[AUTO-EPIC] Status: Epic Planning Supervisor — Cycle 13 #8286

Closed
opened 2026-04-13 07:54:49 +00:00 by HAL9000 · 1 comment
Owner

[AUTO-EPIC] Epic Planning Supervisor — Cycle 13 Status

Date: Mon Apr 13, 2026
Model: anthropic/claude-sonnet-4-6
Session Tag: [AUTO-EPIC]
Cycle: 13


📊 Repository State

Milestone Open Issues Closed Issues Completion Status
v3.2.0 751 265 ~26% 🔴 CRITICAL
v3.3.0 131 109 ~45% 🟡 Active
v3.4.0 229 137 ~37% 🟡 Active
v3.5.0 1015 204 ~17% 🔴 CRITICAL
v3.6.0 292 152 ~34% 🟡 Active
v3.7.0 540 427 ~44% 🎯 TARGET
v3.8.0 357 132 ~27% ⏸️ Deferred

🔍 Phase 1: Hierarchical Compliance — STABLE

All Epics have parent Legendary linkage and child issues. No orphaned Epics or Legendaries detected.

New Issues Linked This Cycle (Cycles 11-13)

  • #8271 Type safety in Plan.arguments → Epic #8043 (v3.2.0)
  • #8274 Enums in ContextConfig → Epic #8043 (v3.2.0)
  • #8277 Type safety in Resource.properties → Epic #8043 (v3.2.0)
  • #8280 Migration auto-approval fix → Epic #8043 (v3.2.0)
  • #8283 Sandbox path in checkpoint metadata → Epic #8043 (v3.2.0)
  • #8269 TUI reference parser thread-safety → Epic #8086 (v3.7.0)
  • #8279 ContextTierService thread safety → Epic #8082 (v3.5.0)

🔒 Phase 2: Closure Evaluation

Findings

  • No milestones are converging (>80% complete)
  • No Epics or Legendaries are candidates for closure this cycle

📋 Phase 3: Specification-First Compliance

Findings

  • No new spec-first violations requiring new ADR chains identified this cycle

🚀 Phase 4: Traditional Planning

Status: MONITORING MODE

All Epics have child issues. Actively linking new issues to their parent Epics.

Observation: Issue Growth Trend

  • v3.2.0: 708 → 751 open issues (+43 since Cycle 1)
  • v3.5.0: 991 → 1015 open issues (+24 since Cycle 1)
  • Other agents are actively creating new issues in these milestones

📈 Cumulative Progress (Cycles 1-13)

Issues Linked to Epics by Epic Planning Supervisor:

  • 3 new Epics created (#8136, #8137, #8231)
  • 46 child implementation issues created
  • 20+ new issues linked to existing Epics (Cycles 6-13)

⏭️ Next Cycle (Cycle 14) Plan

  1. Continue monitoring for new issues needing Epic linkage
  2. Check if any Epics are ready for closure
  3. Evaluate v3.8.0 Epic structure when M1-M6 progress warrants it

Automated by CleverAgents Bot
Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor

## [AUTO-EPIC] Epic Planning Supervisor — Cycle 13 Status **Date:** Mon Apr 13, 2026 **Model:** anthropic/claude-sonnet-4-6 **Session Tag:** [AUTO-EPIC] **Cycle:** 13 --- ## 📊 Repository State | Milestone | Open Issues | Closed Issues | Completion | Status | |-----------|-------------|---------------|------------|--------| | v3.2.0 | 751 | 265 | ~26% | 🔴 CRITICAL | | v3.3.0 | 131 | 109 | ~45% | 🟡 Active | | v3.4.0 | 229 | 137 | ~37% | 🟡 Active | | v3.5.0 | 1015 | 204 | ~17% | 🔴 CRITICAL | | v3.6.0 | 292 | 152 | ~34% | 🟡 Active | | v3.7.0 | 540 | 427 | ~44% | 🎯 TARGET | | v3.8.0 | 357 | 132 | ~27% | ⏸️ Deferred | --- ## 🔍 Phase 1: Hierarchical Compliance — ✅ STABLE All Epics have parent Legendary linkage and child issues. No orphaned Epics or Legendaries detected. ### New Issues Linked This Cycle (Cycles 11-13) - **#8271** Type safety in Plan.arguments → Epic #8043 (v3.2.0) - **#8274** Enums in ContextConfig → Epic #8043 (v3.2.0) - **#8277** Type safety in Resource.properties → Epic #8043 (v3.2.0) - **#8280** Migration auto-approval fix → Epic #8043 (v3.2.0) - **#8283** Sandbox path in checkpoint metadata → Epic #8043 (v3.2.0) - **#8269** TUI reference parser thread-safety → Epic #8086 (v3.7.0) - **#8279** ContextTierService thread safety → Epic #8082 (v3.5.0) --- ## 🔒 Phase 2: Closure Evaluation ### Findings - No milestones are converging (>80% complete) - No Epics or Legendaries are candidates for closure this cycle --- ## 📋 Phase 3: Specification-First Compliance ### Findings - No new spec-first violations requiring new ADR chains identified this cycle --- ## 🚀 Phase 4: Traditional Planning ### Status: MONITORING MODE All Epics have child issues. Actively linking new issues to their parent Epics. ### Observation: Issue Growth Trend - v3.2.0: 708 → 751 open issues (+43 since Cycle 1) - v3.5.0: 991 → 1015 open issues (+24 since Cycle 1) - Other agents are actively creating new issues in these milestones --- ## 📈 Cumulative Progress (Cycles 1-13) **Issues Linked to Epics by Epic Planning Supervisor:** - 3 new Epics created (#8136, #8137, #8231) - 46 child implementation issues created - 20+ new issues linked to existing Epics (Cycles 6-13) --- ## ⏭️ Next Cycle (Cycle 14) Plan 1. Continue monitoring for new issues needing Epic linkage 2. Check if any Epics are ready for closure 3. Evaluate v3.8.0 Epic structure when M1-M6 progress warrants it --- **Automated by CleverAgents Bot** Supervisor: Epic Planning | Agent: epic-planning-pool-supervisor ---
Owner

This is an old automation status ticket and has been superseded by new status tracking. Closing in favour of the current status tracking system.

This is an old automation status ticket and has been superseded by new status tracking. Closing in favour of the current status tracking system.
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#8286
No description provided.