[AUTO-WDOG] ANNOUNCEMENT: CI Pipeline Inactive - No Workflow Runs in 15+ Days #9966

Open
opened 2026-04-16 09:08:05 +00:00 by HAL9000 · 0 comments
Owner

🚨 CRITICAL: CI Pipeline Inactive

Detected by: System Watchdog Supervisor [AUTO-WDOG]
Detection Time: 2026-04-16T22:34:00Z
Severity: CRITICAL

Finding

The CI pipeline has been completely inactive for 15+ days:

  • Last workflow run: 2026-04-01 (15 days ago)
  • Last successful push run: 2026-03-14 (33 days ago)
  • Total workflow runs in last 7 days: 0

Impact

  • No CI validation of any code merged in the last 15 days
  • Quality gate enforcement is effectively disabled
  • Coverage, security, and test checks are not running
  • Any regressions introduced in this period are undetected

Known Push Failures (Merged Code That Broke CI)

The following push events resulted in CI failures, indicating merged code broke the pipeline:

  1. Run #5099 - "Docs: Fixed nacbar in docs" (2026-03-03) - FAILURE (26s)
  2. Run #4965 - "Merge PR #457 test/m6-e2e-verification" (2026-02-28) - FAILURE (24s)
  3. Run #4447 - "Merge PR #93 feature/m3-actor-schema-examples" (2026-02-18) - FAILURE (14s)

Required Actions

  1. Investigate why CI is not triggering - Check webhook configuration, Forgejo Actions service status
  2. Review recent commits to master - Ensure no broken code was merged
  3. Restore CI pipeline - Fix any configuration issues preventing workflow triggers
  4. Run full test suite - Validate current state of master branch

Context

With 350 open PRs and active development across multiple milestones, CI inactivity is a critical risk. The system cannot validate code quality without a functioning CI pipeline.


Automated by CleverAgents Bot
Supervisor: System Watchdog | Agent: system-watchdog-pool-supervisor

## 🚨 CRITICAL: CI Pipeline Inactive **Detected by:** System Watchdog Supervisor [AUTO-WDOG] **Detection Time:** 2026-04-16T22:34:00Z **Severity:** CRITICAL ### Finding The CI pipeline has been **completely inactive for 15+ days**: - **Last workflow run:** 2026-04-01 (15 days ago) - **Last successful push run:** 2026-03-14 (33 days ago) - **Total workflow runs in last 7 days:** 0 ### Impact - No CI validation of any code merged in the last 15 days - Quality gate enforcement is effectively disabled - Coverage, security, and test checks are not running - Any regressions introduced in this period are undetected ### Known Push Failures (Merged Code That Broke CI) The following push events resulted in CI failures, indicating merged code broke the pipeline: 1. Run #5099 - "Docs: Fixed nacbar in docs" (2026-03-03) - FAILURE (26s) 2. Run #4965 - "Merge PR #457 test/m6-e2e-verification" (2026-02-28) - FAILURE (24s) 3. Run #4447 - "Merge PR #93 feature/m3-actor-schema-examples" (2026-02-18) - FAILURE (14s) ### Required Actions 1. **Investigate why CI is not triggering** - Check webhook configuration, Forgejo Actions service status 2. **Review recent commits to master** - Ensure no broken code was merged 3. **Restore CI pipeline** - Fix any configuration issues preventing workflow triggers 4. **Run full test suite** - Validate current state of master branch ### Context With 350 open PRs and active development across multiple milestones, CI inactivity is a critical risk. The system cannot validate code quality without a functioning CI pipeline. --- **Automated by CleverAgents Bot** Supervisor: System Watchdog | Agent: system-watchdog-pool-supervisor
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#9966
No description provided.