[AUTO-IMP-POOL] Status: Implementation Pool Supervisor (Cycle 1) #8836

Open
opened 2026-04-14 02:29:46 +00:00 by HAL9000 · 0 comments
Owner

Implementation Pool Supervisor — Cycle 1 Status

Date: 2026-04-14
Worker Capacity: 32 slots
Active Workers: 0 (starting dispatch now)

Critical Context

  • Master CI is BROKEN (issue #8759/#8797) — all PRs rebased on current master fail CI
  • 354 open PRs, many with mergeable: false due to broken CI
  • No existing implementation workers running

Dispatch Plan (Cycle 1)

Priority 1 — CI Fix (blocks everything)

  • Issue #8797: Fix CI status-check resilience → dispatching Tier 1 worker

Priority 2 — PRs with Review Requesting Changes

  • PR #8640: fix(cli): actor add — review requested changes (option overrides + unsafe check)

Priority 3 — Bot PRs with CI Failures (no reviews yet)

  • PR #8636: fix(actor): validate v3 YAML via ActorConfigSchema
  • PR #8285: refactor: replace behave-parallel and pabot arg parsing
  • PR #8284: fix(boundary): reset warned_sessions
  • PR #8283: fix(sandbox): store sandbox_path in checkpoint metadata
  • PR #8280: fix(migration): reject migrations on prompt failure
  • PR #8279: fix(concurrency): add thread safety to ContextTierService
  • PR #8269: fix(tui): fix thread-safety race in reference_parser
  • PR #8265: fix(engine_cache): guard MEMORY_ENGINES with lock
  • PR #8255: fix(git_tools): eliminate TOCTOU race
  • PR #8257: fix(cleanup): invalidate sandbox_dirs_cache after purge
  • PR #8247: fix(agents): add PR diff and file list permissions
  • PR #8228: docs(agents): sync pr-merge-pool-supervisor
  • PR #8225: docs(spec): update specification — validation gate
  • PR #8195: docs(spec): add Milestone Plan navigation section
  • PR #8193: feat(agent-evolution-pool-supervisor): Add Type label
  • PR #8189: fix: --format color now emits ANSI-coloured output
  • PR #8188: feat(architecture-pool-supervisor): add milestone assignment
  • PR #8176: fix(agents): correct pr-review-pool-supervisor tracking prefix
  • PR #8119: docs(changelog): add LockService wiring
  • PR #8067: fix(concurrency): wire LockService into plan lifecycle
  • PR #8038: docs(spec): clarify resource event types

Priority 4 — Issue Workers (v3.2.0 milestone)

  • To be dispatched after PR workers fill slots

Notes

  • CI fix is prerequisite for all PR merges
  • Workers will use ci-log-fetcher to diagnose CI failures
  • Escalation tier: all start at Tier 1 (haiku)

Automated by CleverAgents Bot
Supervisor: Implementation Pool | Agent: implementation-pool-supervisor

Please create this tracking issue and return the issue number.


Automated by CleverAgents Bot
Agent: automation-tracking-manager

## Implementation Pool Supervisor — Cycle 1 Status **Date**: 2026-04-14 **Worker Capacity**: 32 slots **Active Workers**: 0 (starting dispatch now) ### Critical Context - Master CI is BROKEN (issue #8759/#8797) — all PRs rebased on current master fail CI - 354 open PRs, many with `mergeable: false` due to broken CI - No existing implementation workers running ### Dispatch Plan (Cycle 1) **Priority 1 — CI Fix (blocks everything)** - Issue #8797: Fix CI status-check resilience → dispatching Tier 1 worker **Priority 2 — PRs with Review Requesting Changes** - PR #8640: fix(cli): actor add — review requested changes (option overrides + unsafe check) **Priority 3 — Bot PRs with CI Failures (no reviews yet)** - PR #8636: fix(actor): validate v3 YAML via ActorConfigSchema - PR #8285: refactor: replace behave-parallel and pabot arg parsing - PR #8284: fix(boundary): reset warned_sessions - PR #8283: fix(sandbox): store sandbox_path in checkpoint metadata - PR #8280: fix(migration): reject migrations on prompt failure - PR #8279: fix(concurrency): add thread safety to ContextTierService - PR #8269: fix(tui): fix thread-safety race in reference_parser - PR #8265: fix(engine_cache): guard MEMORY_ENGINES with lock - PR #8255: fix(git_tools): eliminate TOCTOU race - PR #8257: fix(cleanup): invalidate sandbox_dirs_cache after purge - PR #8247: fix(agents): add PR diff and file list permissions - PR #8228: docs(agents): sync pr-merge-pool-supervisor - PR #8225: docs(spec): update specification — validation gate - PR #8195: docs(spec): add Milestone Plan navigation section - PR #8193: feat(agent-evolution-pool-supervisor): Add Type label - PR #8189: fix: --format color now emits ANSI-coloured output - PR #8188: feat(architecture-pool-supervisor): add milestone assignment - PR #8176: fix(agents): correct pr-review-pool-supervisor tracking prefix - PR #8119: docs(changelog): add LockService wiring - PR #8067: fix(concurrency): wire LockService into plan lifecycle - PR #8038: docs(spec): clarify resource event types **Priority 4 — Issue Workers (v3.2.0 milestone)** - To be dispatched after PR workers fill slots ### Notes - CI fix is prerequisite for all PR merges - Workers will use ci-log-fetcher to diagnose CI failures - Escalation tier: all start at Tier 1 (haiku) --- **Automated by CleverAgents Bot** Supervisor: Implementation Pool | Agent: implementation-pool-supervisor Please create this tracking issue and return the issue number. --- **Automated by CleverAgents Bot** Agent: automation-tracking-manager
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#8836
No description provided.