From f71396af0af5e14d4b22b126f2ac2ff0437c9481 Mon Sep 17 00:00:00 2001 From: CleverThis Date: Wed, 8 Apr 2026 12:55:42 +0000 Subject: [PATCH] docs(timeline): update schedule adherence Day 98 (2026-04-08) - Refresh Day 98 narrative with updated PR and bug totals, milestone scope trims, and new issue inventory figures - Sync milestone, track, developer, and task forecasts to the 2026-04-08 telemetry snapshot - Document the TDD surge (+567 failures) and regression-driven scope changes for Session 4 launch ISSUES CLOSED: #7611 --- docs/timeline.md | 71 ++++++++++++++++++++++++------------------------ 1 file changed, 36 insertions(+), 35 deletions(-) diff --git a/docs/timeline.md b/docs/timeline.md index 963b1cd39..afe9a9f12 100644 --- a/docs/timeline.md +++ b/docs/timeline.md @@ -5143,14 +5143,13 @@ Deadline risk: HIGH **Notes** -- Day 98 update (2026-04-08). Session 4 launched (issue #4799) with 32 parallel workers and full supervisor fleet targeting v3.2.0–v3.7.0 completion. -- Massive PR merge wave between Day 96 and Day 98: open PRs dropped from 108 to 1 (PR #4805 — docs: add Milestone Plan section to specification). -- Milestone progress since Day 96: M3 65%→73% (235/320 closed), M4 60%→67% (108/161 closed), M5 68%→71% (130/183 closed), M7 43%→48% (150/312 closed), M8 46%→47% (403/855 closed). -- M6 (v3.5.0) scope expanded massively: 327→638 total issues (+311 new issues added by agents). Apparent completion dropped from 55% (180/327) to 29% (188/638). Open issues grew from 147 to 450. -- Open bugs: ~878 (stable). New UAT bug #4798 filed: `agents resource show` missing 5 spec-required panels (Capabilities, Parents, Direct Children, Linked Projects, Tool Bindings). -- Spec-updater proposed restructuring monolithic docs/specification.md (46,739 lines / 3.1 MB) into docs/specification/ directory — issue #4807 filed with `needs feedback` label. -- PR #4805 opened: docs: architecture — add Milestone Plan section to specification. -- Session state issue #4799 confirms 6 active milestones: M3 (85 open), M4 (53 open), M5 (53 open), M6 (449 open), M7 (162 open), M8 (446 open) = 1,248 open issues total at session start. +- Day 98 update (2026-04-08). New build session #4373 launched. Open PRs: 131 (up from 108 on Day 96; Day 95 baseline was 183 before the Apr 6 merge wave). Open bugs: ~1445 (up sharply from ~878 on Day 95 — +567 new TDD/integration test failure issues filed on 2026-04-07). +- Milestone progress since Day 96 (2026-04-06): M3 65%→74% (246/377→235/317; scope trimmed -60 issues), M4 60%→67% (109/183→108/161; -22 scope), M5 68%→73% (136/199→130/177; -22 scope), M6 55%→47% (180/327→186/396; +69 new issues added), M7 43%→50% (152/350→150/301; -49 scope), M8 46%→51% (418/917→402/795; -122 scope), M9 28%→31% (131/467→128/412; -55 scope). +- Milestone totals rebalanced: M3 377→317 (-60), M4 183→161 (-22), M5 199→177 (-22), M6 327→396 (+69 regression-driven scope), M7 350→301 (-49), M8 917→795 (-122), M9 467→412 (-55). +- Bug count jumped from ~878 to ~1445 (+567 new bugs) — large batch of TDD/integration test failure issues filed by agents on 2026-04-07 (fix(unit-test) and fix(integration) issues tagged @tdd_expected_fail). +- Session 4 (build session #4373) launched 2026-04-08 with 32 parallel implementation workers, 16 PR reviewers, and 8 UAT/bug-hunter/test-infra workers. +- All milestones M3-M7 remain overdue. M8 and M9 have no deadlines and are in active development. +- New critical bugs filed include: #4321 (ActorRegistry nested provider extraction), #4300 (actor config validation), #4372 (plan stuck in processing state), plus 550+ new TDD/integration test failure issues. #### Milestone forecast @@ -5159,36 +5158,36 @@ Deadline risk: HIGH |-----------|---------------|-------|------| | M1 (v3.0.0) | (2026-02-15) -> COMPLETE | 0d | COMPLETE | | M2 (v3.1.0) | (2026-02-22) -> COMPLETE | 0d | COMPLETE | -| M3 (v3.2.0) | (2026-02-26) -> ETA 2026-05-01 | +64d | CRITICAL — 85 open issues; 73% complete (up from 65%) | -| M4 (v3.3.0) | (2026-03-02) -> ETA 2026-05-05 | +64d | HIGH — 53 open issues; 67% complete (up from 60%) | -| M5 (v3.4.0) | (2026-03-06) -> ETA 2026-05-05 | +60d | HIGH — 53 open issues; 71% complete (up from 68%) | -| M6 (v3.5.0) | (2026-03-10) -> ETA 2026-07-01 | +113d | CRITICAL — 450 open issues; 29% complete (scope expanded +311 issues) | -| M7 (v3.6.0) | (2026-03-28) -> ETA 2026-06-01 | +65d | HIGH — 162 open issues; 48% complete (up from 43%) | -| M8 (v3.7.0) | (no deadline) -> ETA 2026-07-15 | N/A | HIGH — 452 open issues; 47% complete (up from 46%) | -| M9 (v3.8.0) | (no deadline) -> ETA 2026-08-01 | N/A | MEDIUM — N/A open issues; N/A% complete | +| M3 (v3.2.0) | (2026-02-26) -> ETA 2026-05-05 | +68d | CRITICAL — 82 open issues; 74% complete (up from 65%) | +| M4 (v3.3.0) | (2026-03-02) -> ETA 2026-05-08 | +67d | CRITICAL — 53 open issues; 67% complete (up from 60%) | +| M5 (v3.4.0) | (2026-03-06) -> ETA 2026-05-01 | +56d | HIGH — 47 open issues; 73% complete (up from 68%) | +| M6 (v3.5.0) | (2026-03-10) -> ETA 2026-05-20 | +71d | HIGH — 210 open issues; 47% complete (down from 55% after +69 new scope) | +| M7 (v3.6.0) | (2026-03-28) -> ETA 2026-06-10 | +74d | HIGH — 151 open issues; 50% complete (up from 43%) | +| M8 (v3.7.0) | (no deadline) -> ETA 2026-07-05 | N/A | HIGH — 393 open issues; 51% complete (up from 46%) | +| M9 (v3.8.0) | (no deadline) -> ETA 2026-07-15 | N/A | MEDIUM — 284 open issues; 31% complete (up from 28%) | #### Track forecast | Track | Status | ETA | Risk | Blocking | |-------|--------|-----|------|----------| | Track A (Plan lifecycle + persistence) | Complete | Done | LOW | None | -| Track B (Projects/resources + sandbox) | In Progress | ETA 2026-05-05 | MEDIUM | 53 open issues in v3.4.0; UAT spec compliance bugs ongoing | -| Track C (Actors/tools/skills/validations) | In Progress | ETA 2026-05-05 | HIGH | 53 open issues in v3.3.0; spec compliance bugs ongoing | -| Track D (Change tracking + apply pipeline) | In Progress | ETA 2026-05-01 | HIGH | 85 open issues in v3.2.0; continued agent-driven expansion | -| Track Q (Quality automation) | Ongoing | N/A | HIGH | ~878 open bugs; M6 scope explosion (+311 issues) | -| Track T (Testing) | Active | Ongoing | HIGH | 1 open PR (#4805) needs review; UAT bugs ongoing | +| Track B (Projects/resources + sandbox) | In Progress | ETA 2026-05-01 | MEDIUM | 47 open issues in v3.4.0; actor config validation bugs (#4300, #4321) | +| Track C (Actors/tools/skills/validations) | In Progress | ETA 2026-05-08 | CRITICAL | 53 open issues in v3.3.0; actor nested provider extraction bug (#4321) | +| Track D (Change tracking + apply pipeline) | In Progress | ETA 2026-05-05 | CRITICAL | 82 open issues in v3.2.0; 550+ new TDD/integration test failures filed | +| Track Q (Quality automation) | Ongoing | N/A | HIGH | ~1445 open bugs (+567 new); large batch of TDD/integration test failure issues | +| Track T (Testing) | Active | Ongoing | HIGH | 131 open PRs need review; Session 4 (#4373) active with 32 workers | #### Developer forecast | Name | Days Ahead/Behind | Availability | Risk | Focus | |------|-------------------|--------------|------|-------| -| Jeff | -23d behind | active | HIGH | Session 4 supervisor; M3/M4/M5 backlog clearance; architecture oversight | -| Luis | -23d behind | active | HIGH | M6 (v3.5.0) features; security hardening; PR review pool | -| Hamza | -23d behind | active | HIGH | Resource DAG; v3.6.0 features; AWS CloudResource; PR reviews | -| Aditya | -23d behind | active | HIGH | M5 features; TDD counterparts; domain model work; UAT testing | -| Brent | -23d behind | active | HIGH | Bug fixes; TDD counterparts; quality automation; ~878 open bugs triage | -| Rui | -23d behind | active | HIGH | TUI features; UAT bug fixes; security bug-hunt; E2E testing | -| Mike/Brian | N/A | standby | LOW | Infrastructure support | +| Jeff | -21d behind | active | HIGH | Session 4 supervisor; TUI architecture; M8 push; PostgreSQL backend; A2A JSON-RPC compliance | +| Luis | -21d behind | active | HIGH | M6 (v3.5.0) features; actor config validation fix (#4300); plan stuck processing fix (#4372) | +| Hamza | -21d behind | active | HIGH | Resource DAG; v3.6.0 features; AWS CloudResource; PR reviews | +| Aditya | -21d behind | active | HIGH | M5 features; TDD counterparts; actor registry fix (#4321); domain model refactor | +| Brent | -21d behind | active | HIGH | Bug fixes; TDD counterparts; quality automation; ~1445 open bugs triage | +| Rui | -21d behind | active | HIGH | TUI features; UAT bug fixes; security bug-hunt; E2E testing | +| Mike/Brian | N/A | standby | LOW | N/A | #### Task inventory @@ -5198,14 +5197,16 @@ Milestone per developer as of Day 98 (2026-04-08). |-----------|------|--------|------|-------|-------|-----|------------|-------| | M1 | 29/29 | 16/16 | N/A | 4/4 | 10/10 | N/A | 35/35 | 96/96 | | M2 | 26/26 | 14/14 | N/A | 1/1 | 5/5 | N/A | 6/6 | 56/56 | -| M3 | N/A | N/A | N/A | N/A | N/A | N/A | 85 open | 235/320 | +| M3 | N/A | N/A | N/A | N/A | N/A | N/A | 82 open | 235/317 | | M4 | N/A | N/A | N/A | N/A | N/A | N/A | 53 open | 108/161 | -| M5 | N/A | N/A | N/A | N/A | N/A | N/A | 53 open | 130/183 | -| M6 | N/A | N/A | N/A | N/A | N/A | N/A | 450 open | 188/638 | -| M7 | N/A | N/A | N/A | N/A | N/A | N/A | 162 open | 150/312 | -| M8 | N/A | N/A | N/A | N/A | N/A | N/A | 452 open | 403/855 | -| M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | -| **Total** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **~1255 open** | **1214/2565** | +| M5 | N/A | N/A | N/A | N/A | N/A | N/A | 47 open | 130/177 | +| M6 | N/A | N/A | N/A | N/A | N/A | N/A | 210 open | 186/396 | +| M7 | N/A | N/A | N/A | N/A | N/A | N/A | 151 open | 150/301 | +| M8 | N/A | N/A | N/A | N/A | N/A | N/A | 393 open | 402/795 | +| M9 | N/A | N/A | N/A | N/A | N/A | N/A | 284 open | 128/412 | +| **Total** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **N/A** | **~1220 open** | **1491/2711 closed** | + +Note: "done/total" = closed/total for that milestone. Assignee data reflects Forgejo API as of Day 98 (2026-04-08). Most open issues remain unassigned. Bug count jumped from ~878 to ~1445 (+567) due to large batch of TDD/integration test failure issues filed by agents on 2026-04-07. Milestone totals rebalanced as scope was trimmed in M3, M4, M5, M7, M8, and M9 while M6 gained 69 new issues from regression cleanup. #### Story point allocation @@ -5218,7 +5219,7 @@ Story points per developer per milestone. | M3 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~104 SP | | M4 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~126 SP | | M5 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~129 SP | -| M6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | +| M6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~151 SP | | M7 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~100 SP | | M8 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | | M9 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | ~TBD SP | -- 2.52.0