has closed ~266 of ~339 issues (79%) with ~1586 of 1966 story points completed (81%). The project is running 4-5 days behind the original schedule — steady since Day 25. Open PR count: 12 with 5 having merge conflicts. Major workload rebalancing completed Day 29 evening: Brent reduced from 55 SP to ~30 SP; Luis, Rui, and Aditya each gained 10-26 SP of actionable work. TDD infrastructure (#627-#629) now owned and on critical path. 4 new estimation domain issues created (#649-#652). PR #528 dispute resolved.

Day 27 highlights: Brent reported 2 new bugs (#620 skill add not registering, #621 tool add not registering) — both triaged with Priority/Critical, assigned to Jeff, milestone v3.2.0. Full TDD compliance sweep completed: 9 TDD counterpart issues created (#630-#638) for all 9 open bugs, with proper labels, milestones, and assignments. TDD infrastructure issues (#627-#629: Behave handler, Robot handler, CI quality gate) triaged, labeled, milestoned to v3.4.0, assigned to Brent. Bug priority corrections applied: #554, #563, #606 upgraded from Priority/Medium/Priority/High to Priority/Critical and MoSCoW/Must have (bugs are always top priority). Redundant bug repo-level labels removed from #554, #563, #620, #621 in favor of org-level Type/Bug. All 13 open PRs have been reviewed. 5 PRs still have merge conflicts (#618, #616, #615, #612, #610).

M1, M2 are fully complete. M3 and M4 are feature-complete — both acceptance gates merged. M3 now has 11 open bugs (original 6 + 2 new + 9 TDD counterparts in review). Bug-fix PRs #591, #593, #594 appear ready for merge (all review rounds addressed, rebased, CI passing). M4 needs security epic (#362) closure + bug #606 (plan correct tree wiring). M5 is 1 day past its Mar 6 target — realistic ETA ~Mar 9-10 (+3-4d). Remaining M5 work: repo indexing (#195, PR #610 — P0 blocker), UKO Indexer (PR #612 — 43 findings, no author response), strategy coordinator (#192, Jeff), TDD infrastructure (#627-#629). M6 has ~16 open issues with PRs in various review states.

!!! warning "Schedule Risk: 4-5 Days Behind (Steady)"

The project is running **4-5 days behind** the original aggressive schedule, steady since Day 25. M5 ETA ~Mar 10 (+4d). The gap is stable. **Bug-fix blitz Days 28-29**: Jeff merged 7 PRs including 4 Critical bug fixes and 3 M5 features. **Day 29 evening rebalancing**: Brent's bottleneck resolved (55 SP → 30 SP). TDD infrastructure (#627-#629) now owned by Luis/Rui (moved from v3.4.0 to v3.2.0). Aditya gained 26 SP of estimation domain work (#649-#652). PR #528 dispute resolved. Both Hamza and Luis responded to review escalations. **Merge throughput remains the primary bottleneck** — 12 open PRs with 5 merge conflicts. PRs #594, #595, #596 ready for final approval.

Parallel Workstreams

Development is organized into six concurrent workstreams plus continuous quality and testing tracks:

Track Focus Area Status
A — Plan Lifecycle Action/plan domain models, persistence, CLI alignment, execute/apply wiring Complete. Apply pipeline, changeset persistence, concurrency locks, plan resume, decision service wiring all done. Config service merged (#258, Mar 1). Large-project decomposition (#205), multi-project subplans (#199), execution environment routing (#512) all merged Days 23-24.
B — Projects & Resources Resource registry, project model, resource types, sandbox strategies, CLI Complete. Registry, models, CLI, handler runtime (git-checkout + fs-directory), DAG metadata all done. 6 bugs found (#522-#524, #589, #590, #592) — Brent has TDD PRs ready for all.
C — Actors, Tools, Skills Actor YAML schema/loader/compiler, tool registry/runtime, skill framework, MCP adapter, validation runner Complete. All components merged. Invariant reconciliation actor (#549) merged Day 24 (Jeff). Tool wrapping runtime (#543) merged Day 24 (Jeff).
D — Decisions & Apply Decision tree model, change tracking, diff review, apply pipeline, correction engine Complete. Decision recording (#172, PR #433) and plan explain CLI (#174, PR #464) merged Days 23-24 (Hamza). Influence DAG traversal (#542) merged Day 24 (Jeff). Cross-plan correction cascading (#547) merged Day 24 (Jeff).
E — Subplans Subplan domain model, orchestration, parallel execution, three-way merge Complete. Subplan execute+merge (#184) merged Mar 1. Subplan service (#197) merged in integration batch Mar 2.
F — ACMS & Context UKO ontology, CRP protocol, context strategies, assembly pipeline, hot/warm/cold tiers Near complete. ACMS v1 pipeline (#188), strategy registry (#191), scoped backend view (#193) all merged. Pipeline Phase 1 (#539), Phase 2 (#540), context strategies (#541), depth/breadth projection (#544), UKO analyzers (#551) all merged (Jeff). Remaining: repo indexing (#195, PR #610 in review), strategy coordinator (#192, Jeff), UKO Indexer (PR #612 in review).
Q — Quality & CI Pre-commit hooks, Forgejo CI/CD, coverage enforcement (97%), security scanning Complete. Coverage at 97-98%.
T — Testing Behave unit tests, Robot integration tests, ASV benchmarks, end-to-end smoke suites Strong progress. M3 E2E (#494 merged), M4 E2E (#495 merged), M5 E2E (#496, Rui — In Progress), M6 E2E (#497, Brent — In Review). 8 TDD PRs in advanced review cycles (most ready for final approval).

What Has Been Completed

The following major areas are fully or substantially implemented:

  • Domain models: Plan (with full lifecycle and subplan hierarchy), Action (with YAML schema and typed arguments), Tool and Validation (with resource bindings and capability metadata), Skill (with resolver and cycle detection), Session (with message ordering and token tracking), Resource (with DAG edges and type constraints), Decision (with 12 decision types and context snapshots), ChangeSet and ToolInvocation tracking models, Correction (revert/append modes), AutomationProfile (8 built-in profiles with confidence thresholds), Invariant (with scoped precedence).
  • Persistence layer: SQLite database with Alembic migrations (20 versions) for actions, plans, sessions, session messages, tools, tool resource bindings, validation attachments, resources, resource types, resource edges, and decision tables. Repository classes with retry decorators and referential integrity guards.
  • YAML configuration schemas: Action config schema with env var interpolation and key normalization, Actor config schema with three actor types (LLM/TOOL/GRAPH) and graph topology validation with cycle detection, Skill config schema with MCP server and Agent Skills folder support. All schemas include loader/validator Pydantic models with from_yaml() factory methods.
  • CLI commands: Action (create/list/show/archive), Plan (use/execute/apply/status/list/cancel/diff/artifacts), Skill (add/remove/list/show/tools), Session (create/list/show/delete/tell/export/import), Actor (run/add/remove/list/show with context management), Tool, LSP, Resource, Validation, Config, Invariant, Automation-Profile, Audit, and Cleanup command groups — all with multi-format output support (rich/json/yaml/plain/table/color).
  • Tool runtime: Tool registry with thread-safe operations, tool runner with four-stage lifecycle (discover/activate/execute/deactivate), built-in file tools (read/write/edit/delete/list/search), git tools (status/diff/log/blame), tool call router for multi-provider format normalization (OpenAI/Anthropic/LangChain), and path traversal prevention.
  • Sandbox infrastructure: Sandbox protocol with status transitions, NoSandbox implementation for non-sandboxable resources, git_worktree and copy-on-write sandbox strategies, sandbox factory, thread-safe sandbox manager with plan-scoped tracking, and three merge strategies (git, sequential, JSON deep-merge).
  • Actor system: Actor loader with thread-safe discovery, SHA-256 content-hash caching, namespace normalization, duplicate detection, and tool reference resolution. Actor registry with CRUD operations and built-in generation. Jinja2 YAML template engine with sandboxed rendering. Actor compiler translating GRAPH-type YAML definitions into LangGraph NodeConfig/Edge structures with subgraph resolution, cycle detection, entry/exit validation, and LSP binding metadata (#158 merged 2026-02-24). Actor CLI commands aligned to YAML-first configs with --format support (#288 merged 2026-02-24).
  • Resource system: Resource registry with DAG metadata, handler runtime for git-checkout and fs-directory resource types, resource type schema loader, project-resource linking.
  • Decision system: Decision domain model with 12 decision types, context snapshot capture, influence DAG support, and with_superseded_by() helper for frozen model mutation.
  • Automation levels: Manual, review-before-apply, and full-automation modes with plan-level overrides, settings resolution, pause/resume, and auto-progression. 8 built-in automation profiles with guard logic.
  • Correction engine: Correction model with revert/append modes, BFS impact analysis, dry-run reporting.
  • Phase reversion: State machine for constrained apply -> back to strategize transitions.
  • Security hardening: All eval()/exec() calls replaced with named operation registries, config security scanner detecting 15 disallowed patterns, AST-based code validation, Jinja2 sandboxed environments, secrets masking and validation.
  • Agent skills discovery: Filesystem scanning for Agent Skills Standard folders (SKILL.md with YAML front-matter), registering discovered skills as tools in ToolRegistry with configurable conflict handling (skip/error/replace), refresh hooks, and CLI integration (#161 merged 2026-02-24).
  • CLI extensions: Plan use command extended with --automation-profile, --invariant (repeatable), --strategy-actor/--execution-actor/--estimation-actor/--invariant-actor flags. Plan status/list and action show commands extended with profile, invariant, and actor override rendering across all output formats (#325 merged 2026-02-24).
  • Apply pipeline with validation gating: Sandbox merge/apply pipeline with conflict resolution (#155 merged 2026-02-25). Validation-gated apply (#176 merged 2026-02-25) with required/informational mode enforcement. Diff review artifacts (#303 merged 2026-02-25). DoD gating enforcement (#178 merged 2026-02-25). Error recovery patterns with CLI hints (#186 merged 2026-02-25).
  • Decision persistence: Decision persistence layer with database tables, repositories, and CRUD operations (#171 merged 2026-02-26, Hamza). Decision domain model, context snapshots, and influence DAG now fully persisted.
  • Changeset persistence: ChangeSet and diff artifact persistence with database migration and repository (#163 merged 2026-02-26, Jeff).
  • Concurrency and resilience: Plan and project concurrency locks with advisory locking (#327 merged 2026-02-25). Plan resume with state recovery and re-execution (#328 merged 2026-02-25). Provider cost controls and fallback routing (#324 merged 2026-02-25).
  • Security hardening (Days 17-18): Template rendering hardened (#319 merged 2026-02-25). Explicit exception handling enforced (#320 merged 2026-02-25). Async resource cleanup and leak prevention (#321 merged 2026-02-26).
  • Actor YAML hierarchy: Extended hierarchical actor YAML schema with namespace inheritance, multi-level includes, and loader improvements (#157 merged 2026-02-26, Aditya).
  • E2E milestone suites: M1 source-code plan lifecycle suite (#156), M2 actor + tool source suite (#169), M1/M2 success criteria verification (#402, #403), M3 decision + validation suites (#179, #180, #404), M4 correction + subplan suite (#405) — all merged via Brent QA batches (2026-02-25 and 2026-02-26).
  • Quality automation: Pre-commit hooks (12 hooks across 5 categories), Forgejo CI/CD pipeline with 10 nox-routed jobs, nightly quality monitoring, ADR compliance checking, 97% test coverage enforcement, comprehensive security scanning (Bandit + Semgrep + Vulture), per-scenario temp database isolation for parallel Behave execution (#418 merged 2026-02-24), and CI concurrency groups with job timeouts (#452 merged 2026-02-26).
  • MCP adapter runtime: Live MCP server connection for external tool discovery and invocation (#434 merged 2026-02-27, Aditya). Agent skills loader with filesystem scanning for SKILL.md folders (#453 merged 2026-02-27, Aditya). MCP refresh hooks for dynamic tool updates (#455 merged 2026-02-27, Aditya). Skill CLI tools and refresh commands (#454 merged 2026-02-27, Aditya). Skill persistence with flattened tool sets (#460 merged 2026-02-27, Jeff). M2 critical path fully resolved.
  • Decision service wiring: Decision services wired into DI container for runtime use (#461 merged 2026-02-27, Jeff).
  • Sandbox checkpoint hooks: Checkpoint and rollback hook infrastructure for plan execution safety (#462 merged 2026-02-28, Jeff).
  • Security hardening (Days 19-20): Read-only action enforcement (#436 merged 2026-02-26, Hamza). Async resource cleanup and leak prevention improvements (#435 merged 2026-02-26, Hamza).
  • Provider cleanup: FakeListLLM defaults removed (#459 merged 2026-02-27, Jeff). M1 fully closed.
  • Coverage improvements: Behave BDD scenarios added for 9 under-covered modules (#468 merged 2026-02-27), improving overall test coverage.
  • M6 E2E suite: Firefox-scale autonomous porting verification suite merged (#457 merged 2026-02-27, Brent).
  • SafetyProfile specification: SafetyProfile recognized as composed sub-model of AutomationProfile in spec docs (#471/#472 merged 2026-02-28).
  • Subplan execute and merge: Subplan execution scheduler with sequential/parallel/dependency_ordered modes and merge strategies (git three-way, sequential apply, fail on conflict, last wins) merged (#184/PR #444 merged 2026-03-01, Luis). M4 feature-complete.
  • Config service: Multi-level configuration resolution with project-scoped overrides (#258/PR #474 merged 2026-03-01, Jeff).
  • Autonomy guardrails: Autonomy guardrails (max steps, tool budget, required confirmations) with audit trail persistence (#204 merged 2026-02-28, Luis).
  • Semantic validation: Semantic validation hooks during strategize/execute with syntax, import, and reference checks for Python (#207 merged 2026-02-28, Luis).
  • Permission system: Permission checks for resource access and tool invocation (merged 2026-03-01, Jeff).
  • Test suite performance: 90%+ reduction in test runtime (#479-#483/PR #493 merged 2026-03-02, Jeff): BDD unit tests 26min→2min (92%), coverage report 75min→5min (93%), coverage improved to 98%. Slipcover bytecode instrumentation replaces coverage.py, shared template DB eliminates per-scenario migration overhead, in-process parallelism replaces subprocess spawning.
  • Coverage improvements (Day 21): Behave BDD tests for 8 under-covered modules (#475 merged 2026-03-01).
  • Devcontainer integration: Devcontainer resource type and resource type single inheritance added to specification (#491/PR #492 merged 2026-03-01).
  • Integration batch (Day 22): 6 features merged in a single integration batch PR #508 (2026-03-02, Jeff): CRP protocol models (#190/PR #505), subplan service (#197/PR #506), project-scoped config overrides (#259/PR #504), server client stubs (#201/PR #507), test consolidation (#485/PR #502 — 339→223 features, 141→25 small files), ASV test runtime benchmarks (#486/PR #503 — 144 benchmark files).
  • Spec-gap issues created (Day 22): Devcontainer resource type (#511), execution environment routing (#512), resource type inheritance (#513), devcontainer lifecycle (#514), container tool execution (#515) — covering ADR-042, ADR-043, and execution environment routing from specification.
  • Decision recording merged (Day 23): Decision recording during strategize/execute (#172, PR #433) merged after rebase (Hamza). M3 feature work complete.
  • Plan explain CLI merged (Day 24): Plan tree and explain CLI commands (#174, PR #464) merged (Hamza). Decision tree visualization now operational.
  • Bug triage (Day 24): 3 bugs (#522-#524) triaged with proper CONTRIBUTING.md format, assigned to Jeff for fixes, test issues #536/#537 created and assigned to Brent.
  • Bookkeeping cleanup (Day 24): 7 issues (#190, #194, #201, #208, #498, #499, #501) updated to State/Completed (code merged but Forgejo dependency API prevents formal closure). 8 duplicate PRs (#463, #516, #517, #521, #527, #528, #529) closed.
  • Spec-gap analysis (Day 24): Thorough comparison of 44,396-line specification against codebase and issues identified 30 untracked work items across 14 spec areas. 15 new issues created (#538-#552): ACMS pipeline components (#538-#541, #544, #545), influence DAG traversal (#542), tool wrapping runtime (#543), semantic escalation (#546), cross-plan correction cascading (#547), sandbox boundary algebra (#548), invariant reconciliation actor (#549), output rendering framework (#550), UKO analyzers (#551), extensibility scope chain (#552).
  • Spec-gap burst (Day 24-25): Jeff resolved 6 of 15 spec-gap issues in a single session: influence DAG traversal (#542), tool wrapping runtime with sandboxed transforms (#543), semantic escalation with confidence scoring (#546), cross-plan correction cascading with 4 child-plan states (#547), sandbox boundary algebra with domain computation (#548), invariant reconciliation actor with 4-scope precedence (#549). Each includes full Behave BDD, Robot integration, and ASV benchmark suites.
  • ACMS v1 context pipeline (Day 25): Hamza's ACMS v1 10-component context assembly pipeline (#188, PR #465) merged to master — pluggable pipeline with relevance/recency/tiered strategies, DI-based injection, budget allocation, and frozen Pydantic v2 models.
  • Async command execution (Day 24): Luis merged async job infrastructure (#312) with ThreadPoolExecutor workers, cancellation tokens, health monitoring, stuck job detection, and SQLAlchemy persistence. Specification reconciliation note addresses "No Plan Queuing" clause tension.
  • Safety profile enforcement (Day 23): Luis merged safety profile resolution and enforcement (#345) with plan > action > project > global precedence, unsafe tool gating, skill category allow-lists, and checkpoint requirement composition.
  • LLM observability (Day 24): Jeff merged LLM trace model and operational metrics (#500) with 14 metric keys, database persistence, and optional LangSmith forwarding.
  • Large-project features (Day 24): Jeff merged large-project decomposition (#205) with 4+ level hierarchical subplans, dependency closure computation, and clustering heuristics. Multi-project subplan support (#199) merged with cross-project dependency tracking.
  • Bug triage (Day 25): Brent identified 6 bugs through systematic testing: DI container missing db provider (#554, #570), project persistence not committed (#589, #590), actor list validation error (#592), plus earlier init/resource bugs (#522-#524). Root cause analyses posted and 9 TDD PRs opened.
  • Spec-gap features (late Day 25): Jeff completed 7 additional spec-gap features: ContextFragment data model (#538), pipeline orchestrator + Phase 1 (#539 — ConfidenceWeightedSelector, ProportionalBudgetAllocator, ParallelStrategyExecutor, CircuitBreaker), Phase 2 components (#540 — ContentHashDeduplicator, MaxDepthResolver, WeightedCompositeScorer, GreedyKnapsackPacker), context strategies batch 1 (#541 — SimpleKeyword, SemanticEmbedding, BreadthDepthNavigator), depth/breadth projection (#544 — ProjectionSpec, DepthBreadthProjector, PlanContextInheritance), UKO analyzer framework (#551 — AnalyzerProtocol, PythonAnalyzer, MarkdownAnalyzer), ContextFragment model unification (#569 — CRP base type inheritance).
  • M3 acceptance gate merged (late Day 25): Rui's M3 E2E validation (#494, PR #559) merged with all 10 acceptance criteria verified, timeout fixes, and pre-existing test fix.
  • ACMS strategy work merged (Day 26): Hamza merged ACMS strategy registry (#191, PR #565 — 6 built-in stub strategies, plugin discovery, per-strategy config) and scoped backend view (#193, PR #607 — ResourceScope, ScopedBackendView, scope resolution, tier integration). M5 ACMS critical path substantially resolved.
  • M4 acceptance gate merged (Day 26): Rui's M4 E2E validation (#495, PR #560) merged with all 7 acceptance criteria verified, 3 new CLI integration tests, and pre-existing unit test fix.
  • Event bus merged (Day 26): Aditya's domain event infrastructure (#509) merged — RxPy-based reactive event bus.
  • Subplan tool merged (Day 26): Aditya's plan_subplan tool with decision emission (#198, PR #463) merged.
  • LSP server stub merged (late Day 25): Luis's LSP server stub (#203) with JSON-RPC stdin/stdout transport, initialize/shutdown/exit handshake, CLI command, and 21+ BDD scenarios.
  • UKO Layer 1 domain ontologies merged (late Day 26): Hamza's UKO Layer 1 (#574, PR #617) merged with 4 domain ontologies (uko-code, uko-doc, uko-data, uko-infra), Python ontology registry with DomainDescriptor + Turtle validation, DetailLevelMap presets for all 4 domains, 31 BDD scenarios, 6 Robot integration tests, and updated Layer 0 node counts.
  • Domain analyzers merged (Day 26): Hamza's ACMS domain-specific analyzer implementations (#588, PR #611) merged — Python, Markdown, PostgreSQL, Docker analyzers with the analyzer plugin framework.

What Remains To Be Done

The majority of the specification's domain models, services, CLI commands, and infrastructure modules are now implemented. M1, M2, and M4 are fully complete (feature-wise). M3 is feature-complete with bugs and E2E validation remaining. A thorough spec-gap analysis on Day 24 identified 30 missing work items across 14 specification areas, resulting in 15 new issues. The following areas still require completion:

  • ACMS remaining components (M5): Strategy registry (#191) and scoped backend view (#193) merged Day 26 (Hamza). Pipeline orchestrator (#539), Phase 2 (#540), context strategies (#541), depth/breadth projection (#544), ContextFragment model (#538), UKO analyzers (#551), model unification (#569) all merged late Day 25 (Jeff). Remaining: repo indexing (#195, Hamza — PR #610 in review, P0 blocker: missing migration), strategy coordinator (#192, Jeff — Verified), M5 E2E validation (#496, Rui — In Progress). UKO Indexer (PR #612 in review with 43 findings).
  • Decision framework gaps — RESOLVED: All merged (influence DAG #542, cross-plan correction #547, tool wrapping #543).
  • Autonomy and safety gaps — MOSTLY RESOLVED: All spec-gap items merged. Remaining: output rendering framework (#550, High).
  • Output rendering framework (M6): Full spec-defined reactive rendering (#550, High) — only rich and plain materializers exist; Tree, Progress, Code, Diff, ActionHint handles missing.
  • Phase 3 pipeline + advanced strategies (#545, M6): Medium priority. UKO Layer 1 domain ontologies (PR #617 merged late Day 26, Hamza). UKO Layer 2 paradigm vocabs (#575) and Layer 3 technology vocabs (#576) still open.
  • Extensibility (v3.6.0): Pluggable component scope chain resolution (#552, Medium) — plan > project > global override chain for all 27 extension points.
  • Bug fixes (v3.2.0, v3.3.0): 11 bugs total — original 3 (#522-#524: init/resource bootstrap), 3 DI/persistence (#554/#570: session DI, #589/#590: project persistence), actor validation (#592), plan correct tree wiring (#606), M4 race condition (#563), plus 2 new Day 27 bugs (#620/#621: skill/tool add not registering). Bug-fix PRs (#591, #593, #594) ready for merge. TDD PRs (#566, #567, #568, #595, #596) in advanced review. 9 TDD counterpart issues created (#630-#638). TDD infrastructure (#627-#629) needed for CI tag handling.
  • E2E milestone validation: M3 E2E (#494 merged), M4 E2E (#495 merged), M5 E2E (#496, Rui — In Progress), M6 E2E (#497, Brent — In Review).
  • Remaining M6 features: Cost estimation actor (#209, Aditya — Verified), CLI polish (#210, Brent — In Review), retry policies (#313, Luis — PR #614 in review), resource type inheritance (#513, Hamza — PR #618 in review), devcontainer lifecycle (#514, Luis — PR #613 in review, 15 findings), container tool execution (#515, Luis — PR #616, merge conflict).
  • Post-MVP deferred work (v3.6.0): Database resources (#342), cloud infrastructure resources (#343), TUI/Web interface (#341), auth/team commands (#340), remote project support (#338), client stubs (#335-#337), virtual resource types (#329-#334), event bus (#473 merged Day 26).

The following areas are substantially implemented and are no longer blocking:

  • Resource abstraction (types, registry, handlers with git-checkout and fs-directory, DAG metadata, CLI)
  • Sandbox strategies (git_worktree, copy-on-write, no-sandbox, factory, merge)
  • Tool system (runner, registry, built-in file/git/changeset tools, schema validation, lifecycle, router)
  • Security hardening (config scanner, sandboxed Jinja2 templates, input validation, credential redaction, secrets masking, template rendering hardening, exception handling enforcement, async resource cleanup)
  • Apply pipeline (plan_apply_service with validation gating, diff review, merge, changeset capture, DoD enforcement, error recovery patterns)
  • Decision system (12 decision types, context snapshots, influence DAG, frozen model helpers, database persistence)
  • Correction engine (revert/append modes, BFS impact analysis, dry-run reporting)
  • Invariant reconciliation (domain model with scopes, merge with precedence, enforcement service)
  • Subplan orchestration (domain models for config, status, merge strategies, failure handling)
  • Phase reversion (constrained apply -> back to strategize state machine)
  • Checkpointing (CheckpointScope, profile flags, cleanup pruning, integrated throughout)
  • Automation profiles (8 built-in profiles, guard logic, 4-level precedence service, CLI commands)
  • Agent Skills discovery (registry, protocol, built-in skills, SKILL.md schema support)
  • Changeset persistence (database tables, repository, diff artifact storage)
  • Concurrency controls (plan/project advisory locks, plan resume with state recovery)
  • Provider controls (cost controls, fallback routing, rate limiting)
  • LSP integration (stub modules with registry, models, tool adapter — runtime deferred to server mode)
  • Server connectivity stubs (ACP HTTP transport stub, ACP facade, local-mode routing)

Milestone Roadmap

Milestone 1: Minimal Local Source-Code Workflow (Target: Feb 15, ETA: Done)

Goal: A minimally usable local-mode flow where a user can register an action from YAML, link a git repository resource to a project, and run a plan end-to-end (plan use -> plan execute -> plan diff -> plan apply) with a sandboxed workspace and tool-based change capture.

Current status: 100% complete (0 open out of ~152 total M1 issues). Apply pipeline merged (#155). E2E M1 suite merged (#156, #402). Provider cost controls merged (#324). FakeListLLM default removal merged (#459).

Key remaining work: None — milestone complete.

Milestone 2: Actor Compiler + Full LLM Integration (Target: Feb 22, ETA: Done)

Goal: Actor YAML files compile into live LangGraph graphs. Custom actors (strategy, execution, estimation) are fully operational. The tool router normalizes calls across providers, the validation runner enforces resource-attached validations, and the MCP adapter connects to external tool servers.

Current status: 100% complete (0 open out of ~99 total M2 issues). MCP adapter (#434), agent skills loader (#453), skill CLI (#454), MCP refresh hooks (#455), skill persistence (#460) all merged in Days 19-20.

Key remaining work: None — milestone complete.

Milestone 3: Decisions + Validations + Invariants (Target: Feb 26, ETA: ~Mar 9)

Goal: Decisions are recorded during Strategize and Execute phases and persisted to the database. Users can view the decision tree (plan tree), inspect individual decisions (plan explain), manage invariants (invariant add/list/remove), and correct decisions (plan correct --mode revert|append) with selective subtree recomputation.

Current status: Feature-complete (~20 open / 36 total including 9 new TDD issues). M3 E2E acceptance gate (#494, PR #559) merged. 8 bugs with fix PRs and TDD test PRs. PRs #591, #593, #594 ready for merge. 2 new bugs discovered Day 27 (#620, #621).

Key remaining work:

  • Bug: agents init --yes does not exist (#522, TDD PR #566 — final approval from hamza.khyari, needs merge)
  • Bug: agents resource add fs-directory error (#523, TDD PR #567 — all rounds addressed, ready for merge)
  • Bug: agents resource add git-checkout error (#524, TDD PR #568 — merge conflict, needs rebase)
  • Bug: agents session list DI error (#554, TDD #630, TDD PR #596 — all rounds addressed)
  • Bug: agents session create DI error (#570, TDD #631, TDD PR #595 — all rounds addressed)
  • Bug: agents project create not persisted (#589, TDD #632, TDD PR #591 — ready for merge)
  • Bug: agents project show fails after create (#590, TDD #633, TDD PR #593 — ready for merge)
  • Bug: agents actor list validation error (#592, TDD #634, TDD PR #594 — ready for merge)
  • NEW Bug: agents skill add not registering (#620, TDD #637 — needs investigation, assigned freemo)
  • NEW Bug: agents tool add not registering (#621, TDD #638 — needs investigation, assigned freemo)
  • Test issues: #536, #537, #553 (Brent — TDD tests written, linked to bug PRs)

Milestone 4: Corrections + Subplans + Checkpoints (Target: Mar 2, ETA: ~Mar 8)

Goal: Plans can spawn child plans (subplans) during execution. Subplans execute in parallel with configurable concurrency limits. Results are merged back using three-way merge strategies. Correction engine supports revert and append modes. Checkpointing enables rollback to previous plan states.

Current status: Feature-complete (~9 open / 30 total including 2 new TDD issues). M4 E2E acceptance gate (#495, PR #560) merged Day 26. Plan-subplan tool (#198, PR #463) merged Day 26.

Key remaining work:

  • Security & Safety Hardening Epic (#362) — safety profile enforcement (#345) merged Day 23; remaining child issues need verification
  • Bug: plan correct tree wiring (#606, assigned freemo — Priority/Critical, TDD #636 created)
  • Bug: M4 validation race condition (#563, assigned brent.edwards — Priority/Critical, TDD #635 created, PR #619 in review)
  • Formal milestone closure once remaining open issues resolve

Milestone 5: ACMS v1 + Context Scaling (Target: Mar 6, ETA: ~Mar 9-10)

Goal: The Advanced Context Management System v1 is operational. Projects with 10,000+ files can be indexed and queried. The context assembly pipeline produces scoped, budget-constrained context views for actors. Hot/warm/cold storage tiers manage context lifecycle.

Current status: ~71% complete (~14 open / 38 total including 3 TDD infra issues). Major progress: Hamza's strategy registry (#191) and scoped backend view (#193) merged Day 26. Jeff completed 7 spec-gap features on late Day 25 (#538, #539, #540, #541, #544, #551, #569). Subplan tool (#198) merged Day 26. Most of the ACMS v1 pipeline is now operational.

Key remaining work:

  • ACMS components (Hamza): Repo indexing (#195 — PR #610 in review, has P0 blocker: missing Alembic migration). UKO Indexer (PR #612 in review with 43 review findings, no author response yet).
  • Strategy coordinator (#192, Jeff — Verified): Needs implementation.
  • M5 E2E validation (#496, Rui — In Progress): Acceptance gate testing.
  • TDD infrastructure (Brent): Behave tag handler (#627), Robot tag handler (#628), CI quality gate (#629) — blocking dependencies for all TDD counterpart issues.
  • Open spec-gap items: Phase 3 + advanced strategies (#545 — moved to M6).

Milestone 6: Autonomy Hardening + Server Stubs (Target: Mar 10, ETA: ~Mar 14)

Goal: The system can autonomously execute a large-scale task (e.g., porting a substantial codebase) using hierarchical plan decomposition with 4+ levels of subplans, decision correction with selective subtree recomputation, parallel execution scaling to 10+ concurrent subplans, and validation-gated apply. Client-side server stubs are in place for future connectivity.

Current status: ~65% complete (~15 open / 42 total). LSP server stub (#203) merged (Luis). Event bus (#509) merged (Aditya). UKO Layer 1 domain ontologies (#574, PR #617) merged late Day 26 (Hamza). Domain analyzers (#588, PR #611) merged Day 26 (Hamza). 5 new PRs opened today; 2 already merged. Remaining in review: retry policies (PR #614, Luis — mergeable, no reviews), temporal data model (PR #615, Hamza — merge conflict), resource type inheritance (PR #618, Hamza — merge conflict).

Key remaining work:

  • Spec gaps remaining: Output rendering framework (#550, High), Phase 3 pipeline + advanced strategies (#545, Medium)
  • Original M6 issues: Cost estimation actor (#209, Aditya — Verified), CLI polish (#210, Brent — In Review), retry policies (#313, Luis — PR #614 in review), resource type inheritance (#513, Hamza — PR #618 in review), devcontainer lifecycle (#514, Luis — PR #613 in review with 15+ findings), container tool execution (#515, Luis — PR #616, merge conflict)
  • New M6 items: UKO Layer 1 domain ontologies (PR #617, Hamza — merged late Day 26), temporal data model (PR #615, Hamza — merge conflict, needs rebase), domain analyzers (PR #611, Hamza — merged Day 26)
  • Large project autonomy: Epic #369 at ~70% (decomposition, subplans, context strategies all merged; remaining: repo indexing from M5 feeds into this)
  • Testing: M6 E2E validation (#497, Brent — In Review)

Beyond Day 38: Extended Roadmap

Server Connectivity — Client Side (~Days 39-43)

Client-side infrastructure for connecting to a future CleverAgents server. The server is a separate project; this work covers only the client stubs and interfaces.

  • HTTP client infrastructure for server communication
  • Plan sync client (push/pull plan state to server)
  • WebSocket client for real-time event streaming
  • Remote project support (request server-side execution)

Full Feature Polish (~Days 44-48)

Final refinements to achieve the complete specification:

  • Automation profile refinements (all eight built-in profiles fully operational)
  • Cost/risk estimation actor integration
  • Checkpoint and rollback hardening
  • LSP integration stubs for future IDE plugin support
  • Performance tuning and benchmark validation across all subsystems
  • Comprehensive documentation and release candidate preparation

Schedule Risk Summary

The project is running approximately 4-5 days behind the original aggressive schedule, steady since Day 25. The gap is stable — not narrowing, not widening. The primary constraint remains merge throughput — 13 open PRs with extensive multi-round review cycles. 5 PRs have merge conflicts. Bug debt is decreasing: 4 Critical bugs fixed Days 28-29 by Jeff (#523, #524, #620, #621), plus #606 fix merged. Issues #606, #636, #553 all closed Day 29.

Day 29 status: (a) Jeff merged 7 PRs in Days 28-29 (4 bug fixes + 3 M5 features); (b) M3 bugs reduced from 11 to 7 (PRs #591, #593, #594 ready to merge would reduce to 4); (c) Issues #606 (M4 bug), #636 (TDD test), #553 (git-checkout TDD) all CLOSED; (d) M5 accelerated with 3 new features (prompt injection, guardrails, predictive error prevention); (e) Both Hamza and Luis responded to review escalations (Hamza: 48/51 findings fixed on PR #610; Luis: F25-F31 resolved on PR #613); (f) Major workload rebalancing executed: Brent 55→30 SP, Luis gained TDD infra + 2 feature issues, Rui gained bug #647 + TDD #628 + #635 + #550 (17 SP), Aditya gained TDD #648 + 4 new estimation issues (28 SP); (g) TDD infrastructure (#627-#629) moved from v3.4.0 to v3.2.0 and assigned to Luis/Rui — unblocks all 5 bug fixes; (h) PR #528 dispute resolved (Aditya's estimation actor is the implementation of #209, not a duplicate); (i) 4 new spec-gap issues created (#649-#652) for estimation domain. M5 ETA ~Mar 10 (+4d from target). M6 tracking ~4 days behind (ETA ~Mar 14).

Spec gap analysis (Day 26): Systematic comparison of all 44,396-line specification sections against open and closed issues found no major coverage gaps. All spec areas (safety profiles, LSP stubs, ACP facade, review playbooks, performance tests) have corresponding closed issues. The existing open issues cover all remaining spec work.

!!! note "Server Mode"

Server mode implementation is explicitly deferred. The 30-day local-mode target focuses on a fully functional standalone client. Server connectivity is scoped as client-side stubs only — the server itself will be developed as a separate project. This boundary is enforced by the ACP (Agent Client Protocol) abstraction: in local mode, ACP maps to in-process service calls; adding server transport later requires no changes to core logic.

Team Roles and Assignments

Developer Role Primary Focus Areas Notes
Jeff (freemo) CTO/Lead Architect M5: strategy coordinator (#192); M6+: remaining spec-gap items 107/129 issues (83%). Merged 7 PRs Days 28-29 (4 bug fixes + 3 M5 features). Bugs #523, #524, #620, #621, #606 all FIXED. Issues #606, #636, #553 closed Day 29. High velocity.
Luis (CoreRasurae) Senior Python Architect NEW: TDD infra (#627 Behave, #629 quality gate); M3: #581 AuditService, #573 secret masking; M6: retry policies (#313, PR #614), devcontainer (#514, PR #613), container exec (#515, PR #616) Responded Day 29 on PR #613 (F25-F31 resolved). Now has 12+ issues / 59+ SP. TDD infra is top priority — unblocks all bug fixes.
Aditya (aditya) Domain Expert (Agents/LLMs) NEW: #648 TDD test, #649-#652 estimation domain (26 SP); M6: cost estimation (#209, PR #528) 6 issues / 34 SP (up from 1/8). PR #528 dispute resolved — is valid implementation of #209. Estimation domain spec gaps filled with 4 new issues.
Hamza (hamza.khyari) Python/RDF Expert M5: repo indexing (#195, PR #610), UKO Indexer (PR #612); M6: temporal data (#615), resource inheritance (#513, PR #618) Responded Day 29 on PR #610 (48/51 findings fixed). Still needs rebase on 4 PRs. 71 SP across 10 issues. RDF/ACMS work is specialized — no backup.
Rui (hurui200320) Fast Developer NEW: #647 bug fix (CRITICAL), #628 Robot TDD infra, #635 TDD test, #550 output rendering; M3 re-verification (#494); M5 E2E (#496) 7 issues / 20 SP (up from 3/3). Bug #647 is top priority. TDD infra #628 unblocks Robot-side bug workflow.
Brent (brent.edwards) Quality Specialist M3 bug-fix PRs (#594, #595, #596), TDD tests (#630, #631, #634), M4 race condition (#619), M6 BDD coverage (#645), M6 CLI polish (#210), M6 E2E (#497) Rebalanced: 10 issues / ~30 SP (down from 15/55). Offloaded TDD infra (#627-#629), #635, #550 to Luis/Rui. Focused on active branch work only.
Mike (mngrif) / Brian (brian) Sysadmins Deployment, infrastructure setup, CI/CD Minimal coding tasks

Weekly Development Schedules

Week 1 (Days 1-7) - MVP Target (Source Code Only)

Day Morning Focus Owner Afternoon Focus Owner
1 A5.alpha + A5.action_arguments DB migrations + ORM models Hamza + Luis B1.core Project/Resource models Hamza
2 A5.gamma repos/services + A5.tests + B3.cleanup (legacy project CLI) Jeff + Brent (tests) B2.persistence/B2.service + B3.cli Resource CLI Hamza + Brent (tests)
3 B4.sandbox git_worktree Jeff + Hamza B4.sandbox manager + tests Luis + Brent (tests)
4 C1.schema/C1.examples Actor YAML Aditya C2.loader/C2.compiler + C2.legacy v2 removal Aditya + Jeff
5 C3.protocol/C3.context/C3.inline Skill framework Jeff C4.file/C4.search Built-in skills Luis + Jeff
6 C7.mcp MCP Adapter Aditya + Jeff C4.git + C5.model/C5.router Change tracking Luis + Jeff
7 C5.diff Diff review artifacts Luis C6.pipeline/C6.gating Validation pipeline Luis + Brent (tests)

Week 2 (Days 8-14) - M3 Complete + Plan-Actor Integration

Day Focus Owner Deliverable
8 C8.providers + C9.execute Plan-Actor integration Jeff + Aditya (+Luis support) Execute phase + providers ready
9 C9.apply Apply Phase + Review Jeff + Luis Apply flow ready with review gates
10 D1.domain Decision Model Hamza (+Jeff review) Decision model committed
11 D2.service Decision Recording Hamza (+Jeff review) Decision recording committed
12 E1.domain Subplan Model Luis (+Jeff review) Subplan domain committed
13 E2.service/E2.actor Subplan spawning Jeff + Aditya (+Luis support) Subplan spawn committed
14 End-to-end integration testing All + Brent (tests/QA) M3 milestone verified

Week 3 (Days 15-21) - M4 Target (Decision Tree + Correction)

Day Focus Owner Deliverable
15 D5.db/D5.repo Decision persistence Hamza (+Jeff review) Decision storage wired
16 D3.cli Decision viewing Hamza (+Jeff review) plan tree, plan explain
17 D4.revert Decision correction (revert) Jeff (+Luis support) plan correct revert flow
18 D4.append + D5.di Decision wiring Jeff + Hamza (+Luis support) Append correction + service wiring
19 E3.exec Parallel Subplan Execution Luis (+Jeff review) Concurrent subplans
20 E4.merge Result Merging Jeff (+Luis support) Git-style merge for subplans
21 M4 integration testing All + Rui (tests) + Brent (QA) Decision correction working

Week 4 (Days 22-30) - M6 Target (Large Project Autonomy - LOCAL MODE ONLY)

Day Focus Owner Deliverable
22-23 CTX1.index Context indexing + G3.semantic Hamza + Luis Large codebase indexing + semantic validation
24-25 G4.context Hot/Warm/Cold tiers + G2.checkpoint Hamza + Luis Three-tier memory + checkpointing
26-27 G1.decompose + G5.estimate Jeff + Hamza Autonomous decomposition + estimation
28 F0.stubs Luis Client stubs (NOT server impl)
29 M6 perf triage + large project tests All + Rui (tests) + Brent (QA) 10K file perf target
30 M6 integration testing All + Rui (tests) + Brent (QA) Large project autonomy verified (Server connectivity DEFERRED)

Note

: Server connectivity (F1-F4) is DEFERRED beyond Day 30. Days 26-29 focus on client stubs only and large project testing. The server is a separate project.

Continuous Tasks (Throughout)

Brent (Quality - Independent, Low Contention):

  • Review all PRs within 4 hours of submission
  • Run nox -s typecheck on all branches before merge
  • Run nox -s lint and ensure 0 warnings
  • Monitor test coverage (must stay >=97%)
  • Update documentation for API changes
  • Security audit: no eval(), no template injection, no secrets in code

Rui (Testing - Parallel with Feature Work):

  • Unavailable 2026-02-13 to 2026-02-27; Brent owns M1/M2 testing during this window
  • Write Behave scenarios for each feature (before implementation starts) after return
  • Write Robot integration tests for each milestone after return
  • Run full test suite daily once back on rotation
  • Report test failures immediately
  • Maintain test fixtures and mocks in features/

Risk Mitigation

Risk Mitigation Owner
Apply pipeline completion (#155) RESOLVED — merged Day 18 Luis
MCP adapter + agent skills merge RESOLVED — all merged Days 19-20 Aditya
M4 subplan execution (#184) RESOLVED — merged Day 21 (PR #444) Luis
Autonomy guardrails + semantic validation RESOLVED — #204 and #207 merged Days 20-21 Luis
M3 decision recording + plan explain RESOLVED — both PRs (#433, #464) merged Days 23-24 Hamza
M5 ACMS v1 pipeline RESOLVED — ACMS pipeline (#188) merged Day 25 Hamza
Hamza merge conflicts (M3 PRs) RESOLVED — #433 and #464 both merged Hamza
M5 remaining ACMS strategy work RESOLVED — strategy registry (#191) and scoped view (#193) merged Day 26 Hamza
v3.2.0 bug fixes (7 remaining) Down from 11 to 7. Jeff fixed #523, #524, #620, #621 Days 28-29. #553 (TDD) closed Day 29. PRs #591, #593, #594 ready for merge (would close #589, #590, #592). M3 re-verification planned Mar 10-11. Jeff (fixes) + Brent (tests) + Rui (re-verify)
M3/M4 acceptance gate PRs need rebase RESOLVED — PRs #559 and #560 both merged (Rui) Rui
39 unassigned issues RESOLVED — triage and assignment completed (Day 26-27 planning sessions) Planning agent
Merge throughput bottleneck 12 open PRs. Day 29 evening: PM comments on all PRs with action items. PRs #594, #595, #596 ready pending re-approval. PR #528 (estimation) dispute resolved, assigned to Aditya. All reviewers
Hamza review feedback backlog PR #610: Hamza responded Day 29 (48/51 findings fixed). Brent re-reviewing. PR #612 partial fix. 4 PRs with merge conflicts — rebase needed. Hamza (improved)
Luis unresponsiveness RESOLVED Day 29 — Luis responded on PR #613 (F25-F31 fixed). Now assigned TDD infra (#627, #629) as priority work. Luis
5 PRs with merge conflicts #618 (Hamza), #616 (Luis), #615 (Hamza), #612 (Hamza), #610 (Hamza) — need rebase. All authors notified Day 29. PR authors
Brent bottleneck (RESOLVED) Day 29 rebalancing: Brent reduced from 15 issues / 55 SP to 10 issues / ~30 SP. TDD infra offloaded to Luis (#627, #629) and Rui (#628). Bug #647 and #550 offloaded to Rui. #635 offloaded to Rui. PM rebalancing
TDD infrastructure unowned (RESOLVED) Day 29: #627 assigned to Luis, #628 to Rui, #629 to Luis. All moved from v3.4.0 to v3.2.0 and verified. Dependency links created. Unblocks all 5 bug fixes. Luis + Rui
New Critical bugs (#620, #621) RESOLVED — Jeff fixed both Days 28-29 (PRs #640, #641). Root cause: missing session.commit() in repositories. Jeff
Large codebase performance Profile ACMS indexing + hot/warm/cold tiers; enforce bounded memory tests Jeff + Hamza
Server connectivity stubs RESOLVED — server client stubs (#201) merged in integration batch Mar 2 Jeff

Schedule Adherence History

Each schedule update entry must include: timeline reference, summary, milestone forecast, track forecast, developer forecast, and a task inventory table (milestone x developer breakdown).

Timeline reference

  • Day 7/M1 = 2026-02-15
  • Day 10/M2 = 2026-02-18
  • Day 14/M3 = 2026-02-22
  • Day 21/M4 = 2026-03-01
  • Day 25/M5 = 2026-03-05
  • Day 30/M6 = 2026-03-10

2026-02-12 (Day 4)

Summary

Status: Behind ~8-10d
Deadline risk: HIGH

Notes

  • Action/plan model alignment done
  • persistence wiring, CLI rebaseline, resource registry, and tool runtime missing.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-22 +7d HIGH
M2 (v3.1.0) (2026-02-18) -> ETA 2026-02-25 +7d HIGH
M3 (v3.2.0) (2026-02-22) -> ETA 2026-03-01 +7d HIGH
M4 (v3.3.0) (2026-03-01) -> ETA 2026-03-07 +6d MED-HIGH
M5 (v3.4.0) (2026-03-05) -> ETA 2026-03-10 +5d MEDIUM
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-15 +5d MEDIUM

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle + persistence) behind ~8-10d ETA 2026-02-22 HIGH repository wiring + CLI rebaseline
Track B (Projects/resources + sandbox) behind ~9-11d ETA 2026-02-25 HIGH resource registry + git_worktree integration
Track C (Actors/tools/skills/validations) behind ~9-11d ETA 2026-03-01 HIGH tool/validation registry + actor YAML runtime
Track D (Change tracking + apply pipeline) behind ~8-10d ETA 2026-02-25 HIGH ChangeSet capture + apply gating
Track Q (Quality automation) +2d ahead ETA 2026-02-15 LOW maintenance only
Track T (Testing) -3d behind (Rui out) ETA 2026-02-27+ HIGH QA load on Brent + feature owners

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff 0d (on schedule) available HIGH lifecycle persistence + tool runtime + CLI rebaseline
Luis 0d (on schedule) available MEDIUM repositories + apply pipeline
Hamza 0d (on schedule) available HIGH resource registry + sandbox strategies
Aditya 0d (on schedule) available MEDIUM actor/skill/tool YAML configs + hierarchical graphs
Brent +1d ahead (Q0 quality gates completed early) available MED-HIGH test coverage + integration stability
Rui 0d (on schedule) available through tomorrow HIGH tests deferred until return
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Task inventory was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-13 (Day 5)

Summary

Status: Behind ~7-9d
Deadline risk: HIGH

Notes

  • Spec-aligned action/plan models + migrations landed
  • resource/project domain models present
  • persistence wiring, CLI rebaseline, tool runtime, and apply pipeline still missing.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-20 +5d HIGH
M2 (v3.1.0) (2026-02-18) -> ETA 2026-02-24 +6d HIGH
M3 (v3.2.0) (2026-02-22) -> ETA 2026-03-01 +7d HIGH
M4 (v3.3.0) (2026-03-01) -> ETA 2026-03-07 +6d MED-HIGH
M5 (v3.4.0) (2026-03-05) -> ETA 2026-03-10 +5d MEDIUM
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-15 +5d MEDIUM

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle + persistence) behind ~6-8d ETA 2026-02-20 HIGH repo wiring + CLI rebaseline + legacy removal
Track B (Projects/resources + sandbox) behind ~7-9d ETA 2026-02-24 HIGH resource registry + git_worktree integration
Track C (Actors/tools/skills/validations) behind ~8-10d ETA 2026-03-01 HIGH tool/validation registry + actor YAML runtime
Track D (Change tracking + apply pipeline) behind ~7-9d ETA 2026-02-24 HIGH ChangeSet capture + apply gating
Track Q (Quality automation) +2d ahead ETA 2026-02-15 LOW maintenance only
Track T (Testing) -3d behind (Rui out) ETA 2026-02-27+ HIGH QA load on Brent + feature owners

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff 0d (on schedule; model alignment on track) available HIGH lifecycle persistence + tool runtime + CLI rebaseline
Luis 0d (on schedule; plan model prep) available MEDIUM repositories + apply pipeline
Hamza 0d (on schedule; sandbox work progressing) available HIGH resource registry + sandbox strategies + RDF groundwork
Aditya +1d ahead (A2b.gamma action YAML schema completed early) available MEDIUM actor/skill/tool YAML configs + hierarchical graphs
Brent +1d ahead (Q0 done + CI bugfixes clearing pipeline) available MED-HIGH test coverage + integration stability
Rui N/A (unavailable starting today) unavailable 2026-02-13 to 2026-02-27 HIGH test backlog resumes after 2026-02-27
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Task inventory was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-14 (Day 6)

Summary

Status: Behind ~5-7d
Deadline risk: HIGH

Notes

  • Tool runtime + file tools + sandbox strategies landed
  • resource registry tables done
  • M1 blocked by plan phase rebaseline, persistence wiring, resource/project CLI, and apply pipeline/validation gate.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-21 +6d HIGH
M2 (v3.1.0) (2026-02-18) -> ETA 2026-02-25 +7d HIGH
M3 (v3.2.0) (2026-02-22) -> ETA 2026-03-03 +9d HIGH
M4 (v3.3.0) (2026-03-01) -> ETA 2026-03-10 +9d MED-HIGH
M5 (v3.4.0) (2026-03-05) -> ETA 2026-03-13 +8d MEDIUM
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-14 +4d MED-HIGH

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle + persistence) behind ~5-7d ETA 2026-02-21 HIGH plan phase rebaseline + persistence wiring
Track B (Projects/resources + sandbox) behind ~5-7d ETA 2026-02-21 HIGH resource type model + project/resource repos + CLI
Track C (Actors/tools/skills/validations) behind ~7-9d ETA 2026-03-03 HIGH tool registry persistence + actor YAML compiler + validation attachments
Track D (Change tracking + apply pipeline) behind ~5-7d ETA 2026-02-22 HIGH ChangeSet + apply pipeline + execute/apply wiring
Track Q (Quality automation) +2d ahead ETA 2026-02-15 LOW maintenance only
Track T (Testing) -3d behind (Rui out) ETA 2026-02-27+ HIGH QA load on Brent + feature owners

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +1d ahead (tool runtime + file tools landed early on C-track; plan rebaseline pending on A-track; net slight ahead) available HIGH plan phase rebaseline + persistence + resource/project CLI + execute/apply wiring
Luis -1d behind (repository wiring not yet complete) available MED-HIGH repositories + apply pipeline + service wiring
Hamza 0d (on schedule; sandbox strategies complete, resource types in progress) available MEDIUM resource types + project DB + RDF groundwork
Aditya +1d ahead (schema work progressing ahead of plan) available MEDIUM actor/skill/tool YAML configs + hierarchical graphs + MCP configs
Brent +1d ahead (QA gates solid, expanding coverage ahead of schedule) available MED-HIGH test coverage + integration stability
Rui N/A (unavailable) unavailable 2026-02-13 to 2026-02-27 HIGH test backlog resumes after 2026-02-27
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Task inventory was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-17 (Day 9)

Summary

Status: Behind ~3-4d
Deadline risk: HIGH

Notes

  • Action/plan persistence + resource/project registry largely landed
  • apply pipeline, validation gating, and actor YAML pipeline still missing.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-20 +5d HIGH
M2 (v3.1.0) (2026-02-18) -> ETA 2026-02-24 +6d HIGH
M3 (v3.2.0) (2026-02-22) -> ETA 2026-02-27 +5d HIGH
M4 (v3.3.0) (2026-03-01) -> ETA 2026-03-04 +3d MED-HIGH
M5 (v3.4.0) (2026-03-05) -> ETA 2026-03-06 +1d MEDIUM
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-12 +2d MEDIUM

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle + persistence) behind ~2-3d ETA 2026-02-20 MED-HIGH execute/apply integration + CLI/Robot tests
Track B (Projects/resources + sandbox) behind ~3-4d ETA 2026-02-24 MED-HIGH resource tree/inspect + handlers/auto-discovery
Track C (Actors/tools/skills/validations) behind ~6-7d ETA 2026-02-27 HIGH actor YAML compiler + tool/validation CLI + registry persistence
Track D (Change tracking + apply pipeline) behind ~4-5d ETA 2026-02-24 HIGH ChangeSet capture + validation gating + diff review
Track Q (Quality automation) +3d ahead ETA 2026-02-18 LOW maintenance only
Track T (Testing) -3d behind (Rui out) ETA 2026-02-27+ HIGH QA load on Brent + feature owners

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff -1d behind (4/7 due tasks done; A5.delta +2d, B0.repo tasks +3d pending; offset by A5.epsilon/zeta done early) available HIGH apply pipeline + tool/validation CLI + actor compiler
Luis -2d behind (0/2 due tasks done; D0.beta +3d, PROV1 +2d — apply pipeline not started) available MED-HIGH apply pipeline + validation runner + decision/invariant wiring
Hamza 0d (on schedule; no COMMIT tasks due yet; resource/sandbox foundation work progressing) available MEDIUM resource handlers + DAG CLI + UKO/RDF groundwork
Aditya +3d ahead (C1.schema done Day 9, planned Day 12 — well ahead) available MEDIUM actor/skill YAML configs + MCP adapter + hierarchical graphs
Brent +2d ahead (A4b.tests on time; A5.tests done 2d early; A7.domain.tests done 4d early) available MED-HIGH coverage + integration stability + CLI/persistence tests
Rui N/A (unavailable) unavailable 2026-02-13 to 2026-02-27 HIGH test backlog resumes after 2026-02-27
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Task inventory was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-18 (Day 10)

Summary

Status: Behind ~3-4d
Deadline risk: HIGH

Notes

  • M1 blocked by apply pipeline + validation gating + M1 CLI/persistence tests
  • resource/project registries and tool runtime are done, actor/skill schema work in progress.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-20 +5d HIGH
M2 (v3.1.0) (2026-02-18) -> ETA 2026-02-24 +6d HIGH
M3 (v3.2.0) (2026-02-22) -> ETA 2026-02-27 +5d HIGH
M4 (v3.3.0) (2026-03-01) -> ETA 2026-03-04 +3d MED-HIGH
M5 (v3.4.0) (2026-03-05) -> ETA 2026-03-06 +1d MEDIUM
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-10 +0d MED-HIGH

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle + persistence) behind ~2-3d ETA 2026-02-20 MED-HIGH apply pipeline wiring + CLI/persistence tests
Track B (Projects/resources + sandbox) behind ~3-4d ETA 2026-02-24 MED-HIGH resource tree/inspect + handlers/auto-discovery
Track C (Actors/tools/skills/validations) behind ~5-6d ETA 2026-02-27 HIGH actor compiler + tool/validation CLI + MCP/Agent Skills adapters
Track D (Change tracking + apply pipeline) behind ~4-5d ETA 2026-02-24 HIGH apply pipeline + validation gating + diff review
Track Q (Quality automation) +3d ahead ETA 2026-02-18 LOW maintenance only
Track T (Testing) -3d behind (Rui out) ETA 2026-02-27+ HIGH QA load on Brent + feature owners

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff -1d behind (5/10 due tasks done; B1.types -2d, B1.dag -3d, B2.model -5d early — but A5.delta +2d, B0.repo/services/CLI +3d pending) available HIGH apply pipeline wiring + tool/validation CLI + actor compiler
Luis -2d behind (0/3 due tasks done; D0.beta +3d, PROV1 +2d, PROV2 +2d — apply pipeline still not started) available MED-HIGH apply pipeline + validation runner + decision persistence
Hamza 0d (on schedule; CLI0.core done Day 10 exactly as planned; no other tasks due yet) available MEDIUM resource handlers + DAG CLI + UKO/RDF groundwork
Aditya +2d ahead (C1.schema done Day 9 vs planned Day 12 = -3d; C1.examples done Day 10 vs planned Day 12 = -2d) available MEDIUM actor/skill YAML configs + MCP/Agent Skills adapters
Brent -1d behind (1/4 due tasks done; tool-domain/skill-domain/D0 tests pending — but A5.tests done 2d early) available MED-HIGH M1/M2 CLI/persistence tests + coverage stability
Rui N/A (unavailable) unavailable 2026-02-13 to 2026-02-27 HIGH test backlog resumes after 2026-02-27
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Task inventory was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-20 (Day 12)

Summary

Status: Behind ~3-5d
Deadline risk: MED-HIGH

Notes

  • Skill protocol/context/registry/inline-executor landed (Jeff batch2)
  • actor loader landed (Aditya)
  • SEC5/SEC7/CONC3/CLI0 all merged (Hamza)
  • session CLI, config CLI, persistence Robot tests, QA playbook merged (Brent)
  • ASV benchmarks operational (Michael).
  • Execute/apply pipeline (D-track) remains the critical M1 blocker — no D-track code has been merged yet.
  • Jeff's combined-batch2 branch (skill protocol + automation cleanup) pending PR/merge.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-23 +8d HIGH — execute/apply pipeline (D0b.execute, D0b.apply, D1.apply) unstarted; Jeff must pivot to D-track immediately
M2 (v3.1.0) (2026-02-18) -> ETA 2026-02-22 +4d MEDIUM — resource registry/CLI/tree/inspect all done; remaining: handlers, auto-discovery, edge cases
M3 (v3.2.0) (2026-02-22) -> ETA 2026-02-27 +5d MED-HIGH — skill infra largely done; remaining: actor compiler, skill compiler CLI, change model, MCP adapter, validation runner
M4 (v3.3.0) (2026-03-01) -> ETA 2026-03-04 +3d MEDIUM — decisions/invariants not started but building blocks (persistence, CLI patterns) are solid
M5 (v3.4.0) (2026-03-05) -> ETA 2026-03-08 +3d MEDIUM — subplan domain model done (Luis E1); orchestration and merge logic pending
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-12 +2d MEDIUM — ACMS v1 not started; gap narrowing thanks to team velocity on M1-M3 foundations

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle + persistence) behind ~1-2d ETA 2026-02-21 MEDIUM CLI/persistence tests pending (Brent branches exist); execute/apply wiring is D-track
Track B (Projects/resources + sandbox) behind ~2-3d ETA 2026-02-22 MEDIUM resource handlers/auto-discovery + DAG edge cases remaining
Track C (Actors/tools/skills/validations) behind ~4-5d ETA 2026-02-27 MED-HIGH actor compiler + skill compiler CLI + change model + MCP adapter + validation runner still pending
Track D (Change tracking + apply pipeline) behind ~7-8d ETA 2026-02-27 HIGH Critical blocker — D0b.execute/D0b.apply/D1.apply all unstarted; this blocks M1 completion
Track Q (Quality automation) +3d ahead ETA complete LOW CI improvements merged (Brent); ASV operational (Michael)
Track T (Testing) -5d behind (Rui out) ETA 2026-02-27+ MED-HIGH Brent carrying full QA load; persistence/CLI Robot tests in progress; Rui returns Feb 27

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff -1d behind (8/16 due tasks done; A6 track -13d ahead, C3 protocol/context -4d ahead, but D0b.execute/D0b.apply +2-3d behind and critical. B0 repos/services/CLI +3d pending.) available HIGH MUST pivot to D-track (execute/apply pipeline) — skill/automation batch2 ready for PR; actor compiler + CLI extensions secondary
Luis -3d behind (0/8 due tasks done; D0.beta +3d, PROV1/2 +2d, CONC1 +2d, SEC1-4 deliberately deferred to +14d. Apply pipeline is the critical gap.) available MED-HIGH apply pipeline (D1.apply) + validation runner (C5.router) + change model (C5.model — has remote branch) + provider fixes
Hamza +2d ahead (4 tasks complete, 3 done 2-3d early: SEC5 -2d, SEC7 -3d, CONC3 -2d, CLI0 on time. Strong velocity on security/ops track.) available MEDIUM resource handlers/auto-discovery + decision persistence (D3) + invariants (D2); SEC5/SEC7/CONC3/CLI0 all complete
Aditya +2d ahead (C1.schema -3d, C1.examples -2d; C2.loader code complete, needs quality+PR) available MEDIUM actor schema examples (branch exists, needs PR) + actor compiler + MCP adapter; C2.loader complete
Brent -1d behind (2/8 due tasks done on time; 6 testing tasks pending BUT most have committed code in branches just needing quality+PR. Effective coding work is closer to on schedule.) available MED-HIGH persistence tests (branches exist) + CLI tests + scale/validation edge cases; needs to open PRs for tool/skill domain Robot tests
Rui N/A (unavailable) unavailable until 2026-02-27 HIGH test backlog resumes after return
Mike/Brian N/A standby LOW ASV benchmark testing (Michael active on CI)

Task inventory

Milestone per developer as of the current date. Note: Task inventory was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-21 (Day 13)

Summary

Status: Behind ~6-8d
Deadline risk: CRITICAL

Notes

  • v2 LangGraph infrastructure stubbed (~4K LOC) and agent classes deleted during v3 transition
  • restore is now the M1 blocker and prerequisite for execute/apply.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-23 +8d CRITICAL
M2 (v3.1.0) (2026-02-22) -> ETA 2026-02-27 +5d HIGH
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-03 +5d HIGH
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-06 +4d MED-HIGH
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-08 +2d MEDIUM
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-10 +0d MEDIUM

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle + persistence) behind ~5-7d ETA 2026-02-23 CRITICAL execute/apply blocked by v2 restore
Track B (Projects/resources + sandbox) 0d (on schedule) ETA 2026-02-27 MEDIUM minor edge cases
Track C (Actors/tools/skills/validations) behind ~6-8d ETA 2026-03-03 HIGH actor compiler + MCP adapter + validation runner
Track D (Decision/correction + apply) behind ~7-9d ETA 2026-03-06 HIGH decision persistence + correction engine
Track Q (Quality automation) +3d ahead ETA complete LOW maintenance only
Track T (Testing) -5d behind (Rui out) ETA 2026-03-06+ HIGH QA load on Brent + feature owners

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff -2d behind (v2 restore + execute/apply now critical) available CRITICAL restore v2 LangGraph + agent classes, execute/apply pipeline, actor compiler
Luis -2d behind available HIGH change model + validation runner + three-way merge
Hamza 0d (on schedule) available MEDIUM decisions/invariants + ACMS + context indexing
Aditya +1d ahead available MEDIUM MCP adapter runtime + skill git
Brent 0d (on schedule) available MED-HIGH M1 E2E smoke + integration stability
Rui N/A (unavailable) unavailable 2026-02-13 to 2026-02-27 HIGH M4 integration suite after return
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Task inventory was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-22 (Day 14)

Summary

Status: Behind ~7-9d
Deadline risk: HIGH

Notes

  • Tool/router/resource registry/sandbox foundations exist
  • M1 still blocked by tool-aware execute + resource handlers + apply merge wiring.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-25 +10d HIGH
M2 (v3.1.0) (2026-02-22) -> ETA 2026-02-28 +6d HIGH
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-04 +6d MED-HIGH
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-07 +5d MED-HIGH
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-09 +3d MEDIUM
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-10 +0d MED-HIGH

Track forecast

Track Status ETA Risk Blocking
Track A (Tool-aware execute + apply) behind ~7-8d ETA 2026-02-25 HIGH actor runtime + sandbox apply merge
Track B (Resources + sandbox handlers) behind ~4-5d ETA 2026-02-24 MED-HIGH resource handlers + bindings
Track C (Actors/tools/skills/MCP) behind ~6-7d ETA 2026-02-28 HIGH actor compiler + MCP/Agent Skills loaders
Track D (Decisions/validations/invariants) behind ~8-10d ETA 2026-03-04 HIGH decision persistence + validation runner
Track E (Corrections/subplans/checkpoints) behind ~7-9d ETA 2026-03-07 MED-HIGH correction engine + subplan scheduler
Track F (ACMS v1/context scaling) behind ~8-10d ETA 2026-03-09 MEDIUM UKO/CRP + pipeline
Track Q (Quality automation) +3d ahead ETA complete LOW maintenance only
Track T (Testing) -5d behind (Rui out) ETA 2026-03-07+ MED-HIGH QA load on Brent + feature owners

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff -2d behind available HIGH actor runtime + execute wiring + actor compiler + LSP stubs
Luis -3d behind available HIGH apply pipeline + changeset persistence + validation gating
Hamza -1d behind available MED-HIGH resource handlers + decision domain + ACMS foundation
Aditya +1d ahead available MEDIUM actor YAML hierarchy + MCP runtime + Agent Skills loader
Brent 0d (on schedule) available MED-HIGH M1/M2/M3 smoke suites + coverage enforcement
Rui N/A (unavailable) unavailable 2026-02-13 to 2026-02-27 HIGH integration suites after return
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Each cell is completed/total COMMIT items for that milestone/owner. Completed counts are cumulative (all-time) and must never decrease; totals equal completed plus remaining Day 14 rebaseline items for that milestone/owner. Post-M6 rows reflect Section 18 deferred commits; totals can change as future work is added/removed but must always remain >= completed. Unassigned column was not tracked at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 23/25 1/1 1/2 2/3 4/5 0/0 N/A 31/36
M2 5/9 0/5 0/2 0/1 0/1 0/0 N/A 5/18
M3 12/13 7/7 5/9 0/4 5/7 0/0 N/A 29/40
M4 3/6 0/0 1/3 0/1 0/1 0/0 N/A 4/11
M5 0/5 0/1 1/1 0/6 1/2 0/0 N/A 2/15
M6 0/3 0/0 0/5 0/2 3/4 0/0 N/A 3/14
M6+ 0/1 0/0 0/7 0/7 0/1 0/1 N/A 0/17
Total 43/62 8/14 8/29 2/24 13/21 0/1 N/A 74/151

Story point allocation

Story points per developer per milestone. Note: Story point allocation was not recorded at this time.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 N/A N/A N/A N/A N/A N/A N/A N/A
M2 N/A N/A N/A N/A N/A N/A N/A N/A
M3 N/A N/A N/A N/A N/A N/A N/A N/A
M4 N/A N/A N/A N/A N/A N/A N/A N/A
M5 N/A N/A N/A N/A N/A N/A N/A N/A
M6 N/A N/A N/A N/A N/A N/A N/A N/A
M6+ N/A N/A N/A N/A N/A N/A N/A N/A
Total N/A N/A N/A N/A N/A N/A N/A N/A

2026-02-24 (Day 16)

Summary

Status: Behind ~7-9d
Deadline risk: HIGH
Overall completion: 72.3% (134/221 milestone issues closed, excluding Epics/Legendaries)

Notes

  • Today's merges: Actor compiler #158 (Jeff), agent skills discovery #161 (Jeff), actor CLI alignment #288 (Jeff), CLI plan/action extensions #325 (Jeff), database parallelism fix #418 (Brent)
  • Decision domain model + context snapshots merged (Hamza PR #385)
  • Resource registry + DAG metadata + handler runtime merged
  • Phase reversion landed
  • MCP adapter in review (Aditya, PR #382)
  • Agent skills loader in review (Aditya, PR #416)
  • Decision persistence in review (Hamza, PR #131)
  • CLI extension tests in review (Brent, PR #420)
  • Apply pipeline active (Luis, branch feature/m1-apply-pipeline)
  • 29 issues being redistributed: 18 Luis→Jeff, 4 Luis→Hamza, 7 Hamza→Jeff (no active branches on any)
  • Issues #402-#407 (E2E milestone verification suites) moved from Unverified to Verified
  • Issue #303 (diff review artifacts) deferred from v3.1.0 to v3.2.0.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA 2026-02-26 +11d HIGH — 7 open issues remain; sandbox apply + E2E suite are blockers
M2 (v3.1.0) (2026-02-22) -> ETA 2026-03-01 +7d HIGH — actor compiler + MCP adapter + agent skills + changeset persistence
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-05 +7d MED-HIGH — decision persistence/recording + validation pipeline + invariant enforcement
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-08 +6d MED-HIGH — subplan orchestrator + parallel execution + three-way merge
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-11 +5d MEDIUM — ACMS pipeline + context scaling + checkpointing
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-13 +3d MEDIUM — autonomy hardening + server stubs + E2E porting test

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) mostly done, config service remaining ETA 2026-03-06 LOW A9 config deferred to M5
Track B (Resources + sandbox) substantially complete ETA done LOW auto-discovery remaining only
Track C (Actors/tools/skills/MCP) behind ~6-7d ETA 2026-03-01 HIGH actor compiler + MCP adapter
Track D (Decisions/validations) behind ~7-8d ETA 2026-03-05 HIGH decision persistence + validation runner
Track E (Corrections/subplans) behind ~6-8d ETA 2026-03-08 MED-HIGH subplan scheduler + parallel exec
Track F (ACMS/context) not started ETA 2026-03-11 MEDIUM dependent on M3 completion
Track Q (Quality automation) complete N/A LOW maintenance only
Track T (Testing) -3d behind (Rui returns Feb 27) ETA ongoing MEDIUM E2E suites needed per milestone

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +1d ahead (5 merges today; 58/92 issues closed = 63% after absorbing 25 new issues) available HIGH Picks up 25 reassigned issues from Luis/Hamza across M2-M6+. Immediate: M3 validation (#173, #176, #178), M4 corrections (#186), M5 ACMS (#338, #342, #343)
Luis -5d behind (8/19 issues closed = 42% post-redistribution) available HIGH Reduced to active branches only: apply pipeline (#155, active branch), diff review (#303, active branch, deferred to M3). 18 issues reassigned to Jeff, 4 to Hamza
Hamza -1d behind (6/22 issues closed = 27%; +4 invariant issues absorbed) available MED-HIGH Decision persistence (#171, PR in review), decision recording (#172), plan explain CLI (#174). Picks up 4 invariant issues (#319-#322) from Luis
Aditya +1d ahead (20/26 issues closed = 77%) available MEDIUM MCP adapter (#159, PR #382 in review), agent skills (#160, PR #416 in review), actor YAML hierarchy (#157, active branch)
Brent 0d (on schedule; 17/32 issues closed = 53%) available MEDIUM CLI extension tests (PR #420), E2E milestone suites (#156, #402-#407), coverage enforcement
Rui N/A (returns Feb 27) returning 2026-02-27 MEDIUM Behave/Robot test suites after return
Mike/Brian N/A standby LOW ASV runner fix (#388, PR in review)

Task inventory

Milestone per developer as of the current date. Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Completed counts reflect closed issues; totals equal closed plus open. Epics and Legendaries (organizational items) are excluded. Issues without a milestone are excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 25/27 12/12 1/2 4/4 8/10 0/0 26/26 76/81
M2 20/24 8/13 4/4 1/1 2/5 0/0 0/0 35/47
M3 4/7 0/0 0/2 1/4 0/3 0/0 0/0 5/16
M4 6/8 0/0 3/4 0/4 3/5 0/0 1/1 13/22
M5 1/8 0/1 0/0 0/5 1/3 0/0 2/2 4/19
M6 2/10 0/0 0/4 0/0 3/5 0/0 0/0 5/19
M6+ 0/8 0/0 0/3 0/4 0/1 0/0 1/1 1/17
Total 58/92 20/26 8/19 6/22 17/32 0/0 30/30 139/221

Story point allocation

Story points per developer per milestone. Note: Each cell is completed/total story points for that milestone/owner per Forgejo tracker. Issues without a Points/X label or milestone are excluded. Epics and Legendaries (organizational items) are excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 172/188 128/128 8/16 19/19 65/71 - 95/95 487/517
M2 142/171 49/86 29/29 5/5 10/21 - - 235/312
M3 37/58 - 0/21 5/23 0/11 - - 42/113
M4 34/47 - 29/34 0/32 18/24 - 1/1 82/138
M5 5/61 0/8 - 0/37 8/14 - 4/4 17/124
M6 13/92 - 0/39 - 24/30 - - 37/161
M6+ 0/64 - 0/24 0/29 0/5 - 8/8 8/130
Total 403/681 177/222 66/163 29/145 125/176 0/0 108/108 908/1495

2026-02-26 (Day 18)

Summary

Status: Behind ~5-7d
Deadline risk: HIGH (narrowing)
Overall completion: 74.5% (~168/225 milestone issues closed, excluding Epics/Legendaries)

Notes

  • 65 issues closed in 3 days (Days 16-18) — the largest productivity burst of the project
  • M1 essentially complete: only #323 (FakeListLLM defaults) remains open
  • Apply pipeline + validation gating + diff review + DoD gating landed in a single batch (Luis PR #417)
  • Decision persistence merged (Hamza PR #131)
  • Actor YAML hierarchy merged (Aditya PR #432)
  • Security hardening batch: template rendering (#319), exception handling (#320), async cleanup (#321) — all merged
  • Brent QA batches merged: M1-M4 E2E suites (#156, #169, #179, #180, #326, #402-#405, #187)
  • Concurrency controls: locks (#327), plan resume (#328), provider cost controls (#324) merged
  • Changeset persistence (#163) and CI concurrency groups (#452) merged
  • Rui returns from leave tomorrow (Feb 27)
  • M3 target date is today; 3 issues remain (#172, #173, #174)

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> ETA Done +11d actual LOW — 1 issue remaining (#323)
M2 (v3.1.0) (2026-02-22) -> ETA 2026-03-01 +7d MED-HIGH — 5 open issues; MCP adapter + agent skills loader are blockers
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-02 +4d MEDIUM — 3 open issues; decision recording + invariant enforcement + plan explain
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-06 +4d MEDIUM — 3 open issues; subplan orchestrator + correction wiring
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-10 +4d MEDIUM — 14 open issues; ACMS pipeline + context scaling
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-12 +2d MEDIUM — 14 open issues; autonomy hardening + server stubs

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) essentially complete Done (config service deferred to M5) LOW none
Track B (Resources + sandbox) complete Done LOW none
Track C (Actors/tools/skills/MCP) behind ~4-5d ETA 2026-03-01 MED-HIGH MCP adapter (#159) + agent skills loader (#160) + skill persistence (#166) + skill CLI (#167, #168)
Track D (Decisions/validations) behind ~4d ETA 2026-03-02 MEDIUM decision recording (#172) + invariant enforcement (#173) + plan explain (#174)
Track E (Corrections/subplans) behind ~4d ETA 2026-03-06 MEDIUM subplan orchestrator (#183) + correction wiring (#184)
Track F (ACMS/context) not started ETA 2026-03-10 MEDIUM dependent on M3 completion
Track Q (Quality automation) complete Done LOW maintenance only
Track T (Testing) strong progress ETA ongoing LOW-MED M1-M4 E2E suites done; M5/M6 remain; Rui returns Feb 27

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +2d ahead (exceptional throughput; absorbing 25+ reassigned issues successfully) available MEDIUM Invariant enforcement (#173), skill persistence (#166), FakeListLLM fix (#323), M5/M6 backlog
Luis -3d behind (8/19 closed = 42%; but validation/apply batch was substantial contribution) available MEDIUM Correction wiring (#184), remaining M5/M6 items
Hamza 0d (on schedule; decision persistence landed; security batch landed) available MEDIUM Decision recording (#172), plan explain CLI (#174), M5 ACMS items
Aditya -1d behind (MCP adapter and agent skills loader are M2 critical path) available MED-HIGH MCP adapter (#159), agent skills loader (#160), skill CLI (#167, #168)
Brent +1d ahead (M1-M4 E2E suites all merged in 2 QA batches) available LOW M5 E2E suite (#406), M6 E2E suite (#407), coverage maintenance
Rui N/A (returns Feb 27) returning tomorrow MEDIUM Behave/Robot test suites after return
Mike/Brian N/A standby LOW ASV runner fix merged (#388)

Task inventory

Milestone per developer as of the current date. Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 26/27 12/12 2/2 4/4 10/10 0/0 97/97 151/152
M2 22/22 8/12 4/4 1/1 5/5 0/0 52/52 92/96
M3 5/6 0/0 2/2 1/3 3/3 0/0 0/0 11/14
M4 7/8 0/0 3/4 1/2 7/7 0/0 1/1 19/22
M5 1/8 0/1 0/1 0/5 1/3 0/0 2/2 4/20
M6 2/10 0/0 0/4 0/0 3/5 0/0 0/0 5/19
M6+ 0/8 0/0 0/3 0/4 0/1 0/0 1/1 1/17
Total 63/89 20/25 11/20 7/19 29/33 0/0 153/153 283/339

Story point allocation

Story points per developer per milestone. Note: Each cell is completed/total story points for that milestone/owner per Forgejo tracker. Issues without a Points/X label or milestone are excluded. Epics and Legendaries (organizational items) are excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 180/188 128/128 16/16 19/19 71/71 - 95/95 509/517
M2 147/176 49/86 29/29 5/5 21/21 - - 251/317
M3 45/58 - 21/21 13/23 11/11 - - 90/113
M4 42/47 - 29/34 8/32 24/24 - 1/1 104/138
M5 5/61 0/8 - 0/37 8/14 - 4/4 17/124
M6 13/92 - 0/39 - 24/30 - - 37/161
M6+ 0/64 - 0/24 0/29 0/5 - 8/8 8/130
Total 432/686 177/222 95/163 45/145 159/176 0/0 108/108 1016/1500

2026-02-28 (Day 20)

Summary

Status: Behind ~3-5d
Deadline risk: HIGH (narrowing)
Overall completion: 86.3% (~297/344 milestone issues closed, excluding Epics/Legendaries)

Notes

  • M1 fully complete: FakeListLLM default removal (#459) merged — 0 open M1 issues
  • M2 fully complete: MCP adapter (#434), agent skills loader (#453), skill CLI (#454), MCP refresh hooks (#455), skill persistence (#460) all merged — 0 open M2 issues
  • Decision service wiring (#461) and sandbox checkpoint hooks (#462) merged
  • Security: read-only actions (#436), async resource cleanup (#435) merged
  • M6 E2E autonomy suite (#457) merged; coverage improvements (#468) merged
  • SafetyProfile spec documentation (#471, #472) merged
  • Rui returned from leave (Feb 27) — available for M5+ test assignments
  • Hamza has 4 active items: decision recording (#172, PR #433), plan explain (#174, PR #464), ACMS pipeline (#188, PR #465), UKO ontology (#189, PR #466) — all In Progress or In Review
  • Luis has 6 open PRs: subplan execution (#444), autonomy guardrails (#443), checkpointing (#445), semantic validation (#449), safety profiles (#450), permissions (#448)
  • M3 down to 2 issues (both Hamza's with PRs open); M4 down to 1 issue (Luis's, PR in review)
  • All open issues now have assignees (0 unassigned)

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> Done +13d actual COMPLETE
M2 (v3.1.0) (2026-02-22) -> Done +6d actual COMPLETE
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-02 +4d MEDIUM — 2 open issues; Hamza has PRs for both
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-04 +2d LOW-MED — 1 open issue; Luis PR #444 in review
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-10 +4d MED-HIGH — 15 open issues; ACMS pipeline + context scaling + UKO
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-12 +2d MEDIUM — 13 open issues; 6 Luis PRs in flight; autonomy hardening

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) complete Done LOW none
Track B (Resources + sandbox) complete Done LOW none
Track C (Actors/tools/skills/MCP) complete Done LOW none
Track D (Decisions/validations) behind ~4d ETA 2026-03-02 MEDIUM decision recording (#172) + plan explain (#174) — both Hamza with PRs
Track E (Corrections/subplans) behind ~2d ETA 2026-03-04 LOW-MED subplan execution (#184) — Luis PR in review
Track F (ACMS/context) in progress ETA 2026-03-10 MED-HIGH ACMS pipeline (#188) + UKO (#189) + context strategies
Track Q (Quality automation) complete Done LOW maintenance only
Track T (Testing) strong progress ETA ongoing LOW-MED M5/M6 E2E remain; Rui now available

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +3d ahead (M1/M2 complete, 69/92 closed = 75%; throughput remains exceptional) available MEDIUM M5 ACMS items (#190, #192, #194, #197, #199, #258, #259), M6 decomposition (#201, #203, #205, #208, #209)
Luis -2d behind (11/19 closed = 58%; but 6 PRs in review represent massive in-flight work) available MEDIUM M4 subplan merge (#184, PR #444), M6 checkpointing/validation/autonomy PRs
Hamza -1d behind (11/22 closed = 50%; 4 PRs in progress covering M3/M5) available MEDIUM M3 decision recording (#172, PR #433), plan explain (#174, PR #464), M5 ACMS/UKO (#188, #189)
Aditya 0d (on schedule; 25/26 closed = 96%; only 1 open issue) available LOW M5 plan-subplan tool (#198, PR #463)
Brent +1d ahead (28/32 closed = 88%; M1-M4 E2E complete, M6 E2E merged) available LOW M5 E2E suite (#406, PR #456), M6+ items
Rui N/A (just returned Feb 27) available LOW-MED Behave/Robot test suites for M5+; ramping up
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 27/27 12/12 2/2 4/4 10/10 0/0 97/97 152/152
M2 24/24 13/13 4/4 1/1 5/5 0/0 52/52 99/99
M3 7/7 0/0 2/2 2/4 3/3 0/0 0/0 14/16
M4 8/8 0/0 3/4 4/4 5/5 0/0 1/1 21/22
M5 1/8 0/1 0/0 0/5 1/3 0/0 2/2 4/19
M6 2/10 0/0 0/4 0/0 4/5 0/0 0/0 6/19
M6+ 0/8 0/0 0/3 0/4 0/1 0/0 1/1 1/17
Total 69/92 25/26 11/19 11/22 28/32 0/0 153/153 297/344

Story point allocation

Story points per developer per milestone. Note: Each cell is completed/total story points for that milestone/owner per Forgejo tracker. Issues without a Points/X label or milestone are excluded. Epics and Legendaries (organizational items) are excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 188/188 128/128 16/16 19/19 71/71 - 95/95 517/517
M2 176/176 86/86 29/29 5/5 21/21 - - 317/317
M3 58/58 - 21/21 13/23 11/11 - - 103/113
M4 47/47 - 29/34 32/32 24/24 - 1/1 133/138
M5 5/61 0/8 - 0/37 8/14 - 4/4 17/124
M6 13/92 - 0/39 - 25/30 - - 38/161
M6+ 0/64 - 0/24 0/29 0/5 - 8/8 8/130
Total 487/686 214/222 95/163 69/145 160/176 0/0 108/108 1133/1500

2026-03-02 (Day 22)

Summary

  • Timeline reference: Day 7/M1 = 2026-02-15, Day 14/M2 = 2026-02-22, Day 18/M3 = 2026-02-26, Day 22/M4 = 2026-03-02, Day 26/M5 = 2026-03-06, Day 30/M6 = 2026-03-10
  • Status: Behind ~3d (narrowing)
  • Deadline risk: MEDIUM
  • Overall completion: ~79% (193/243 milestone leaf issues closed, excluding Epics/Legendaries)

Notes

  • Integration batch PR #508 merged: 6 features landed on master in a single integration commit (Mar 2): CRP models (#190/PR #505), subplan service (#197/PR #506), config overrides (#259/PR #504), server stubs (#201/PR #507), test consolidation (#485/PR #502), ASV benchmarks (#486/PR #503).
  • M4 feature-complete: Subplan execute+merge merged Mar 1; config service (#258) merged Mar 1. M4 has 22 closed, 1 open (E2E validation #495 for Rui).
  • Test suite 90%+ faster: BDD 26min→2min, coverage 75min→5min (PR #493 merged Mar 2). Coverage at 98%.
  • 5 new spec-gap issues created: Devcontainer resource type (#511), execution environment routing (#512), resource type inheritance (#513), devcontainer lifecycle (#514), container tool execution (#515). #511-#513 in v3.5.0, #514-#515 in v3.6.0.
  • All issues now assigned: Bulk assignment completed for M5 (10 issues), M6 (12 issues), M3/M4 E2E tests, and all 5 new spec-gap issues. Rui (hurui200320) assigned to E2E validation (#494-#496) and semantic validation tests (#316).
  • Hamza bottleneck persists: Still has 4 active PRs — M3 (#433 NOT mergeable, #464 mergeable) and M5 (#465 NOT mergeable, #466 NOT mergeable). M3 PRs must close before M5 ACMS can accelerate. Merge conflicts in #433, #465, #466 require rebase.
  • 9 open PRs: #463 (Aditya, mergeable), #464 (Hamza, mergeable), #509 (Aditya, mergeable), #510 (Luis, mergeable) ready to merge. #433, #450, #465, #466 have merge conflicts. #458 mergeable.
  • Issues #190 and #201 stuck open: Work merged via integration batch but Forgejo dependency constraints prevent API closure. Comments added documenting merged state.
  • M5 is the critical path: 13 open leaf issues (excl. Epics), 4 days to Mar 6 target. ACMS pipeline requires strategies, coordinator, backends, compressor, indexing, context CLI wiring.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> Done +13d actual COMPLETE
M2 (v3.1.0) (2026-02-22) -> Done +6d actual COMPLETE
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-04 +6d LOW-MED — 2 feature PRs (Hamza, #433 needs rebase) + E2E validation (Rui)
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-04 +2d LOW — feature-complete; only E2E validation (#495, Rui) remains
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-12 +6d HIGH — 13 open leaf issues; ACMS pipeline is critical path; Hamza blocked on M3 PRs
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-14 +4d MEDIUM — 14 open leaf issues; autonomy/validation already landed; Luis+Jeff assigned

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) complete Done LOW none
Track B (Resources + sandbox) complete Done LOW none
Track C (Actors/tools/skills/MCP) complete Done LOW none
Track D (Decisions/validations) behind ~6d ETA 2026-03-04 LOW-MED decision recording (#172, PR #433 needs rebase) + plan explain (#174, PR #464 mergeable) — both Hamza
Track E (Corrections/subplans) complete Done LOW subplan execute+merge merged Mar 1; subplan service merged Mar 2
Track F (ACMS/context) in progress ETA 2026-03-12 HIGH ACMS pipeline (#188) + UKO (#189) + strategies (#191, #192) + backends (#498) + compressor (#194) + indexing (#195) — Hamza blocked on M3 PRs; Jeff+Luis picking up overflow
Track Q (Quality automation) complete Done LOW test suite 90%+ faster; maintenance only
Track T (Testing) strong progress ETA ongoing LOW-MED M3/M4/M5/M6 E2E validation (#494-#497) assigned to Rui+Brent; semantic validation (#316) assigned to Rui

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +3d ahead (72/92 closed = 78%; integration batch + config service merged Days 21-22) available MEDIUM M5 ACMS: backends (#498), fusion (#192), compressor (#194), multi-project (#199); M6: decomposition (#205), tiers (#208), observability (#500), ACP (#501)
Luis 0d (on schedule; 16/24 closed = 67%; subplan + autonomy + validation merged; freed up) available LOW-MED M5 context CLI (#499); M6 LSP stub (#203), async execution (#312), retry policies (#313); M6+ devcontainer (#514, #515)
Hamza -3d behind (11/23 closed = 48%; 4 PRs, 3 with merge conflicts) available HIGH M3 decision recording (#172, PR #433 REBASE NEEDED), plan explain (#174, PR #464), then M5 UKO (#189), ACMS pipeline (#188), strategy registry (#191), scoped view (#193), indexing (#195)
Aditya 0d (on schedule; 25/28 closed = 89%; 2 mergeable PRs) available LOW M5 subplan tool (#198, PR #463), M6 event bus (#473, PR #509), cost estimation (#209)
Brent +2d ahead (31/34 closed = 91%; E2E suites complete) available LOW M6 CLI polish (#210), safety profile tests (#333), M6 E2E (#497)
Rui -3d behind (1/5 closed = 20%; just returned, ramping up on E2E + testing issues) available LOW-MED M3 E2E (#494), M4 E2E (#495), M5 E2E (#496), M6 semantic validation (#316)
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of the current date. Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries excluded. PRs excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 27/27 12/12 2/2 4/4 10/10 0/0 26/26 81/81
M2 24/24 13/13 4/4 1/1 5/5 0/0 2/2 49/49
M3 7/7 0/0 2/2 2/4 3/3 0/1 5/5 19/22
M4 8/8 0/0 4/4 4/4 5/5 0/1 1/1 22/23
M5 4/9 0/1 0/1 0/5 3/3 0/1 3/3 10/23
M6 2/9 0/1 3/6 0/1 5/7 0/1 0/0 10/25
M6+ 0/8 0/1 1/5 0/4 0/1 1/1 0/0 2/20
Total 72/92 25/28 16/24 11/23 31/34 1/5 37/37 193/243

Story point allocation

Story points per developer per milestone. Note: Each cell is completed/total story points for that milestone/owner per Forgejo tracker. Issues without a Points/X label or milestone are excluded. Epics and Legendaries (organizational items) are excluded.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 188/188 128/128 16/16 19/19 71/71 - 95/95 517/517
M2 176/176 86/86 29/29 5/5 21/21 - 5/5 322/322
M3 58/58 - 21/21 13/23 11/11 0/1 45/45 148/159
M4 47/47 - 34/34 32/32 24/24 0/1 1/1 138/139
M5 29/69 0/8 0/8 0/37 14/14 0/1 17/17 60/154
M6 13/79 0/8 31/60 0/8 30/39 0/8 - 74/202
M6+ 0/64 - 8/50 0/29 0/5 8/8 - 16/156
Total 511/681 214/230 139/218 69/153 171/185 8/19 163/163 1275/1649

2026-03-04 (Day 24)

  • Timeline reference: Day 7/M1 = 2026-02-15, Day 14/M2 = 2026-02-22, Day 18/M3 = 2026-02-26, Day 22/M4 = 2026-03-02, Day 26/M5 = 2026-03-06, Day 30/M6 = 2026-03-10
  • Summary: Project ~3d behind schedule (narrowing). M3 decision PRs (#433, #464) both merged to master (Days 23-24). 7 bookkeeping issues updated to State/Completed (code already on master: #190, #194, #201, #208, #498, #499, #501). 3 bugs triaged (#522, #523, #524 — reported by Brent), created 2 test-first issues (#536, #537). 44 non-merge commits since Day 22. M5 (ACMS) remains critical path with 2 days to target. Hamza's M3 blockers now resolved — he can focus entirely on M5 ACMS work.

Day 24 highlights:

  • Decision recording PR #433 and plan explain PR #464 both merged (Hamza's M3 blockers resolved).
  • 7 issues with code on master updated to State/Completed (#190, #194, #201, #208, #498, #499, #501). Forgejo dependency constraints prevent formal API closure but issues are clearly marked done.
  • Additional features merged since Day 22: ACP facade wiring, skeleton compressor, backend implementations, devcontainer resource handler, context tiers, execution environment routing, multi-project subplan, large-project decomposition, safety profile enforcement, observability metrics, context CLI wiring.
  • 3 bugs triaged (#522 init --yes, #523 fs-directory, #524 git-checkout) — all reported by Brent, root cause: bootstrap_builtin_types() never called. Test-first issues #536 (Brent) and #537 (Brent) created to write failing tests before fixes (#522, #523, #524 assigned to Jeff).
  • M5 is critical path: 10 truly-open leaf issues (14 open per Forgejo minus 4 State/Completed), 2 days to Mar 6 target. Hamza has 5 M5 issues (all In Progress), Jeff has 2, Aditya 1, Luis 1, Rui 1.
  • M6 progress: 8 truly-open leaf issues (11 open per Forgejo minus 3 State/Completed). Luis, Jeff, Brent, Aditya, Hamza all have active M6 work.

Warning

: M5 (ACMS v1) will miss its Mar 6 target. Estimated completion ~Mar 12 (+6d). Hamza's M3 blockers are now resolved — he should immediately rebase PRs #465 (ACMS pipeline) and #466 (UKO) and focus on M5 exclusively. Jeff should start #192 (strategy coordinator) immediately as it's the highest-priority unstarted Must Have. M6 is tracking ~4d behind with ~8 open leaf issues and 6 days to target — achievable if M5 ACMS work doesn't cascade delays.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> Done +13d actual COMPLETE
M2 (v3.1.0) (2026-02-22) -> Done +6d actual COMPLETE
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-06 +9d LOW — 1 E2E (#494 Rui, PR open) + 3 bugs (#522-#524) + 2 test issues (#536-#537). Feature-complete.
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-06 +4d LOW — 1 E2E validation (#495 Rui, PR open) + 1 security epic. Feature-complete.
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-12 +6d HIGH — 10 truly-open leaf issues; Hamza has 5 (all In Progress); ACMS pipeline critical path; PRs #465/#466 need rebase
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-14 +4d MEDIUM-HIGH — 8 truly-open leaf issues; async execution (Luis), LSP (Luis), CLI polish (Brent), estimation (Aditya), resource inheritance (Hamza)

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) complete Done LOW none
Track B (Resources + sandbox) complete Done LOW none
Track C (Actors/tools/skills/MCP) complete Done LOW none
Track D (Decisions/validations) complete Done LOW Decision recording (#433) and plan explain (#464) both merged Days 23-24
Track E (Corrections/subplans) complete Done LOW none
Track F (ACMS/context) in progress ETA 2026-03-12 HIGH ACMS pipeline (#188, Hamza) + UKO (#189, Hamza) + strategies (#191, Hamza) + coordinator (#192, Jeff) + scoped view (#193, Hamza) + indexing (#195, Hamza) + subplan tool (#198, Aditya). CRP, backends, compressor, tiers, context CLI all merged.
Track Q (Quality automation) complete Done LOW maintenance only
Track T (Testing) strong progress ETA ongoing LOW-MED M3 E2E (#494 Rui, PR #527), M4 E2E (#495 Rui, PR #529), M5 E2E (#496 Rui), M6 E2E (#497 Brent, PR #517). Bug tests (#536, #537 Brent).

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +3d ahead (78/96 effective = ~81%; 7 issues updated to Completed) available MEDIUM M5: coordinator (#192 — start immediately), multi-project completed. M6: decomposition, tiers, observability, ACP all completed. Start M5 #192, then M3 bugs #522-#524.
Luis 0d (on schedule; 19/27 effective = ~70%; context CLI merged) available LOW-MED M5 context CLI completed. M6: LSP stub (#203), async execution (#312), retry policies (#313); M6+ devcontainer (#514, #515)
Hamza -3d behind (11/23 closed = 48%; M3 blockers NOW RESOLVED) available HIGH M3 blockers resolved — immediately focus on M5: rebase PRs #465 (ACMS pipeline) and #466 (UKO), then #191 (strategy registry), #193 (scoped view), #195 (indexing)
Aditya 0d (on schedule; 25/29 effective = 86%; PRs mergeable) available LOW M5 subplan tool (#198, PR #463), M6 event bus (#473, PR #509), estimation (#209, PR #528)
Brent +2d ahead (31/34 closed = 91%) available LOW M3: bug test issues (#536, #537). M6: CLI polish (#210, PR #521), safety profile tests (#333, PR #516), M6 E2E (#497, PR #517)
Rui -3d behind (1/5 closed = 20%; ramping up post-leave) available LOW-MED M3 E2E (#494, PR #527), M4 E2E (#495, PR #529), M5 E2E (#496 — no branch yet)
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of Day 24 (2026-03-04). Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries excluded. PRs excluded. Issues with State/Completed but not formally closed count as completed.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 27/27 12/12 2/2 4/4 10/10 0/0 26/26 81/81
M2 24/24 13/13 4/4 1/1 5/5 0/0 2/2 49/49
M3 8/11 0/0 2/2 4/4 3/5 0/1 7/7 24/30
M4 8/9 0/0 4/4 4/4 5/5 0/1 3/3 24/26
M5 9/11 0/1 1/2 0/5 3/3 0/1 4/4 17/27
M6 6/10 0/1 3/6 0/1 5/7 1/1 1/1 16/27
M6+ 0/8 0/1 1/5 0/4 0/1 1/1 0/0 2/20
Total 82/100 25/28 17/25 13/23 31/36 2/5 43/43 213/260

Story point allocation

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 188/188 128/128 16/16 19/19 71/71 - 95/95 517/517
M2 176/176 86/86 29/29 5/5 21/21 - 5/5 322/322
M3 58/66 - 21/21 23/23 11/17 0/1 45/51 158/179
M4 47/52 - 34/34 32/32 24/24 0/1 1/1 138/144
M5 63/79 0/8 8/16 0/37 14/14 0/1 17/17 102/172
M6 47/85 0/8 31/60 0/8 30/39 8/8 - 116/208
M6+ 0/64 - 8/50 0/29 0/5 8/8 - 16/156
Total 579/710 214/230 147/226 79/153 171/191 16/19 163/169 1369/1698

2026-03-05 (Day 25)

  • Timeline reference: Day 7/M1 = 2026-02-15, Day 14/M2 = 2026-02-22, Day 18/M3 = 2026-02-26, Day 22/M4 = 2026-03-02, Day 26/M5 = 2026-03-06, Day 30/M6 = 2026-03-10
  • Summary: Project ~4-5d behind schedule (narrowing). Jeff merged 6 spec-gap features in a single session on Day 24 (#542, #543, #546, #547, #548, #549), eliminating the majority of Critical/High spec-gap blockers. Hamza's ACMS v1 context pipeline (#188, PR #465) merged overnight (Day 25). Luis merged async workers (#312) and safety profile enforcement (#345). Brent opened 9 TDD PRs for 6 newly-identified bugs. Rui rebased acceptance gate PRs (both have merge conflicts). 39 newer issues remain unassigned — label and assignment cleanup in progress.

Day 25 highlights:

  • Jeff's spec-gap burst: influence DAG traversal (#542), tool wrapping runtime (#543), semantic escalation (#546), cross-plan correction cascading (#547), sandbox boundary algebra (#548), invariant reconciliation actor (#549) — all merged with full Behave, Robot, and ASV test suites.
  • Hamza's ACMS v1 (#188, PR #465) merged — 10-component pluggable context assembly pipeline with 3 built-in strategies, DI injection, and budget allocation.
  • Luis merged async command execution (#312 — ThreadPoolExecutor workers, cancellation tokens, health monitoring, SQLAlchemy persistence) and safety profile enforcement (#345 — precedence resolution, unsafe tool gating, skill category allow-lists).
  • Brent identified 3 additional bugs through systematic testing (#554/#570 session DI, #589/#590 project persistence, #592 actor list), wrote root cause analyses, and opened 9 TDD PRs total with intentionally-failing tests.
  • 39 newer issues (#536-#596 range) are completely unassigned and many are missing required labels.
  • PRs #559 and #560 (M3/M4 acceptance gates, Rui) both have merge conflicts and need rebase.
  • PR #509 (event bus, Aditya) approved by Hamza but has merge conflict.
  • PR #565 (ACMS strategy registry, Hamza) has no milestone, no labels, and merge conflict.
  • Issue #352 (Epic: Config Service A9) is State/Completed but still open — needs closure.

Warning

: M5 (ACMS v1) will miss its Mar 6 target (TOMORROW). Estimated completion ~Mar 10-12 (+4-6d). Jeff's spec-gap burst has significantly reduced the remaining backlog but Hamza still has 3 open M5 issues (#191, #193, #195) and his PR #565 has a merge conflict. The v3.2.0 bug fixes are straightforward but need to be assigned and executed. M3/M4 gate closure is blocked on Rui's PR rebases.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> Done +13d actual COMPLETE
M2 (v3.1.0) (2026-02-22) -> Done +6d actual COMPLETE
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-07 +10d MEDIUM — E2E (#494 Rui, PR #559 needs rebase) + 6 bugs (TDD PRs ready, fixes need assignment). Feature-complete.
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-07 +5d LOW — E2E validation (#495 Rui, PR #560 needs rebase) + security epic (#362). Feature-complete.
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-10 +4d HIGH — ~14 open issues; ACMS v1 merged but strategy components remain; Jeff's burst cleared most spec gaps; Hamza has 3 remaining
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-14 +4d MEDIUM — ~18 open issues; majority of spec-gap Critical/High items resolved; LSP, estimation, CLI polish, retry policies remain

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) complete Done LOW none
Track B (Resources + sandbox) complete Done LOW 6 bugs in v3.2.0 (TDD tests ready)
Track C (Actors/tools/skills/MCP) complete Done LOW Invariant reconciliation actor (#549) and tool wrapping (#543) both merged
Track D (Decisions/validations) complete Done LOW Influence DAG (#542) and cross-plan correction (#547) both merged
Track E (Corrections/subplans) complete Done LOW none
Track F (ACMS/context) substantial progress ETA 2026-03-10 MEDIUM-HIGH ACMS v1 pipeline merged. Remaining: strategy registry (#191, Hamza — PR #565 conflict), scoped view (#193, Hamza), indexing (#195, Hamza), coordinator (#192, Jeff), spec-gap pipeline components (#538-#541).
Track Q (Quality automation) complete Done LOW maintenance only
Track T (Testing) strong progress ETA ongoing MEDIUM M3 E2E (#494 Rui, PR #559 conflict), M4 E2E (#495 Rui, PR #560 conflict), M5 E2E (#496 Rui), M6 E2E (#497 Brent). 9 TDD PRs (Brent).

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +4d ahead (88/100 effective = ~88%; 6 spec-gap features + earlier work) available LOW M3 bug fixes (#522-#524, #554, #570, #589, #590, #592 — quick DI/persistence fixes). Then M5 coordinator (#192).
Luis 0d (on schedule; 19/25 effective = ~76%; async + safety profile merged) available LOW Active code reviewer. M6: LSP stub (#203), retry policies (#313); M6+ devcontainer (#514, #515).
Hamza -2d behind (14/23 closed = 61%; ACMS v1 merged Day 25) available MEDIUM-HIGH M5 critical path: rebase PR #565 (strategy registry), then #193 (scoped view), #195 (indexing).
Aditya 0d (on schedule; 25/28 effective = 89%) available LOW M5 subplan tool (#198). M6 event bus (#473, PR #509 — approved, needs rebase). Cost estimation (#209).
Brent +3d ahead (31/36 closed = 86%; 9 TDD PRs opened) available LOW Continue TDD cycle: respond to code review feedback on PRs #566-#568. M6: CLI polish (#210), M6 E2E (#497).
Rui -2d behind (2/5 closed = 40%; ramping up post-leave) available MEDIUM URGENT: rebase PRs #559 (M3 gate) and #560 (M4 gate) onto latest master. Then M5 E2E (#496).
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of Day 25 (2026-03-05). Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries excluded. PRs excluded. Issues with State/Completed but not formally closed count as completed. Newly identified issues (#553-#596) that are unassigned are counted in the Unassigned column.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 27/27 12/12 2/2 4/4 10/10 0/0 26/26 81/81
M2 24/24 13/13 4/4 1/1 5/5 0/0 2/2 49/49
M3 8/11 0/0 2/2 4/4 3/5 0/1 7/15 24/38
M4 8/9 0/0 4/4 4/4 5/5 0/1 3/3 24/26
M5 15/17 0/1 2/2 1/5 3/3 0/1 4/4 25/33
M6 10/14 0/1 5/8 0/1 5/7 1/1 1/1 22/33
M6+ 0/8 0/1 1/5 0/4 0/1 1/1 0/0 2/20
Total 92/110 25/28 20/27 14/23 31/36 2/5 43/51 227/280

Story point allocation

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 188/188 128/128 16/16 19/19 71/71 - 95/95 517/517
M2 176/176 86/86 29/29 5/5 21/21 - 5/5 322/322
M3 58/66 - 21/21 23/23 11/17 0/1 45/69 158/197
M4 47/52 - 34/34 32/32 24/24 0/1 1/1 138/144
M5 75/91 0/8 16/16 8/37 14/14 0/1 17/17 130/184
M6 59/97 0/8 39/68 0/8 30/39 8/8 - 136/228
M6+ 0/64 - 8/50 0/29 0/5 8/8 - 16/156
Total 603/734 214/230 163/234 87/153 171/191 16/19 163/187 1417/1748

2026-03-06 (Day 26)

  • Timeline reference: Day 7/M1 = 2026-02-15, Day 14/M2 = 2026-02-22, Day 18/M3 = 2026-02-26, Day 22/M4 = 2026-03-02, Day 26/M5 = 2026-03-06, Day 30/M6 = 2026-03-10
  • Summary: Project ~4-5d behind schedule (steady). Today is the original M5 target (Day 26), which will be missed as expected. The gap has stabilized at ~4-5 days. Significant merge activity: Hamza closed both remaining M5 ACMS strategy issues (#191 strategy registry, #193 scoped backend view) and opened 5 new PRs for M5/M6 work. Rui's M4 acceptance gate (#495, PR #560) merged — M4 is now closeable. Aditya's event bus (#509) merged. Jeff completed 7 additional spec-gap features on Day 25 (#538, #539, #540, #541, #544, #551, #569) that were not captured in the Day 25 entry. Luis opened 3 new PRs (#613 devcontainer lifecycle, #614 retry policies, #616 container tool exec). Brent's 8 TDD PRs continue through multi-round review cycles. M3 still has 6 bug-fix PRs + 3 TDD PRs in review. 5 PRs have merge conflicts needing rebase.

Day 26 highlights:

  • Hamza resolved the M5 ACMS critical path: strategy registry (#191, PR #565) and scoped backend view (#193, PR #607) both merged. Opened 5 new PRs: repo indexing (#610), domain analyzers (#611), UKO Indexer (#612), temporal data model (#615), UKO Layer 1 ontologies (#617), resource type inheritance (#618). Most productive day for Hamza this project.
  • Rui merged M4 acceptance gate (#495, PR #560) with 7 verified acceptance criteria, 3 new CLI integration tests, and a pre-existing unit test fix. M3 acceptance gate (#494, PR #559) also merged on late Day 25.
  • Aditya merged event bus (#509) — domain event infrastructure with RxPy-based reactive bus. Nearly complete on assigned work (31/32 issues closed).
  • Jeff completed 7 spec-gap features on late Day 25 (not captured in prior entry): ContextFragment data model (#538), pipeline orchestrator Phase 1 (#539), pipeline Phase 2 components (#540), context strategies batch 1 (#541), depth/breadth projection (#544), UKO analyzer framework (#551), ContextFragment model unification (#569). Also merged subplan tool (#198/PR #463, Aditya's code). Jeff now at 103/147 issues closed.
  • Luis opened 3 new PRs: devcontainer lifecycle (#613, 13 comments already), retry policies (#614), container tool execution (#616, merge conflict). LSP server stub (#203) merged late Day 25.
  • Brent continues multi-round TDD PR review cycles (8 PRs with 7-16 comments each). Provided thorough reviews on PRs #610, #611, #612, #613 (43 findings on #612 alone). Also merged opencode.json config (#609).
  • 5 PRs had merge conflicts at start of day: #617 (Hamza — resolved, merged), #616 (Luis), #615 (Hamza), #618 (Hamza), #458 (stale — flagged for closure).
  • PR #617 (UKO Layer 1 Ontologies) merged late Day 26 by Hamza — 4 domain ontologies (uko-code, uko-doc, uko-data, uko-infra) + Python registry + DetailLevelMap presets + 31 BDD scenarios + 6 Robot tests.
  • PR #528 closed as duplicate of #209 per CTO instruction.
  • 15 open PRs at end of day (down from 19 at start). Review throughput improving — merge rate exceeding new PR rate for first time.

Status: M5 target (today) missed as forecast. Realistic M5 ETA is ~Mar 9-10 (+3-4d) — improved from yesterday's ~Mar 10-12 estimate thanks to Hamza's ACMS merges. M3 closure blocked on bug-fix PR merges (8 PRs in review). M4 acceptance gate passed — only security epic (#362) remains. M6 ETA ~Mar 13-15 (+3-5d).

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> Done +13d actual COMPLETE
M2 (v3.1.0) (2026-02-22) -> Done +6d actual COMPLETE
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-08 +11d MEDIUM — Both acceptance gates merged. 6 bug-fix + 3 TDD PRs in review (8 of 9 have author responses, most ready for final approval). Merge throughput is the bottleneck.
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-07 +5d LOW — Acceptance gate (#495) merged. Security epic (#362) + 1 bug (#606). Feature-complete.
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-09 +3d MEDIUM-HIGH — Strategy registry and scoped view merged (Hamza). Remaining: repo indexing (#195, PR #610 in review), UKO Indexer (PR #612 in review with 43 findings), strategy coordinator (#192, Jeff), spec-gap pipeline items, M5 E2E (#496, Rui).
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-14 +4d MEDIUM — ~15 open issues. 5 new PRs opened today, 2 merged same day (UKO L1 #617, analyzers #611). LSP merged. Retry policies (#614), temporal data model (#615), resource type inheritance (#618) in review.

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) complete Done LOW none
Track B (Resources + sandbox) complete Done LOW 6 bugs in v3.2.0 (TDD tests + fixes in review)
Track C (Actors/tools/skills/MCP) complete Done LOW none
Track D (Decisions/validations) complete Done LOW none
Track E (Corrections/subplans) complete Done LOW none
Track F (ACMS/context) near complete ETA 2026-03-09 MEDIUM Strategy registry (#191), scoped view (#193), UKO Layer 1 (#574/PR #617), domain analyzers (#588/PR #611) all MERGED. Remaining: repo indexing (#195, PR #610 in review), UKO Indexer (PR #612 in review), strategy coordinator (#192, Jeff).
Track Q (Quality automation) complete Done LOW maintenance only
Track T (Testing) strong progress ETA ongoing MEDIUM M3 E2E merged (#494). M4 E2E merged (#495). M5 E2E (#496 Rui, In Progress). M6 E2E (#497 Brent, In Review). 8 TDD PRs in multi-round review.

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +5d ahead (103/147 = 70%; 7 more spec-gap features merged late Day 25) available LOW M3 bug fixes (DI/persistence — quick). M5 strategy coordinator (#192). Remaining M5/M6 spec-gap items.
Luis 0d (on schedule; 22/29 = 76%; LSP merged, 3 new PRs opened) available LOW M6: retry policies (#313, PR #614), devcontainer lifecycle (#514, PR #613 — 15 findings to address), container tool exec (#515, PR #616 — merge conflict). Active code reviewer.
Hamza -2d behind (17/28 = 61%; 4 issues merged Day 26, most productive day) available MEDIUM M5: repo indexing (#195, PR #610 — P0 blocker, Hamza claims fixed, awaiting re-review), UKO Indexer (PR #612 — 3 missing acceptance criteria, PM pinged). M6: temporal data model (PR #615 — merge conflict), resource type inheritance (#513, PR #618 — merge conflict). UKO L1 (#617) and analyzers (#611) merged.
Aditya +1d ahead (31/32 = 97%) available LOW M6: cost estimation actor (#209). Event bus merged.
Brent 0d (on schedule; 33/45 = 73%; 8 TDD PRs in review, thorough reviewer) available LOW Respond to final review feedback on TDD PRs (#566-#568, #591-#596). M6: CLI polish (#210). M6 E2E (#497). Active reviewer on Hamza/Luis PRs.
Rui -2d behind (2/5 = 40%; both acceptance gates merged) available MEDIUM M5 E2E (#496) — In Progress. Available for new test assignments.
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of Day 26 (2026-03-06). Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries in the "No Milestone" row excluded from totals. PRs excluded. Issues with State/Completed but not formally closed count as completed.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 28/28 16/16 2/2 4/4 10/10 0/0 34/34 94/94
M2 26/26 13/13 4/4 1/1 5/5 0/0 4/4 53/53
M3 8/11 0/0 2/2 4/4 4/11 0/1 7/7 25/36
M4 8/9 0/0 4/6 4/4 5/6 0/1 3/4 24/30
M5 15/22 1/1 2/2 2/5 3/3 0/1 4/4 27/38
M6 14/17 0/1 5/7 0/6 5/9 1/1 1/1 26/42
M6+ 0/13 1/1 3/6 0/4 1/1 1/1 1/1 7/27
Total 99/126 31/32 22/29 15/28 33/45 2/5 54/55 256/320

Story point allocation

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 188/188 94/94 16/16 19/19 71/71 - 95/95 483/483
M2 176/176 86/86 29/29 5/5 21/21 - 5/5 322/322
M3 58/67 - 21/21 23/23 14/35 0/1 45/45 161/192
M4 47/47 - 34/44 32/32 24/27 0/1 1/1 138/152
M5 124/164 8/8 16/16 16/37 14/14 0/1 17/17 195/257
M6 116/137 0/8 52/68 0/42 30/52 8/8 0/0 206/315
M6+ 0/93 8/8 24/58 0/29 5/5 8/8 0/0 45/201
Total 709/872 196/204 192/252 95/187 179/225 16/19 163/163 1550/1922

2026-03-07 (Day 27)

  • Timeline reference: Day 7/M1 = 2026-02-15, Day 14/M2 = 2026-02-22, Day 18/M3 = 2026-02-26, Day 22/M4 = 2026-03-02, Day 26/M5 = 2026-03-06, Day 30/M6 = 2026-03-10
  • Summary: Project ~4-5d behind schedule (steady). M5 target (Day 26, yesterday) missed as expected. Two new Critical bugs reported by Brent (#620 skill add not registering, #621 tool add not registering). Full TDD compliance sweep: 9 TDD counterpart issues created (#630-#638) for all 9 open bugs. TDD infrastructure (#627-#629) triaged, labeled, milestoned to v3.4.0, assigned to Brent. Bug priority corrections applied to #554, #563, #606 (upgraded to Critical/Must Have). Redundant bug repo-level labels cleaned up. 13 open PRs reviewed — PRs #591, #593, #594 (Brent's bug fixes) appear ready for merge. 5 PRs have merge conflicts (all Hamza except #616 Luis). Hamza's PR #612 still has 43 unanswered review findings.

Day 27 highlights:

  • Brent reported 2 new bugs: #620 (agents skill add followed by skill list shows nothing) and #621 (agents tool add followed by tool list shows nothing). Both likely share a common persistence root cause — possibly session.flush() without session.commit() or registry not updated after DB write, similar to #589/#590.
  • TDD compliance sweep: 9 TDD counterpart issues created per CONTRIBUTING.md Bug Fix Workflow: #630 (for #554), #631 (for #570), #632 (for #589), #633 (for #590), #634 (for #592), #635 (for #563), #636 (for #606), #637 (for #620), #638 (for #621). All labeled Type/Testing, Priority/Critical, MoSCoW/Must have, State/Unverified, Points/2, assigned to brent.edwards.
  • TDD infrastructure triaged: #627 (Behave @tdd_expected_fail handler), #628 (Robot tdd_expected_fail handler), #629 (CI quality gate) — all given Type/Feature, Priority/High, MoSCoW/Must have, Points/5, milestone v3.4.0, assigned to brent.edwards.
  • Bug priority corrections: #554, #563, #606 upgraded from Priority/Medium or Priority/High to Priority/Critical and from MoSCoW/Should have to MoSCoW/Must have (bugs are always top priority per policy).
  • Label cleanup: Redundant repo-level bug label (ID 892) removed from #554, #563, #620, #621 — replaced with org-level Type/Bug (ID 849).
  • New bugs triaged: #620 and #621 given Type/Bug, Priority/Critical, MoSCoW/Must have, State/Unverified, Points/3, milestone v3.2.0, assigned to freemo.
  • PRs #591, #593, #594 (Brent's bug fixes for project persist, project show, actor list) have completed all review rounds, been rebased, and appear ready for final merge approval.
  • 5 PRs with merge conflicts: #618, #616, #615, #612, #610 — 4 of these are Hamza's, 1 is Luis's. Authors need to rebase.
  • Hamza's review backlog: PR #612 (UKO Indexer) has 43 review findings with no author response. PR #610 (repo indexing) has P0 blocker (missing migration). Both are blocking M5 progress.
  • No new PRs opened today. No PRs merged today. Net issue change: +12 new issues (9 TDD + triage adjustments).

Status: M5 ETA ~Mar 9-10 (+3-4d from target). M3 closure delayed by new bugs #620/#621 but PRs #591, #593, #594 should merge soon. M4 needs #606 fix (plan correct tree wiring) + #563 fix (race condition). M6 ETA ~Mar 14 (+4d). The immediate priority is: (1) merge PRs #591, #593, #594 (ready now); (2) investigate #620/#621 root cause; (3) get Hamza to respond to PR #612 findings and rebase conflicted PRs.

Milestone forecast

Milestone Target -> ETA Delta Risk
M1 (v3.0.0) (2026-02-15) -> Done +13d actual COMPLETE
M2 (v3.1.0) (2026-02-22) -> Done +6d actual COMPLETE
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-09 +12d MEDIUM — 3 bug-fix PRs ready to merge (#591, #593, #594). 2 new Critical bugs (#620, #621) need investigation. 9 TDD counterpart issues created. TDD infra (#627-#629) blocks CI.
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-08 +6d LOW-MEDIUM — Acceptance gate merged. 2 bugs (#563 race condition, #606 plan correct). Security epic (#362). PR #619 in review for #563.
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-10 +4d MEDIUM-HIGH — Strategy registry and scoped view merged. Remaining: repo indexing (#195, PR #610 P0 blocker), UKO Indexer (PR #612, 43 findings no response), strategy coordinator (#192, Jeff), TDD infra (#627-#629), M5 E2E (#496, Rui).
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-14 +4d MEDIUM — ~16 open issues. Retry policies (#614), temporal data model (#615), resource type inheritance (#618) in review. Devcontainer lifecycle (#613) has 15+ findings. Container tool exec (#616) has merge conflict.

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) complete Done LOW none
Track B (Resources + sandbox) complete Done LOW 11 bugs in v3.2.0/v3.3.0 (TDD + fixes in various stages)
Track C (Actors/tools/skills/MCP) complete Done LOW 2 new bugs (#620, #621) in skill/tool add
Track D (Decisions/validations) complete Done LOW Bug #606 (plan correct tree wiring) needs fix
Track E (Corrections/subplans) complete Done LOW none
Track F (ACMS/context) near complete ETA 2026-03-10 MEDIUM Remaining: repo indexing (#195, PR #610 P0 blocker), UKO Indexer (PR #612 — 43 findings no response), strategy coordinator (#192, Jeff).
Track Q (Quality automation) complete Done LOW TDD infra (#627-#629) is new quality work
Track T (Testing) strong progress ETA ongoing MEDIUM M5 E2E (#496 Rui, In Progress). M6 E2E (#497 Brent). 9 TDD counterpart issues created. TDD infra (#627-#629) needed for CI.

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +5d ahead (103/147 = 70%) available LOW-MEDIUM URGENT: investigate #620/#621 (skill/tool add not registering). Then M5 coordinator (#192). M3 remaining bug fixes.
Luis 0d (on schedule; 22/29 = 76%) available LOW M6: retry policies (#313, PR #614), devcontainer lifecycle (#514, PR #613 — 15+ findings), container tool exec (#515, PR #616 — merge conflict). Active reviewer.
Hamza -3d behind (17/28 = 61%) available HIGH URGENT: respond to 43 findings on PR #612, fix P0 on PR #610, rebase 4 conflicted PRs (#618, #615, #612, #610). M5 progress blocked on his response.
Aditya +1d ahead (31/32 = 97%) available LOW M6: cost estimation actor (#209).
Brent 0d (on schedule; 33/45 = 73%) available LOW PRs #591, #593, #594 ready for merge. TDD infra (#627-#629) assigned. M6: CLI polish (#210), M6 E2E (#497). Active reviewer.
Rui -2d behind (2/5 = 40%) available MEDIUM M5 E2E (#496) — In Progress. Available for new test assignments after.
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of Day 27 (2026-03-07). Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries excluded. PRs excluded. Issues with State/Completed but not formally closed count as completed. Includes newly created TDD issues (#630-#638) and triaged issues (#620, #621, #627-#629).

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 28/28 16/16 2/2 4/4 10/10 0/0 34/34 94/94
M2 26/26 13/13 4/4 1/1 5/5 0/0 4/4 53/53
M3 8/13 0/0 2/2 4/4 4/18 0/1 7/7 25/45
M4 8/10 0/0 4/6 4/4 5/8 0/1 3/4 24/33
M5 15/22 1/1 2/2 2/5 3/6 0/1 4/4 27/41
M6 14/17 0/1 5/7 0/6 5/9 1/1 1/1 26/42
M6+ 0/13 1/1 3/6 0/4 1/1 1/1 1/1 7/27
Total 99/129 31/32 22/29 15/28 33/57 2/5 54/55 256/335

Story point allocation

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 188/188 94/94 16/16 19/19 71/71 - 95/95 483/483
M2 176/176 86/86 29/29 5/5 21/21 - 5/5 322/322
M3 58/73 - 21/21 23/23 14/49 0/1 45/45 161/212
M4 47/52 - 34/44 32/32 24/31 0/1 1/1 138/161
M5 124/164 8/8 16/16 16/37 14/29 0/1 17/17 195/272
M6 116/137 0/8 52/68 0/42 30/52 8/8 0/0 206/315
M6+ 0/93 8/8 24/58 0/29 5/5 8/8 0/0 45/201
Total 709/883 196/204 192/252 95/187 179/258 16/19 163/163 1550/1966

2026-03-09 (Day 29)

  • Timeline reference: Day 7/M1 = 2026-02-15, Day 14/M2 = 2026-02-22, Day 18/M3 = 2026-02-26, Day 22/M4 = 2026-03-02, Day 26/M5 = 2026-03-06, Day 30/M6 = 2026-03-10
  • Summary: Project ~4-5d behind schedule (steady). Two-phase day. Morning: Jeff completed a 7-PR bug-fix blitz (Days 28-29) closing 4 Critical bugs (#523, #524, #620, #621) and shipping 3 M5 features. PM closed 6 issues, triaged bug #647 and TDD counterpart #648, posted compliance comments on all 12 open PRs. Evening: Major workload rebalancing — Brent reduced from 15 issues / 55 SP to 10 issues / ~30 SP; TDD infrastructure (#627-#629) assigned to Luis and Rui and moved from v3.4.0 to v3.2.0 (unblocking all bug fixes); 4 new estimation domain issues (#649-#652, 26 SP) created for Aditya; PR #528 dispute resolved. Full PR compliance audit completed: all 12 PRs now have closing keywords, blocking links, assignees, and proper labels. Both Hamza and Luis responded to review escalations.

Day 29 highlights:

  • Jeff merged 7 PRs in a 2-day sprint (Days 28-29):
    • PR #626 (merged Day 28): fix(resource): call bootstrap_builtin_types during initialization — Closes #523 (fs-directory bootstrap), #524 (git-checkout bootstrap). Also removed @wip tags from TDD test scenarios and disabled global ~@wip exclusion in behave.ini.
    • PR #640 (merged Day 28): fix(skill): persist skill registration to database after add — Closes #620. Root cause: SkillService was entirely in-memory. Fixed by wiring CLI to SkillRegistryService with database persistence.
    • PR #641 (merged Day 28): fix(tool): persist tool registration to database after add — Closes #621, #638. Root cause: ToolRegistryRepository.create() called session.flush() but never session.commit(). Fixed all 5 mutating methods in repository.
    • PR #639 (merged Day 28): fix(cli): pass decision tree and influence edges to CorrectionService in plan correct handler — Closes #606. Root cause: correct_decision() never passed decision_tree or influence_edges to CorrectionService, producing single-node impact analysis.
    • PR #642 (merged Day 28): feat(security): implement Prompt Injection Mitigation (5 mechanisms) — M5 spec-gap feature.
    • PR #644 (merged Day 28): feat(guardrails): implement Plan Generation Pre-flight Guardrails (7 checks) — M5 spec-gap feature.
    • PR #643 (merged Day 29): feat(correcting-plans): implement Predictive Error Prevention (Layer 4) with Error Pattern Database — M5 spec-gap feature.
  • Bug debt reduced: M3 bugs down from 11 to 5 open (6 fixed: #523, #524, #589, #590, #620, #621). M4 bug #606 fixed (PR merged, issues #606, #636 closed). Remaining 5 bugs: #554 (session list DI), #570 (session create DI), #592 (actor list validation), #563 (M4 validation race), #647 (Container.resolve crash — new, Priority/Critical).
  • M5 accelerated: 3 new features shipped (prompt injection, guardrails, predictive error prevention). M5 completion ~83% (54 closed / 67 total).
  • Review backlog: The 12 open PRs (#528, #594-#596, #610, #612-#616, #618-#619) received PM compliance comments with action items. 5 have merge conflicts (#610, #612, #615, #616, #618). PRs #594, #595, #596 ready pending re-approval. No PRs merged from the existing backlog today.
  • Developer responses: Hamza responded on PR #610 (48/51 findings fixed — strong work, rebase needed). Luis responded on PR #613 (F25-F31 resolved). Aditya posted review on PR #595 (8 findings including F1 HIGH @unit tag).
  • No Day 28 adherence entry was written. This Day 29 entry covers both Days 28 and 29.
  • PM actions (Day 29 — full day):
    • Closed 6 issues: #569 (refactor, State/Completed), #553 (git-checkout TDD — all criteria met), #589 (project create bug), #590 (project show bug), #632 (TDD for #589), #633 (TDD for #590).

    • Created TDD issue #648 for bug #647 (Container.resolve() crash), Priority/Critical, milestone v3.2.0.

    • Added missing labels to 5 PRs (#528, #613, #614, #616, #619). Added MoSCoW/* and Points/* labels to all 12 open PRs (were missing from 11). All PRs now fully labeled.

    • Advanced 4 TDD issues (#630, #631, #634, #635) and 2 feature issues (#581 AuditService, #573 secret masking) from State/Unverified to State/Verified.

    • Upgraded #594 (Type/Bug) from Priority/Medium to Priority/High per CONTRIBUTING.md bug priority requirement.

    • Added dependency back-references to 5 bug issues (#647, #554, #570, #592, #563) linking to their TDD counterparts.

    • Posted PM status/compliance comments on all 12 open PRs with action items and deadlines.

    • Acknowledged developer responses: Hamza on PR #610, Luis on PR #613, Aditya on PR #595.

    • Workload rebalancing (9 reassignments, all confirmed via Forgejo API):

      Issue From To SP Rationale
      #627 (Behave @tdd_expected_fail) brent.edwards CoreRasurae (Luis) 5 TDD infra priority; milestone v3.4.0 → v3.2.0
      #629 (TDD quality gate) brent.edwards CoreRasurae (Luis) 5 TDD infra priority; milestone v3.4.0 → v3.2.0
      #628 (Robot @tdd_expected_fail) brent.edwards hurui200320 (Rui) 5 TDD infra priority; milestone v3.4.0 → v3.2.0
      #635 (TDD M4 validation test) brent.edwards hurui200320 (Rui) 2 Offload Brent
      #550 (Output rendering framework) brent.edwards hurui200320 (Rui) 8 Offload Brent
      #647 (Container.resolve bug) (unassigned) hurui200320 (Rui) 2 Critical bug — Rui discovered it
      #648 (TDD for #647) brent.edwards aditya 2 Pair with PR #528 estimation work
      #595 (TDD session create) CoreRasurae brent.edwards 2 Align with active branch
      #596 (TDD session list) CoreRasurae brent.edwards 2 Align with active branch
    • PR #528 dispute resolved: Aditya's estimation actor PR is the implementation of #209, not a duplicate. Assigned to @aditya, milestone v3.5.0. Hamza's code review findings acknowledged.

    • 4 new issues created (spec-gap analysis from docs/specification.md): #649 (EstimationReport domain model, 5 SP), #650 (estimation actor YAML template, 5 SP), #651 (config fallback + lifecycle hook, 8 SP), #652 (historical plan statistics service, 8 SP) — all M6, assigned to Aditya.

    • Dependency links created: #629→#627 + #628 (quality gate needs both tag handlers); #651→#649; #652→#651; #647→#648 (bug blocked by TDD per CONTRIBUTING.md). PR blocking links: #528→#209, #610→#195, #612→#578, #613→#514, #614→#313, #615→#577, #616→#515, #618→#513.

    • PR compliance fixes: Added Closes #N keywords to PR bodies (#528, #594, #612, #616, #619). Populated empty PR #616 body with Closes #515. All 12 PRs now have standard closing keywords and blocking links.

    • TDD infrastructure dependency chain RESOLVED: #627 assigned to Luis, #628 to Rui, #629 to Luis. All moved from v3.4.0 to v3.2.0. Dependency links created (#629→#627, #629→#628). The longest blocking chain in the project is now actively owned.

    • PR review bottleneck persists: 12 open PRs. PM posted compliance comments on all 12 with action items and deadlines, but formal review requests not yet assigned in Forgejo. Action: use forgejo_create_review_requests going forward..

    • Brent bottleneck RESOLVED: Reduced from 15 issues / 55 SP to 10 issues / ~30 SP via reassignment. TDD infra offloaded to Luis (#627, #629) and Rui (#628). Bug #647, #550, and #635 offloaded to Rui. #648 offloaded to Aditya.

    • PR body discipline improved: All 12 PRs now have standard Closes #N keywords and blocking links. PM populated empty PR #616 body. Action: enforce PR template with required sections in CONTRIBUTING.md.

    • Label compliance now 100%: All 12 open PRs and all 65 open issues have required State/, Type/, Priority/ labels. MoSCoW/* and Points/* labels added to all PRs.

    • Priority/Backlog label exists (ID 862) but isn't in CONTRIBUTING.md: Used by 2 post-MVP issues (#378, #398). Should be formally adopted or replaced with Priority/Low.

Status: Project ~4-5d behind schedule (steady). Mar 28 deadline safe with buffer. Post-rebalancing: Brent reduced from 55→~30 open SP. TDD infrastructure (#627-#629) now owned and on critical path — unblocks all 5 bug fixes for M3 closure. Open PRs: 12 (5 with merge conflicts). 4 new estimation domain issues created. ~406 SP remaining across all milestones; at conservative 35 SP/day, completes by ~Mar 25. Critical path: (1) Luis: complete #627 Behave TDD infra; (2) Rui: complete #628 Robot TDD infra → fix #647 critical bug; (3) Brent: merge 4 bug-fix PRs (#594-#596, #619); (4) Hamza: rebase PRs #610, #612; (5) Aditya: TDD test #648 → PR #528 review fixes.

Milestone forecast

Milestone Target -> ETA Delta Risk SP Open Velocity Note
M1 (v3.0.0) (2026-02-15) -> Done +13d actual COMPLETE 0
M2 (v3.1.0) (2026-02-22) -> Done +6d actual COMPLETE 0
M3 (v3.2.0) (2026-02-26) -> ETA 2026-03-11 +14d HIGH — 17 open issues / 50 SP (includes TDD infra moved from M5). 5 bugs open, all blocked by TDD infra (#627/#628). Bottleneck resolved: Brent reduced to 6 M3 issues; Luis owns #627/#629, Rui owns #628. New critical bug #647 assigned to Rui. 50 Parallel TDD work
M4 (v3.3.0) (2026-03-02) -> ETA 2026-03-12 +10d MEDIUM — 8 open issues / 18 SP. Race condition #563 (fix PR #619). Retry policies PR #614 clean. Security #573 assigned to Luis. #635 TDD offloaded to Rui. 18 Distributed load
M5 (v3.4.0) (2026-03-06) -> ETA 2026-03-14 +8d MEDIUM — 8 open issues / 47 SP (reduced after TDD infra moved to M3). Depends on Jeff (strategy coordinator) + Hamza (RDF pipeline). Repo indexing PR #610 needs rebase. Brent's M5 load fully completed (14/14 SP). 47 Jeff + Hamza critical
M6 (v3.5.0) (2026-03-10) -> ETA 2026-03-18 +8d MEDIUM — 20 open issues / 135 SP (includes 4 new estimation issues, 26 SP). Heaviest milestone. Aditya gained estimation domain work. Devcontainer (#613) review findings resolved. Resource inheritance (#618) + temporal data (#615) from Hamza. 135 Parallel execution
Post (v3.6.0) (2026-03-28) -> ETA 2026-03-28 0d GREEN — 20 open issues / 156 SP. 19 working days remain. Conservative capacity: 665 SP. Safe with buffer. 156 On track

Track forecast

Track Status ETA Risk Blocking
Track A (Plan lifecycle) complete Done LOW none
Track B (Resources + sandbox) complete Done LOW 5 bugs remaining in v3.2.0 (down from 11). Fix PRs #594, #595, #596 ready. TDD infra (#627/#628) needed to unblock CI quality gate.
Track C (Actors/tools/skills/MCP) complete Done LOW Bugs #620, #621 FIXED Days 28-29
Track D (Decisions/validations) complete Done LOW Bug #606 FIXED Day 28. Issues #606, #636 closed.
Track E (Corrections/subplans) complete Done LOW none
Track F (ACMS/context) near complete ETA 2026-03-10 MEDIUM Remaining: repo indexing (#195, PR #610 — Hamza responded, 48/51 findings fixed, needs rebase), UKO Indexer (PR #612 — partial response, merge conflict), strategy coordinator (#192, Jeff).
Track Q (Quality automation) complete Done LOW TDD infra (#627→Luis, #628→Rui, #629→Luis) now owned and on critical path for M3
Track T (Testing) strong progress ETA ongoing MEDIUM M5 E2E (#496 Rui, In Progress). M6 E2E (#497 Brent). TDD issues #637, #638 closed. 5 TDD issues remain (#630, #631, #634, #635, #648).

Developer forecast

Name Days Ahead/Behind Availability Risk Focus
Jeff +7d ahead (107/129 = 83%) available LOW Completed 7 PRs in 2 days. Next: M5 strategy coordinator (#192), M6 ContextFragment (#538). Near-term load ~22 SP (M5) + ~21 SP (M6).
Luis 0d (22/31 = 71%) active MEDIUM NEW: TDD infra #627 (Behave) + #629 (quality gate) — top priority, unblocks all bug fixes. Then: #581 AuditService, #573 secret masking. M6: PR #614 (retry), PR #613 (devcontainer), PR #616 (container exec). 9 open issues / ~70 SP. Responded Day 29 on PR #613 (F25-F31 resolved).
Hamza -3d behind (15/28 = 54%) available HIGH Responded Day 29 on PR #610 (48/51 findings fixed). Still needs rebase on 4 PRs (#618, #615, #612, #610). 13 open issues / ~92 SP. RDF/ACMS work is specialized — no backup.
Aditya 0d (31/37 = 84%) active LOW NEW: TDD test #648 → PR #528 review fixes → #649-#652 estimation domain (26 SP). Reviewer role: re-review PR #595. 6 open issues / ~36 SP.
Brent -1d behind (35/51 = 69%) available MEDIUM (improved from RED) Bottleneck resolved: reduced from 57 → 51 total issues (55 → ~30 open SP). Focus: merge 4 bug-fix PRs (#594, #595, #596, #619), complete TDD tests #630, #631, #634. M6: CLI polish (#210), E2E (#497).
Rui -3d behind (2/8 = 25%) active MEDIUM NEW: #647 critical bug (FIRST) → #628 Robot TDD infra → #635 TDD test → #550 output rendering. 6 open issues / ~18 SP. Fast developer — strong QA instincts.
Mike/Brian N/A standby LOW none

Task inventory

Milestone per developer as of Day 29 evening (2026-03-09), post-rebalancing. Note: Each cell is completed/total issues for that milestone/owner per Forgejo tracker. Epics and Legendaries excluded. PRs excluded. Issues with State/Completed but not formally closed count as completed. Reflects all Day 29 changes: Jeff +4 M3 bug fixes, +1 M4 bug fix, +3 M5 features; 9 reassignments; 4 new issues (#649-#652); TDD infra (#627-#629) moved from M5 to M3.

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 28/28 16/16 2/2 4/4 10/10 0/0 34/34 94/94
M2 26/26 13/13 4/4 1/1 5/5 0/0 4/4 53/53
M3 12/13 0/1 2/4 4/4 6/17 0/2 7/7 31/48
M4 9/10 0/0 4/6 4/4 5/7 0/2 3/4 25/33
M5 18/22 1/1 2/2 2/5 3/3 0/1 4/4 30/38
M6 14/17 0/5 5/7 0/6 5/8 1/2 1/1 26/46
M6+ 0/13 1/1 3/6 0/4 1/1 1/1 1/1 7/27
Total 107/129 31/37 22/31 15/28 35/51 2/8 54/55 266/339

Story point allocation

Milestone Jeff Aditya Luis Hamza Brent Rui Unassigned Total
M1 188/188 94/94 16/16 19/19 71/71 - 95/95 483/483
M2 176/176 86/86 29/29 5/5 21/21 - 5/5 322/322
M3 70/73 0/2 21/31 23/23 18/47 0/6 45/45 177/227
M4 52/52 - 34/44 32/32 24/29 0/3 1/1 143/161
M5 139/164 8/8 16/16 16/37 14/14 0/1 17/17 210/257
M6 116/137 0/34 52/68 0/42 30/44 8/16 0/0 206/341
M6+ 0/93 8/8 24/58 0/29 5/5 8/8 0/0 45/201
Total 741/883 196/232 192/262 95/187 183/231 16/34 163/163 1586/1992