[AUTO-SPEC] Status: Spec Update (Cycle 6) #9913

Closed
opened 2026-04-16 01:37:08 +00:00 by HAL9000 · 0 comments
Owner

Metadata

  • Commit: c9dc70004ca53906630312210f1c686e023554a7 (latest master SHA, unchanged since Cycle 4)
  • Branch: automation/spec-update-cycle-6

Background and Context

This is an automated status report generated by the Spec Update Supervisor as part of the ongoing Spec Evolution automation pool (Session 5, #9865). The supervisor periodically checks the state of open spec proposals, open spec PRs, and master branch activity, then files a status issue to provide human-readable visibility into the cycle's findings.

Cycle 6 is an idle cycle: no new merges to master have occurred since Cycle 4, no new high-priority discrepancies were found during the proactive deep scan completed in Cycle 5, and all existing proposals are awaiting human feedback (none exceeding the 24-hour threshold).

Expected Behavior

The status issue accurately reflects the current state of all open spec proposals, open spec PRs, and master branch activity at the time of generation. Humans reviewing this issue can quickly assess whether any action is required.

Acceptance Criteria

  • All open spec proposals are listed with their creation timestamps and approximate wait times
  • The latest master SHA is recorded and compared against the previous cycle
  • Any open spec PRs are listed (or explicitly noted as "None")
  • Remaining lower-priority discrepancies are documented for future reference
  • Actions taken during the cycle are documented
  • The next cycle interval is noted

Subtasks

  • Verify master SHA (unchanged: c9dc70004ca53906630312210f1c686e023554a7)
  • Enumerate open spec proposals awaiting feedback:
    • Issue #9859 — "Document context tier thread-safety model (threading.RLock)" (~7 hours wait)
    • Issue #9888 — "Document agents plan revert and agents plan resume CLI commands" (~3 hours wait)
    • Issue #9899 — "Update spec to reflect invariant reconciliation at every phase boundary" (~2.5 hours wait)
  • Confirm no open spec PRs
  • Confirm no proposals exceeding 24-hour threshold
  • Document remaining lower-priority discrepancies (noted, not yet proposed)
  • Record cycle summary and schedule next cycle (~15 minutes)

Definition of Done

This issue should be closed once:

  • A human has reviewed the cycle status and confirmed no action is required, or
  • The next cycle's status issue supersedes this one and all referenced proposals have been resolved or escalated

Spec Update Supervisor — Cycle 6 Status

Date: 2026-04-16
Session: [AUTO-PROD-BLDR] Session 5 (#9865)
Latest master SHA: c9dc70004c (unchanged since Cycle 4)

Cycle Summary

Open Proposals Awaiting Feedback:

  • Issue #9859: "Proposal [AUTO-SPEC]: Document context tier thread-safety model (threading.RLock) in specification" — Created 2026-04-15T19:21:04Z, awaiting human approval (~7 hours)
  • Issue #9888: "[AUTO-SPEC-1]: Document agents plan revert and agents plan resume CLI commands" — Created 2026-04-15T23:31:50Z, awaiting human approval (~3 hours)
  • Issue #9899: "[AUTO-SPEC-2]: Update spec to reflect invariant reconciliation at every phase boundary" — Created 2026-04-15T23:59:30Z, awaiting human approval (~2.5 hours)

Open Spec PRs: None

Recent Activity:

  • No new merges to master since Cycle 4
  • All proposals awaiting human feedback (none > 24 hours yet)
  • No spec PRs to monitor
  • Proactive deep scan completed in Cycle 5 — no new high-priority discrepancies found

Remaining Lower-Priority Discrepancies (Noted, Not Yet Proposed):

  • Additional CLI groups (audit, cleanup, db, auto-debug, repl, repo, server) — likely admin/internal tools
  • Extended decision types beyond spec's explicit list (IMPLEMENTATION_CHOICE, RESOURCE_SELECTION, TOOL_INVOCATION, ERROR_RECOVERY, VALIDATION_RESPONSE, USER_INTERVENTION)
  • Plan data extensions (reversion_count, last_completed_step, effective_profile_snapshot, review_actor, apply_actor)
  • Correction lifecycle extra states (ANALYZING, CANCELLED, REJECTED)

Actions Taken This Cycle:

  • Verified master SHA unchanged
  • Confirmed all proposals still open and awaiting feedback
  • No new discrepancies requiring immediate action

Next Cycle: ~15 minutes


Automated by CleverAgents Bot
Supervisor: Spec Evolution | Agent: spec-update-pool-supervisor


Automated by CleverAgents Bot
Agent: new-issue-creator

## Metadata - **Commit**: `c9dc70004ca53906630312210f1c686e023554a7` (latest master SHA, unchanged since Cycle 4) - **Branch**: `automation/spec-update-cycle-6` ## Background and Context This is an automated status report generated by the Spec Update Supervisor as part of the ongoing Spec Evolution automation pool (Session 5, [#9865](https://git.cleverthis.com/cleveragents/cleveragents-core/issues/9865)). The supervisor periodically checks the state of open spec proposals, open spec PRs, and master branch activity, then files a status issue to provide human-readable visibility into the cycle's findings. Cycle 6 is an idle cycle: no new merges to master have occurred since Cycle 4, no new high-priority discrepancies were found during the proactive deep scan completed in Cycle 5, and all existing proposals are awaiting human feedback (none exceeding the 24-hour threshold). ## Expected Behavior The status issue accurately reflects the current state of all open spec proposals, open spec PRs, and master branch activity at the time of generation. Humans reviewing this issue can quickly assess whether any action is required. ## Acceptance Criteria - [ ] All open spec proposals are listed with their creation timestamps and approximate wait times - [ ] The latest master SHA is recorded and compared against the previous cycle - [ ] Any open spec PRs are listed (or explicitly noted as "None") - [ ] Remaining lower-priority discrepancies are documented for future reference - [ ] Actions taken during the cycle are documented - [ ] The next cycle interval is noted ## Subtasks - [x] Verify master SHA (unchanged: `c9dc70004ca53906630312210f1c686e023554a7`) - [x] Enumerate open spec proposals awaiting feedback: - [x] Issue #9859 — "Document context tier thread-safety model (threading.RLock)" (~7 hours wait) - [x] Issue #9888 — "Document agents plan revert and agents plan resume CLI commands" (~3 hours wait) - [x] Issue #9899 — "Update spec to reflect invariant reconciliation at every phase boundary" (~2.5 hours wait) - [x] Confirm no open spec PRs - [x] Confirm no proposals exceeding 24-hour threshold - [x] Document remaining lower-priority discrepancies (noted, not yet proposed) - [x] Record cycle summary and schedule next cycle (~15 minutes) ## Definition of Done This issue should be closed once: - A human has reviewed the cycle status and confirmed no action is required, **or** - The next cycle's status issue supersedes this one and all referenced proposals have been resolved or escalated --- ## Spec Update Supervisor — Cycle 6 Status **Date**: 2026-04-16 **Session**: [AUTO-PROD-BLDR] Session 5 (#9865) **Latest master SHA**: c9dc70004ca53906630312210f1c686e023554a7 (unchanged since Cycle 4) ### Cycle Summary **Open Proposals Awaiting Feedback:** - Issue #9859: "Proposal [AUTO-SPEC]: Document context tier thread-safety model (threading.RLock) in specification" — Created 2026-04-15T19:21:04Z, awaiting human approval (~7 hours) - Issue #9888: "[AUTO-SPEC-1]: Document agents plan revert and agents plan resume CLI commands" — Created 2026-04-15T23:31:50Z, awaiting human approval (~3 hours) - Issue #9899: "[AUTO-SPEC-2]: Update spec to reflect invariant reconciliation at every phase boundary" — Created 2026-04-15T23:59:30Z, awaiting human approval (~2.5 hours) **Open Spec PRs:** None **Recent Activity:** - No new merges to master since Cycle 4 - All proposals awaiting human feedback (none > 24 hours yet) - No spec PRs to monitor - Proactive deep scan completed in Cycle 5 — no new high-priority discrepancies found **Remaining Lower-Priority Discrepancies (Noted, Not Yet Proposed):** - Additional CLI groups (audit, cleanup, db, auto-debug, repl, repo, server) — likely admin/internal tools - Extended decision types beyond spec's explicit list (IMPLEMENTATION_CHOICE, RESOURCE_SELECTION, TOOL_INVOCATION, ERROR_RECOVERY, VALIDATION_RESPONSE, USER_INTERVENTION) - Plan data extensions (reversion_count, last_completed_step, effective_profile_snapshot, review_actor, apply_actor) - Correction lifecycle extra states (ANALYZING, CANCELLED, REJECTED) **Actions Taken This Cycle:** - Verified master SHA unchanged - Confirmed all proposals still open and awaiting feedback - No new discrepancies requiring immediate action **Next Cycle:** ~15 minutes --- **Automated by CleverAgents Bot** Supervisor: Spec Evolution | Agent: spec-update-pool-supervisor --- **Automated by CleverAgents Bot** Agent: new-issue-creator
HAL9000 2026-04-16 09:02:51 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#9913
No description provided.