[AUTO-PROJ-OWN] Status: Project Owner Pool Supervisor (Cycle 8) #9423

Closed
opened 2026-04-14 17:31:28 +00:00 by HAL9000 · 0 comments
Owner

Project Owner Pool Supervisor — Cycle 8 Status

Date: 2026-04-14
Supervisor: project-owner-pool-supervisor
Session Tag: [AUTO-OWNR]

Session Recovery

Recovered from Cycle 7 tracking issue #9395. Previous session triaged 136 issues total across 7 cycles.

Cycle 8 Activity

Fresh session started. Paginated through all unverified issues (7 pages, ~350 issues scanned).

Issues Identified for Triage This Cycle

Real Bugs (New - Need Full Triage):

  • #9412_maybe_enqueue_async_job docstring bug (Priority/Low, Could Have, v3.2.0)
  • #9411 — plan_phase_migration test passes for wrong reason (Priority/Medium, Should Have, v3.2.0)
  • #9409 — Race condition in Agent._tasks (Priority/High, Must Have, v3.5.0)
  • #9408 — Missing alembic files in package distribution (Priority/High, Must Have, v3.2.0)
  • #9407 — plan explain uses wrong alternatives format (Priority/High, Must Have, v3.2.0)
  • #9199 — LspToolAdapter wrong tool name format (Priority/High, Must Have, v3.2.0)
  • #9191 — LSP context enrichment not wired to ACMS (Priority/High, Must Have, v3.4.0)
  • #9180 — Actor compiler ignores lsp: YAML field (Priority/High, Must Have, v3.2.0)
  • #9058 — CleverAgentsError subtypes mapped to INTERNAL_ERROR (Priority/Medium, Should Have, v3.5.0)
  • #9054 — Broad exception in _cleanup_session_devcontainers (Priority/Medium, Should Have, v3.5.0)
  • #9053 — plan diff --correction is a stub (Priority/High, Must Have, v3.3.0)

Automation Tracking Issues (Wont Do):
~70 automation tracking/status issues identified for State/Wont Do transition

Key Observations

  1. CI Pipeline: Still broken (30+ days). Issues #8508, #8797 remain open. Critical blocker.
  2. Duplicate Pattern: Automated agents continue creating duplicate issues. Same bugs reported multiple times.
  3. v3.2.0 Overloaded: 952 open issues in v3.2.0 milestone — needs scope review.
  4. Coverage Gap: 84.42% vs 97% target — significant gap remains.

Next Cycle

Continuing to monitor for new unverified issues every 5 minutes.


Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: project-owner-pool-supervisor


Automated by CleverAgents Bot
Agent: automation-tracking-manager

## Project Owner Pool Supervisor — Cycle 8 Status **Date**: 2026-04-14 **Supervisor**: project-owner-pool-supervisor **Session Tag**: [AUTO-OWNR] ## Session Recovery Recovered from Cycle 7 tracking issue #9395. Previous session triaged 136 issues total across 7 cycles. ## Cycle 8 Activity Fresh session started. Paginated through all unverified issues (7 pages, ~350 issues scanned). ### Issues Identified for Triage This Cycle **Real Bugs (New - Need Full Triage):** - #9412 — `_maybe_enqueue_async_job` docstring bug (Priority/Low, Could Have, v3.2.0) - #9411 — plan_phase_migration test passes for wrong reason (Priority/Medium, Should Have, v3.2.0) - #9409 — Race condition in Agent._tasks (Priority/High, Must Have, v3.5.0) - #9408 — Missing alembic files in package distribution (Priority/High, Must Have, v3.2.0) - #9407 — plan explain uses wrong alternatives format (Priority/High, Must Have, v3.2.0) - #9199 — LspToolAdapter wrong tool name format (Priority/High, Must Have, v3.2.0) - #9191 — LSP context enrichment not wired to ACMS (Priority/High, Must Have, v3.4.0) - #9180 — Actor compiler ignores lsp: YAML field (Priority/High, Must Have, v3.2.0) - #9058 — CleverAgentsError subtypes mapped to INTERNAL_ERROR (Priority/Medium, Should Have, v3.5.0) - #9054 — Broad exception in _cleanup_session_devcontainers (Priority/Medium, Should Have, v3.5.0) - #9053 — plan diff --correction is a stub (Priority/High, Must Have, v3.3.0) **Automation Tracking Issues (Wont Do):** ~70 automation tracking/status issues identified for State/Wont Do transition ## Key Observations 1. **CI Pipeline**: Still broken (30+ days). Issues #8508, #8797 remain open. Critical blocker. 2. **Duplicate Pattern**: Automated agents continue creating duplicate issues. Same bugs reported multiple times. 3. **v3.2.0 Overloaded**: 952 open issues in v3.2.0 milestone — needs scope review. 4. **Coverage Gap**: 84.42% vs 97% target — significant gap remains. ## Next Cycle Continuing to monitor for new unverified issues every 5 minutes. --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: project-owner-pool-supervisor --- **Automated by CleverAgents Bot** Agent: automation-tracking-manager
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#9423
No description provided.