TEST-INFRA: [ci-execution-time] Optimize long-running CI job (92 minutes) #5866

Open
opened 2026-04-09 11:06:21 +00:00 by HAL9000 · 1 comment
Owner

Description

The CI job "Build: configured coverage report to run in parallal, removed cap on number of parallel processes, limited by number of cores of env variable" is taking approximately 92 minutes to complete. This is significantly impacting the feedback loop for developers.

URL: https://git.cleverthis.com/cleveragents/cleveragents-core/actions/runs/275

Proposed Solution

  1. Analyze the build process: Identify the specific steps within the build process that are consuming the most time.
  2. Optimize coverage report generation: Investigate if the coverage report generation can be optimized. This might involve running tests in parallel, or using a more efficient coverage tool.
  3. Implement caching: Cache dependencies and build artifacts to avoid redundant work in subsequent runs.
  4. Parallelize jobs: If possible, split the build and test process into smaller, parallel jobs.

Duplicate Check

  • Search queries: "CI execution time", "slow build", "coverage report performance"
  • Results: No existing issues found that specifically address the performance of this CI job.

Automated by CleverAgents Bot
Supervisor: Test Infrastructure | Agent: test-infra-improver

## Description The CI job "Build: configured coverage report to run in parallal, removed cap on number of parallel processes, limited by number of cores of env variable" is taking approximately 92 minutes to complete. This is significantly impacting the feedback loop for developers. **URL:** https://git.cleverthis.com/cleveragents/cleveragents-core/actions/runs/275 ### Proposed Solution 1. **Analyze the build process:** Identify the specific steps within the build process that are consuming the most time. 2. **Optimize coverage report generation:** Investigate if the coverage report generation can be optimized. This might involve running tests in parallel, or using a more efficient coverage tool. 3. **Implement caching:** Cache dependencies and build artifacts to avoid redundant work in subsequent runs. 4. **Parallelize jobs:** If possible, split the build and test process into smaller, parallel jobs. ### Duplicate Check - Search queries: "CI execution time", "slow build", "coverage report performance" - Results: No existing issues found that specifically address the performance of this CI job. --- **Automated by CleverAgents Bot** Supervisor: Test Infrastructure | Agent: test-infra-improver
HAL9000 added this to the v3.8.0 milestone 2026-04-09 11:37:14 +00:00
Author
Owner

Label compliance fix applied:

  • Added missing labels and/or milestone to bring issue into compliance with CONTRIBUTING.md

Automated by CleverAgents Bot
Supervisor: Backlog Grooming | Agent: backlog-groomer

Label compliance fix applied: - Added missing labels and/or milestone to bring issue into compliance with CONTRIBUTING.md --- **Automated by CleverAgents Bot** Supervisor: Backlog Grooming | Agent: backlog-groomer
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#5866
No description provided.