Background and Context

This is an automated status report generated by the Spec Update Supervisor as part of the ongoing Spec Evolution automation pool (Session 5, #9865). The supervisor periodically checks the state of open spec proposals, open spec PRs, and master branch activity, then files a status issue to provide human-readable visibility into the cycle's findings.

Cycle 5 is an idle cycle: no new merges to master have occurred since Cycle 4, no new discrepancies were identified, and all existing proposals are awaiting human feedback (none exceeding the 24-hour threshold).

Expected Behavior

The status issue accurately reflects the current state of all open spec proposals, open spec PRs, and master branch activity at the time of generation. Humans reviewing this issue can quickly assess whether any action is required.

Acceptance Criteria

  • All open spec proposals are listed with their creation timestamps and approximate wait times
  • The latest master SHA is recorded and compared against the previous cycle
  • Any open spec PRs are listed (or explicitly noted as "None")
  • Actions taken during the cycle are documented
  • The next cycle interval is noted

Subtasks

  • Verify master SHA (unchanged: c9dc70004ca53906630312210f1c686e023554a7)
  • Enumerate open spec proposals awaiting feedback:
    • Issue #9859 — "Document context tier thread-safety model (threading.RLock)" (~7 hours wait)
    • Issue #9888 — "Document agents plan revert and agents plan resume CLI commands" (~3 hours wait)
    • Issue #9899 — "Update spec to reflect invariant reconciliation at every phase boundary" (~2 hours wait)
  • Confirm no open spec PRs
  • Confirm no proposals exceeding 24-hour threshold
  • Record cycle summary and schedule next cycle (~15 minutes)

Definition of Done

This issue should be closed once:

  • A human has reviewed the cycle status and confirmed no action is required, or
  • The next cycle's status issue supersedes this one and all referenced proposals have been resolved or escalated

Spec Update Supervisor — Cycle 5 Status

Date: 2026-04-16
Session: [AUTO-PROD-BLDR] Session 5 (#9865)
Latest master SHA: c9dc70004c (unchanged since Cycle 4)

Cycle Summary

Open Proposals Awaiting Feedback:

  • Issue #9859: "Proposal [AUTO-SPEC]: Document context tier thread-safety model (threading.RLock) in specification" — Created 2026-04-15T19:21:04Z, awaiting human approval (~7 hours)
  • Issue #9888: "[AUTO-SPEC-1]: Document agents plan revert and agents plan resume CLI commands" — Created 2026-04-15T23:31:50Z, awaiting human approval (~3 hours)
  • Issue #9899: "[AUTO-SPEC-2]: Update spec to reflect invariant reconciliation at every phase boundary" — Created 2026-04-15T23:59:30Z, awaiting human approval (~2 hours)

Open Spec PRs: None

Recent Activity:

  • No new merges to master since last cycle
  • All proposals awaiting human feedback (none > 24 hours yet)
  • No spec PRs to monitor

Actions Taken This Cycle:

  • Verified master SHA unchanged
  • Confirmed all proposals still open and awaiting feedback
  • No new discrepancies identified (idle cycle)

Next Cycle: ~15 minutes


Automated by CleverAgents Bot
Agent: new-issue-creator
Supervisor: Spec Evolution | Agent: spec-update-pool-supervisor

## Metadata - **Commit**: `c9dc70004ca53906630312210f1c686e023554a7` (latest master SHA, unchanged since Cycle 4) - **Branch**: `main` / `master` ## Background and Context This is an automated status report generated by the Spec Update Supervisor as part of the ongoing Spec Evolution automation pool (Session 5, [#9865](https://git.cleverthis.com/cleveragents/cleveragents-core/issues/9865)). The supervisor periodically checks the state of open spec proposals, open spec PRs, and master branch activity, then files a status issue to provide human-readable visibility into the cycle's findings. Cycle 5 is an idle cycle: no new merges to master have occurred since Cycle 4, no new discrepancies were identified, and all existing proposals are awaiting human feedback (none exceeding the 24-hour threshold). ## Expected Behavior The status issue accurately reflects the current state of all open spec proposals, open spec PRs, and master branch activity at the time of generation. Humans reviewing this issue can quickly assess whether any action is required. ## Acceptance Criteria - [ ] All open spec proposals are listed with their creation timestamps and approximate wait times - [ ] The latest master SHA is recorded and compared against the previous cycle - [ ] Any open spec PRs are listed (or explicitly noted as "None") - [ ] Actions taken during the cycle are documented - [ ] The next cycle interval is noted ## Subtasks - [x] Verify master SHA (unchanged: `c9dc70004ca53906630312210f1c686e023554a7`) - [x] Enumerate open spec proposals awaiting feedback: - [x] Issue #9859 — "Document context tier thread-safety model (threading.RLock)" (~7 hours wait) - [x] Issue #9888 — "Document agents plan revert and agents plan resume CLI commands" (~3 hours wait) - [x] Issue #9899 — "Update spec to reflect invariant reconciliation at every phase boundary" (~2 hours wait) - [x] Confirm no open spec PRs - [x] Confirm no proposals exceeding 24-hour threshold - [x] Record cycle summary and schedule next cycle (~15 minutes) ## Definition of Done This issue should be closed once: - A human has reviewed the cycle status and confirmed no action is required, **or** - The next cycle's status issue supersedes this one and all referenced proposals have been resolved or escalated --- ## Spec Update Supervisor — Cycle 5 Status **Date**: 2026-04-16 **Session**: [AUTO-PROD-BLDR] Session 5 (#9865) **Latest master SHA**: c9dc70004ca53906630312210f1c686e023554a7 (unchanged since Cycle 4) ### Cycle Summary **Open Proposals Awaiting Feedback:** - Issue #9859: "Proposal [AUTO-SPEC]: Document context tier thread-safety model (threading.RLock) in specification" — Created 2026-04-15T19:21:04Z, awaiting human approval (~7 hours) - Issue #9888: "[AUTO-SPEC-1]: Document agents plan revert and agents plan resume CLI commands" — Created 2026-04-15T23:31:50Z, awaiting human approval (~3 hours) - Issue #9899: "[AUTO-SPEC-2]: Update spec to reflect invariant reconciliation at every phase boundary" — Created 2026-04-15T23:59:30Z, awaiting human approval (~2 hours) **Open Spec PRs:** None **Recent Activity:** - No new merges to master since last cycle - All proposals awaiting human feedback (none > 24 hours yet) - No spec PRs to monitor **Actions Taken This Cycle:** - Verified master SHA unchanged - Confirmed all proposals still open and awaiting feedback - No new discrepancies identified (idle cycle) **Next Cycle:** ~15 minutes --- **Automated by CleverAgents Bot** Agent: new-issue-creator Supervisor: Spec Evolution | Agent: spec-update-pool-supervisor
HAL9000 2026-04-16 09:02:53 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#9908
No description provided.