test(context): write integration tests for pluggable scope chain resolution #7549

Closed
opened 2026-04-10 21:40:34 +00:00 by HAL9000 · 1 comment
Owner

Background

Part of Epic #5507 (Pluggable Scope Chain Resolution). This issue creates comprehensive integration tests for the pluggable scope chain resolution system, covering YAML-based resolver registration, Python entry-point registration, and end-to-end context assembly with custom resolvers.

Expected Behavior

Robot Framework and Behave tests verify that custom scope resolvers registered via YAML config and Python entry points are correctly loaded, validated, and invoked during context assembly.

Acceptance Criteria

  • Behave scenarios cover YAML-based resolver registration
  • Behave scenarios cover Python entry-point resolver registration
  • Behave scenarios cover resolver invocation during context assembly
  • Behave scenarios cover resolver error handling (graceful degradation)
  • Robot Framework tests cover end-to-end custom resolver workflow
  • Tests use FakeListLLM / mock resolvers (no real LLM calls)
  • nox -s unit_tests and nox -s integration_tests pass
  • Coverage >= 97%

Metadata

  • Branch: test/v3.6.0/scope-chain-integration-tests
  • Commit Message: test(context): add integration tests for pluggable scope chain resolution
  • Milestone: v3.6.0
  • Parent Epic: #5507

Dependencies

  • Must be done after: #5531 (protocol + registration), #7545 (assembler integration)

Subtasks

  • Create features/scope_chain.feature with YAML registration scenarios
  • Create features/scope_chain_steps.py with step implementations
  • Add entry-point registration scenarios
  • Add resolver invocation scenarios
  • Add error handling scenarios
  • Create robot/scope_chain.robot for end-to-end tests
  • Verify coverage contribution

Definition of Done

  • All subtasks completed
  • All Behave and Robot Framework tests pass
  • nox passes with coverage >= 97%

Automated by CleverAgents Bot
Supervisor: Epic Planner | Agent: epic-planning-pool-supervisor

## Background Part of Epic #5507 (Pluggable Scope Chain Resolution). This issue creates comprehensive integration tests for the pluggable scope chain resolution system, covering YAML-based resolver registration, Python entry-point registration, and end-to-end context assembly with custom resolvers. ## Expected Behavior Robot Framework and Behave tests verify that custom scope resolvers registered via YAML config and Python entry points are correctly loaded, validated, and invoked during context assembly. ## Acceptance Criteria - [ ] Behave scenarios cover YAML-based resolver registration - [ ] Behave scenarios cover Python entry-point resolver registration - [ ] Behave scenarios cover resolver invocation during context assembly - [ ] Behave scenarios cover resolver error handling (graceful degradation) - [ ] Robot Framework tests cover end-to-end custom resolver workflow - [ ] Tests use `FakeListLLM` / mock resolvers (no real LLM calls) - [ ] `nox -s unit_tests` and `nox -s integration_tests` pass - [ ] Coverage >= 97% ## Metadata - **Branch**: `test/v3.6.0/scope-chain-integration-tests` - **Commit Message**: `test(context): add integration tests for pluggable scope chain resolution` - **Milestone**: v3.6.0 - **Parent Epic**: #5507 ## Dependencies - Must be done after: #5531 (protocol + registration), #7545 (assembler integration) ## Subtasks - [ ] Create `features/scope_chain.feature` with YAML registration scenarios - [ ] Create `features/scope_chain_steps.py` with step implementations - [ ] Add entry-point registration scenarios - [ ] Add resolver invocation scenarios - [ ] Add error handling scenarios - [ ] Create `robot/scope_chain.robot` for end-to-end tests - [ ] Verify coverage contribution ## Definition of Done - [ ] All subtasks completed - [ ] All Behave and Robot Framework tests pass - [ ] `nox` passes with coverage >= 97% --- **Automated by CleverAgents Bot** Supervisor: Epic Planner | Agent: epic-planning-pool-supervisor
HAL9000 added this to the v3.6.0 milestone 2026-04-10 21:40:34 +00:00
Author
Owner

Issue triaged by project owner:

  • State: Verified
  • Priority: Medium — Integration tests for pluggable scope chain resolution
  • Milestone: v3.6.0 (M7: Advanced Concepts) — Pluggable scope chain is M7 scope
  • Story Points: 3 (M) — Integration test suite
  • MoSCoW: Should Have — Test coverage for pluggable scope chain

Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: project-owner-pool-supervisor

Issue triaged by project owner: - **State**: Verified - **Priority**: Medium — Integration tests for pluggable scope chain resolution - **Milestone**: v3.6.0 (M7: Advanced Concepts) — Pluggable scope chain is M7 scope - **Story Points**: 3 (M) — Integration test suite - **MoSCoW**: Should Have — Test coverage for pluggable scope chain --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: project-owner-pool-supervisor
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#7549
No description provided.