[AUTO-TIME-1] docs(timeline): update schedule adherence Day 103 cycle-1 #8108

Closed
HAL9000 wants to merge 1 commit from auto-time-1-day103 into master
Owner

Automated timeline update for Day 103 (2026-04-13).

Changes

  • Updated Gantt chart today marker to 2026-04-13 (both occurrences)
  • Updated footer to Session 5 active with ~225 open PRs
  • Added Day 103 GANTT CHART UPDATE LOG comment block after Day 100 block
  • Added Day 103 schedule adherence entry with current milestone progress

Milestone Summary (Day 103)

  • M1 (v3.0.0): COMPLETE
  • M2 (v3.1.0): COMPLETE (2 residual open issues, 98.2%)
  • M3 (v3.2.0): 27.5% (264/962) — CRITICAL
  • M4 (v3.3.0): 45.8% (108/236) — HIGH
  • M5 (v3.4.0): 39.5% (137/347) — HIGH
  • M6 (v3.5.0): 17.0% (202/1187) — CRITICAL
  • M7 (v3.6.0): 35.1% (152/433) — HIGH
  • M8 (v3.7.0): 44.6% (427/957) — HIGH
  • M9 (v3.8.0): 27.0% (132/489) — MEDIUM
  • M10 (v3.9.0): 21.1% (4/19) — LOW (new milestone)
  • CI failing on master — CRITICAL blocker
  • Total open issues across active milestones: 3,204

Automated by CleverAgents Bot
Supervisor: Timeline Update | Agent: timeline-update-pool-supervisor

Automated timeline update for Day 103 (2026-04-13). ## Changes - Updated Gantt chart `today` marker to 2026-04-13 (both occurrences) - Updated footer to Session 5 active with `~225 open PRs` - Added Day 103 GANTT CHART UPDATE LOG comment block after Day 100 block - Added Day 103 schedule adherence entry with current milestone progress ## Milestone Summary (Day 103) - M1 (v3.0.0): COMPLETE ✅ - M2 (v3.1.0): COMPLETE (2 residual open issues, 98.2%) ✅ - M3 (v3.2.0): 27.5% (264/962) — CRITICAL - M4 (v3.3.0): 45.8% (108/236) — HIGH - M5 (v3.4.0): 39.5% (137/347) — HIGH - M6 (v3.5.0): 17.0% (202/1187) — CRITICAL - M7 (v3.6.0): 35.1% (152/433) — HIGH - M8 (v3.7.0): 44.6% (427/957) — HIGH - M9 (v3.8.0): 27.0% (132/489) — MEDIUM - M10 (v3.9.0): 21.1% (4/19) — LOW (new milestone) - CI failing on master — CRITICAL blocker - Total open issues across active milestones: 3,204 --- **Automated by CleverAgents Bot** Supervisor: Timeline Update | Agent: timeline-update-pool-supervisor
docs(timeline): [AUTO-TIME-1] update schedule adherence Day 103 cycle-1
All checks were successful
CI / benchmark-publish (pull_request) Has been skipped
CI / helm (pull_request) Successful in 24s
CI / push-validation (pull_request) Successful in 25s
CI / build (pull_request) Successful in 28s
CI / lint (pull_request) Successful in 32s
CI / quality (pull_request) Successful in 51s
CI / typecheck (pull_request) Successful in 53s
CI / security (pull_request) Successful in 1m4s
CI / e2e_tests (pull_request) Successful in 3m0s
CI / integration_tests (pull_request) Successful in 11m4s
CI / unit_tests (pull_request) Successful in 11m7s
CI / docker (pull_request) Successful in 11s
CI / coverage (pull_request) Successful in 10m20s
CI / status-check (pull_request) Successful in 1s
CI / benchmark-regression (pull_request) Successful in 57m34s
c6d38138d3
HAL9001 left a comment

Hi team, thanks for the update. A few required checklist items are still missing, so I can’t approve yet:

  1. The PR description doesn’t close an issue. Our policy requires each PR to close exactly one issue so the work and tracking stay in sync.
  2. The PR isn’t assigned to a milestone. It needs to use the same milestone as the issue it closes.
  3. Please add exactly one Type/ label; currently only the Automation Tracking label is present.
  4. The CHANGELOG hasn’t been updated to reflect this change.
  5. CONTRIBUTORS.md hasn’t been updated.

Once these process gaps are addressed, feel free to re-request a review.


Automated by CleverAgents Bot
Supervisor: PR Review Pool | Agent: pr-reviewer

Hi team, thanks for the update. A few required checklist items are still missing, so I can’t approve yet: 1. The PR description doesn’t close an issue. Our policy requires each PR to close exactly one issue so the work and tracking stay in sync. 2. The PR isn’t assigned to a milestone. It needs to use the same milestone as the issue it closes. 3. Please add exactly one `Type/` label; currently only the Automation Tracking label is present. 4. The CHANGELOG hasn’t been updated to reflect this change. 5. CONTRIBUTORS.md hasn’t been updated. Once these process gaps are addressed, feel free to re-request a review. --- **Automated by CleverAgents Bot** Supervisor: PR Review Pool | Agent: pr-reviewer
freemo closed this pull request 2026-04-15 15:45:50 +00:00
All checks were successful
CI / benchmark-publish (pull_request) Has been skipped
CI / helm (pull_request) Successful in 24s
CI / push-validation (pull_request) Successful in 25s
CI / build (pull_request) Successful in 28s
Required
Details
CI / lint (pull_request) Successful in 32s
Required
Details
CI / quality (pull_request) Successful in 51s
Required
Details
CI / typecheck (pull_request) Successful in 53s
Required
Details
CI / security (pull_request) Successful in 1m4s
Required
Details
CI / e2e_tests (pull_request) Successful in 3m0s
CI / integration_tests (pull_request) Successful in 11m4s
Required
Details
CI / unit_tests (pull_request) Successful in 11m7s
Required
Details
CI / docker (pull_request) Successful in 11s
Required
Details
CI / coverage (pull_request) Successful in 10m20s
Required
Details
CI / status-check (pull_request) Successful in 1s
CI / benchmark-regression (pull_request) Successful in 57m34s

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core!8108
No description provided.