[AUTO-WATCHDOG] System Health Report (Cycle 1) #6252

Closed
opened 2026-04-09 18:14:51 +00:00 by HAL9000 · 0 comments
Owner

System Health Report 6c Cycle 1

Supervisor: System Watchdog (AUTO-WDOG)
Instance: watchdog-1
Timestamp: 2026-04-09T18:15:00Z
Reporting Period: Initial cycle

Supervisor Session Audit

All 16 supervisors confirmed running:

  • AUTO-IMP-SUP: implementor-pool
  • AUTO-REV-SUP: reviewer-pool
  • AUTO-UAT-SUP: tester-pool
  • AUTO-BUG-SUP: hunter-pool
  • AUTO-INF-SUP: test-infra-pool
  • AUTO-ARCH: architect
  • AUTO-EPIC: epic-planner
  • AUTO-HUMAN: human-liaison
  • AUTO-EVLV: agent-evolver
  • AUTO-GUARD: arch-guard
  • AUTO-SPEC: spec-updater
  • AUTO-BLOG: backlog-groomer
  • AUTO-DOCS: docs-writer
  • AUTO-TIME: timeline-updater
  • AUTO-OWNR: project-owner
  • AUTO-WDOG: system-watchdog

Master CI Health

Latest master commit (73e9087) CI status:

  • CI / lint: success
  • CI / typecheck: success
  • CI / security: success
  • CI / quality: success
  • CI / build: success
  • CI / unit_tests: success
  • CI / integration_tests: success
  • CI / e2e_tests: success
  • CI / docker: success
  • CI / helm: success
  • CI / push-validation: success
  • CI / coverage: pending (in progress)
  • CI / status-check: pending (waiting for coverage)

Branch Protection

Master branch protection active and correctly configured

  • Status checks required: 10 CI check families
  • Direct push blocked (whitelist: freemo only)
  • Outdated branch blocking: enabled

Quality Gate Compliance

No force_merge usage detected in recent session messages
No direct pushes to master detected
No type: ignore suppressions detected

PR Pipeline Health

  • 182 open PRs total
  • Notable: PRs #6213, #6189, #6119 missing labels and milestone (docs/timeline PRs)
  • PR #6180 has Needs Feedback label — awaiting human review (spec change)

Ticket State Observations

  • Issue #6235 [AUTO-DOCS] Documentation Report (Cycle 1) missing "Automation Tracking" label
  • Issue #6248 is a proposal tracking agents bypassing automation-tracking-manager

Implementation Orchestrator Activity

Active: fetching issues from v3.2.0 milestone, dispatching workers

  • Found 10 State/Verified issues ready for implementation
  • No Critical priority issues blocking lower milestones detected

Actions Taken

  • None required this cycle (system healthy)

Next Check

Cycle 2 in ~5 minutes


Automated by CleverAgents Bot
Supervisor: System Watchdog | Agent: system-watchdog

## System Health Report 6c Cycle 1 **Supervisor**: System Watchdog (AUTO-WDOG) **Instance**: watchdog-1 **Timestamp**: 2026-04-09T18:15:00Z **Reporting Period**: Initial cycle ## Supervisor Session Audit ✅ All 16 supervisors confirmed running: - AUTO-IMP-SUP: implementor-pool ✅ - AUTO-REV-SUP: reviewer-pool ✅ - AUTO-UAT-SUP: tester-pool ✅ - AUTO-BUG-SUP: hunter-pool ✅ - AUTO-INF-SUP: test-infra-pool ✅ - AUTO-ARCH: architect ✅ - AUTO-EPIC: epic-planner ✅ - AUTO-HUMAN: human-liaison ✅ - AUTO-EVLV: agent-evolver ✅ - AUTO-GUARD: arch-guard ✅ - AUTO-SPEC: spec-updater ✅ - AUTO-BLOG: backlog-groomer ✅ - AUTO-DOCS: docs-writer ✅ - AUTO-TIME: timeline-updater ✅ - AUTO-OWNR: project-owner ✅ - AUTO-WDOG: system-watchdog ✅ ## Master CI Health ✅ Latest master commit (73e9087) CI status: - CI / lint: ✅ success - CI / typecheck: ✅ success - CI / security: ✅ success - CI / quality: ✅ success - CI / build: ✅ success - CI / unit_tests: ✅ success - CI / integration_tests: ✅ success - CI / e2e_tests: ✅ success - CI / docker: ✅ success - CI / helm: ✅ success - CI / push-validation: ✅ success - CI / coverage: ⏳ pending (in progress) - CI / status-check: ⏳ pending (waiting for coverage) ## Branch Protection ✅ Master branch protection active and correctly configured - Status checks required: 10 CI check families - Direct push blocked (whitelist: freemo only) - Outdated branch blocking: enabled ## Quality Gate Compliance ✅ No force_merge usage detected in recent session messages ✅ No direct pushes to master detected ✅ No type: ignore suppressions detected ## PR Pipeline Health - 182 open PRs total - Notable: PRs #6213, #6189, #6119 missing labels and milestone (docs/timeline PRs) - PR #6180 has Needs Feedback label — awaiting human review (spec change) ## Ticket State Observations - Issue #6235 [AUTO-DOCS] Documentation Report (Cycle 1) missing "Automation Tracking" label - Issue #6248 is a proposal tracking agents bypassing automation-tracking-manager ## Implementation Orchestrator Activity ✅ Active: fetching issues from v3.2.0 milestone, dispatching workers - Found 10 State/Verified issues ready for implementation - No Critical priority issues blocking lower milestones detected ## Actions Taken - None required this cycle (system healthy) ## Next Check Cycle 2 in ~5 minutes --- **Automated by CleverAgents Bot** Supervisor: System Watchdog | Agent: system-watchdog
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#6252
No description provided.