From 1031fd0fb18468aad3494d0f856b84cd414eff3f Mon Sep 17 00:00:00 2001 From: CleverThis Date: Tue, 14 Apr 2026 05:25:30 +0000 Subject: [PATCH 1/2] fix(agents): make bug-hunt-pool-supervisor tracking non-blocking to prevent initialization hangs --- .opencode/agents/bug-hunt-pool-supervisor.md | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-) diff --git a/.opencode/agents/bug-hunt-pool-supervisor.md b/.opencode/agents/bug-hunt-pool-supervisor.md index 101013c22..161bddef4 100644 --- a/.opencode/agents/bug-hunt-pool-supervisor.md +++ b/.opencode/agents/bug-hunt-pool-supervisor.md @@ -91,7 +91,7 @@ Each cycle: 4. **Monitor workers.** Count active workers, check for stuck sessions. -5. **Update tracking.** Every 3 cycles, create a status tracking issue via `automation-tracking-manager` with prefix `AUTO-BUG-POOL`. +5. **Update tracking (non-blocking).** Every 3 cycles, attempt to create a status tracking issue via `automation-tracking-manager` with prefix `AUTO-BUG-POOL`. This step is **best-effort** — if the call does not complete within a reasonable time or fails, skip it and continue to the next cycle. **Never block the main loop waiting for tracking.** Tracking is informational only; the supervisor's core function (module scanning and worker dispatch) must continue regardless. ## Finding Validation Gate @@ -126,3 +126,4 @@ Supervisor: Bug Hunt Pool | Agent: bug-hunt-pool-supervisor 7. **Apply labels via `forgejo-label-manager`.** Never apply labels directly or using the Forgejo MCP/task. All label operations must go through `forgejo-label-manager`. 8. **Exhaustive pagination for all list results.** Every tool call, REST/curl request, or any other command that returns a list must be treated as potentially paginated and incomplete. Always set `limit` to its maximum available value (use `limit=50` for Forgejo MCP tools; use `limit=50` or higher for direct REST/curl calls). After each list response, check whether the number of returned items equals the page size — if so, there are likely more results; fetch the next page (`page=2`, `page=3`, …) and continue until receiving a partial page. Never assume the first response is the complete result. This rule applies to every list-returning call without exception. *Examples specific to this agent (not exhaustive):* `forgejo_list_repo_issues` (default 20 — use `limit=50` and paginate to check for all existing bug issues before filing duplicates); `forgejo_list_repo_pull_requests` (same — check all open PRs that may already address a discovered bug). +9. **Tracking is non-blocking.** The `automation-tracking-manager` call in step 5 must never block the main loop. If it hangs or fails, skip it and proceed. Core functionality (module mapping, worker dispatch, monitoring) takes priority over status reporting. -- 2.52.0 From 5249c5064467f5a1d6485bfcce44bdb9118abfb7 Mon Sep 17 00:00:00 2001 From: HAL9000 Date: Tue, 14 Apr 2026 23:14:47 +0000 Subject: [PATCH 2/2] docs(timeline): update schedule adherence Day 104 (2026-04-14) MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit Add Day 104 (2026-04-14) schedule adherence entry to docs/timeline.md. - Milestone data: M3 24.2% (269/1112), M4 39.6% (111/280), M5 36.6% (140/382), M6 16.6% (216/1301), M7 31.4% (153/488), M8 41.7% (428/1027), M9 26.2% (133/507) - New v3.9.0 milestone documented (11.1%, 4/36 closed) - Scope expansion documented across all milestones since Day 100 - Overall project ~32% complete - AUTO-TIME cycle 1 — [AUTO-TIME-1] ISSUES CLOSED: #9076 --- docs/timeline.md | 95 ++++++++++++++++++++++++++++++++++++++++++++++++ 1 file changed, 95 insertions(+) diff --git a/docs/timeline.md b/docs/timeline.md index 963b1cd39..40c8570ac 100644 --- a/docs/timeline.md +++ b/docs/timeline.md @@ -5316,3 +5316,98 @@ Story points per developer per milestone. | M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | | M6+ | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | | **Total** | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~1649 SP | + +### 2026-04-14 (Day 104) + +**Summary** + +Status: Behind 35+d +Deadline risk: CRITICAL + +**Notes** + +- Day 104 update (2026-04-14). AUTO-TIME cycle 1 — [AUTO-TIME-1]. Fresh start for timeline-update-pool-supervisor. Session 4 remains active. +- Continued scope expansion across ALL milestones since Day 100: M3 grew 770→1112 (+342), M4 grew 220→280 (+60), M5 grew 313→382 (+69), M6 grew 1085→1301 (+216), M7 grew 400→488 (+88), M8 grew 944→1027 (+83), M9 grew 475→507 (+32). New milestone v3.9.0 appeared (36 total issues, 4 closed, 11.1%). +- Milestone completions (Day 104): M3 24.2% (269/1112, was 32% at Day 100 — scope explosion +342 issues), M4 39.6% (111/280, was 49%), M5 36.6% (140/382, was 43%), M6 16.6% (216/1301, was 18%), M7 31.4% (153/488, was 38%), M8 41.7% (428/1027, was 45%), M9 26.2% (133/507, was 28%). +- Apparent completion percentages dropped across all milestones due to massive scope expansion by agent-driven issue creation. Absolute closed issue counts increased slightly (M3: +20, M4: +3, M5: +7, M6: +19, M7: +3, M8: +3, M9: +2). +- All milestones M3-M7 remain overdue. M8 and M9 have no deadlines. v3.9.0 is a new milestone with no deadline. +- Overall project: ~32% complete across active milestones (v3.2.0–v3.9.0). +- PR #9024 (docs/timeline-day-104 branch) is open and awaiting merge — contains a parallel Day 104 entry from a previous AUTO-TIME session. + + +#### Milestone forecast + +| Milestone | Target -> ETA | Delta | Risk | +|-----------|---------------|-------|------| +| M1 (v3.0.0) | (2026-02-15) -> COMPLETE | 0d | COMPLETE | +| M2 (v3.1.0) | (2026-02-22) -> COMPLETE | 0d | COMPLETE | +| M3 (v3.2.0) | (2026-02-26) -> ETA 2026-07-01 | +126d | CRITICAL — 843 open issues; 24.2% complete (scope expanded 770→1112) | +| M4 (v3.3.0) | (2026-03-02) -> ETA 2026-06-01 | +91d | CRITICAL — 169 open issues; 39.6% complete (scope expanded 220→280) | +| M5 (v3.4.0) | (2026-03-06) -> ETA 2026-06-15 | +101d | HIGH — 242 open issues; 36.6% complete (scope expanded 313→382) | +| M6 (v3.5.0) | (2026-03-10) -> ETA 2026-09-01 | +175d | CRITICAL — 1085 open issues; 16.6% complete (scope expanded 1085→1301) | +| M7 (v3.6.0) | (2026-03-28) -> ETA 2026-07-15 | +109d | HIGH — 335 open issues; 31.4% complete (scope expanded 400→488) | +| M8 (v3.7.0) | (no deadline) -> ETA 2026-08-01 | N/A | HIGH — 599 open issues; 41.7% complete (scope expanded 944→1027) | +| M9 (v3.8.0) | (no deadline) -> ETA 2026-09-01 | N/A | MEDIUM — 374 open issues; 26.2% complete (scope expanded 475→507) | +| v3.9.0 | (no deadline) -> ETA TBD | N/A | LOW — 32 open issues; 11.1% complete (new milestone) | + +#### Track forecast + +| Track | Status | ETA | Risk | Blocking | +|-------|--------|-----|------|----------| +| Track A (Plan lifecycle + persistence) | Complete | Done | LOW | None | +| Track B (Projects/resources + sandbox) | In Progress | ETA 2026-06-15 | HIGH | 242 open issues in v3.4.0; scope expanded +69 issues since Day 100 | +| Track C (Actors/tools/skills/validations) | In Progress | ETA 2026-06-01 | CRITICAL | 169 open issues in v3.3.0; scope expanded +60 issues since Day 100 | +| Track D (Change tracking + apply pipeline) | In Progress | ETA 2026-07-01 | CRITICAL | 843 open issues in v3.2.0; scope expanded +342 issues since Day 100 | +| Track Q (Quality automation) | Ongoing | N/A | HIGH | Scope explosion across all milestones; agent-driven issue creation at high velocity | +| Track T (Testing) | Active | Ongoing | HIGH | All milestones overdue; massive open issue backlogs; Session 4 active | + +#### Developer forecast + +| Name | Days Ahead/Behind | Availability | Risk | Focus | +|------|-------------------|--------------|------|-------| +| Jeff | -35d behind | active | HIGH | Session 4 supervisor; M3/M4/M5 backlog clearance; architecture oversight | +| Luis | -35d behind | active | HIGH | M6 (v3.5.0) features; security hardening; PR review pool | +| Hamza | -35d behind | active | HIGH | Resource DAG; v3.6.0 features; PR reviews | +| Aditya | -35d behind | active | HIGH | M5 features; TDD counterparts; domain model work | +| Brent | -35d behind | active | HIGH | Bug fixes; TDD counterparts; quality automation | +| Rui | -35d behind | active | HIGH | TUI features; UAT bug fixes; E2E testing | +| Mike/Brian | N/A | standby | LOW | Infrastructure support | + +#### Task inventory + +Milestone per developer as of Day 104 (2026-04-14). + +| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total | +|-----------|------|--------|------|-------|-------|-----|------------|-------| +| M1 | 29/29 | 16/16 | N/A | 4/4 | 10/10 | N/A | 35/35 | 96/96 | +| M2 | 26/26 | 14/14 | N/A | 1/1 | 5/5 | N/A | 6/6 | 56/56 | +| M3 | N/A | N/A | N/A | N/A | N/A | N/A | 843 open | 269/1112 | +| M4 | N/A | N/A | N/A | N/A | N/A | N/A | 169 open | 111/280 | +| M5 | N/A | N/A | N/A | N/A | N/A | N/A | 242 open | 140/382 | +| M6 | N/A | N/A | N/A | N/A | N/A | N/A | 1085 open | 216/1301 | +| M7 | N/A | N/A | N/A | N/A | N/A | N/A | 335 open | 153/488 | +| M8 | N/A | N/A | N/A | N/A | N/A | N/A | 599 open | 428/1027 | +| M9 | N/A | N/A | N/A | N/A | N/A | N/A | 374 open | 133/507 | +| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | 32 open | 4/36 | +| **Total** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **~3479 open** | **1857/5305 closed** | + +Note: "done/total" = closed/total for that milestone. Assignee data not broken down by developer (all unassigned in API). Agent-driven issue creation continues at high velocity. Scope expanded massively since Day 100 across all milestones. + +#### Story point allocation + +Story points per developer per milestone. + +| Milestone | Jeff | Aditya | Luis | Hamza | Brent | Rui | Unassigned | Total | +|-----------|------|--------|------|-------|-------|-----|------------|-------| +| M1 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~172 SP | +| M2 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~208 SP | +| M3 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~104 SP | +| M4 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~126 SP | +| M5 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~129 SP | +| M6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | +| M7 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~100 SP | +| M8 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | +| M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | +| v3.9.0 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | +| M6+ | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | +| **Total** | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~1649 SP | -- 2.52.0