[AUTO-MERGE] Status: STARTING UP (Cycle 3) #9882

Closed
opened 2026-04-15 23:19:07 +00:00 by HAL9000 · 0 comments
Owner

Summary:
PR Merge Pool Supervisor is initializing. Beginning next cycle to collect and process all open PRs. Target milestones: v3.2.0 through v3.7.0. There are approximately 302 open PRs to process.

Details:

  • Session started: 2026-04-15
  • Target milestones: v3.2.0 - v3.7.0
  • Merge criteria: 1+ approving review, no REQUEST_CHANGES, all CI checks pass (lint, typecheck, unit_tests, integration_tests, coverage), milestone assigned, Type/ label, issue reference (Closes #N), no merge conflicts
  • Merge style: squash

Status: BLOCKED - NO APPROVED PRs FOUND
Cycle: 3
Last updated: 2026-04-15

Action taken: Sleeping 5 minutes then starting cycle 3 to re-check for any newly approved PRs.

Summary of current scan:

  • Total open PRs scanned: 302 (7 pages of 50 each, last page had 2)
  • PRs with "Needs Feedback" label (excluded): ~15 PRs
  • PRs with milestone in target range (v3.2.0-v3.7.0): ~200+ PRs
  • PRs with Type/ label AND milestone: ~100+ PRs
  • PRs with APPROVED reviews: 0 (ZERO)
  • PRs with REQUEST_CHANGES (unresolved): ALL checked PRs

Common blocking issues found across PRs:

  1. Missing CHANGELOG.md updates
  2. Missing CONTRIBUTORS.md updates
  3. Missing "ISSUES CLOSED: #N" commit footer
  4. CI failures (lint, typecheck, unit_tests, integration_tests)
  5. Missing BDD tests or Robot Framework integration tests
  6. Missing milestone or Type/ label (some PRs)

Groups analysis:

  • Group (a) CI passing + approval + stale without conflicts: 0 PRs
  • Group (b) CI passing + approval + stale with conflicts: 0 PRs
  • Group (c) CI failing + approval + stale: 0 PRs
  • Group (d) Everything else: ALL 302 PRs

Next cycle plan:

  • Re-check for any newly approved PRs in cycle 3.

Bot signature:

Automated by CleverAgents Bot
Supervisor: PR Merge Pool | Agent: pr-merge-pool-supervisor

Summary: PR Merge Pool Supervisor is initializing. Beginning next cycle to collect and process all open PRs. Target milestones: v3.2.0 through v3.7.0. There are approximately 302 open PRs to process. Details: - Session started: 2026-04-15 - Target milestones: v3.2.0 - v3.7.0 - Merge criteria: 1+ approving review, no REQUEST_CHANGES, all CI checks pass (lint, typecheck, unit_tests, integration_tests, coverage), milestone assigned, Type/ label, issue reference (Closes #N), no merge conflicts - Merge style: squash Status: BLOCKED - NO APPROVED PRs FOUND Cycle: 3 Last updated: 2026-04-15 Action taken: Sleeping 5 minutes then starting cycle 3 to re-check for any newly approved PRs. Summary of current scan: - Total open PRs scanned: 302 (7 pages of 50 each, last page had 2) - PRs with "Needs Feedback" label (excluded): ~15 PRs - PRs with milestone in target range (v3.2.0-v3.7.0): ~200+ PRs - PRs with Type/ label AND milestone: ~100+ PRs - PRs with APPROVED reviews: 0 (ZERO) - PRs with REQUEST_CHANGES (unresolved): ALL checked PRs Common blocking issues found across PRs: 1. Missing CHANGELOG.md updates 2. Missing CONTRIBUTORS.md updates 3. Missing "ISSUES CLOSED: #N" commit footer 4. CI failures (lint, typecheck, unit_tests, integration_tests) 5. Missing BDD tests or Robot Framework integration tests 6. Missing milestone or Type/ label (some PRs) Groups analysis: - Group (a) CI passing + approval + stale without conflicts: 0 PRs - Group (b) CI passing + approval + stale with conflicts: 0 PRs - Group (c) CI failing + approval + stale: 0 PRs - Group (d) Everything else: ALL 302 PRs Next cycle plan: - Re-check for any newly approved PRs in cycle 3. Bot signature: --- **Automated by CleverAgents Bot** Supervisor: PR Merge Pool | Agent: pr-merge-pool-supervisor
HAL9000 2026-04-16 09:02:58 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#9882
No description provided.