docs: update timeline Day 99 (2026-04-09) #5782

Closed
opened 2026-04-09 09:26:00 +00:00 by HAL9000 · 1 comment
Owner

Metadata

  • Commit Message: docs(timeline): update schedule adherence Day 99 (2026-04-09)
  • Branch: timeline/day-99-2026-04-09-auto-time
  • Milestone: v3.5.0
  • Parent Epic: #5702

Background and context

docs/timeline.md is the living project schedule document. It must be updated daily with a new schedule adherence entry, an updated Gantt chart today is marker, and refreshed milestone completion summaries. Day 99 (2026-04-09) is the current date and requires its corresponding entry.

This work is already implemented in PR #5578 (docs(timeline): update schedule adherence Day 99 (2026-04-09)) on branch timeline/day-99-2026-04-09-auto-time. This issue exists to provide a proper tracked work item that the PR can close, ensuring the change is linked to the project's issue tracker and milestone.

Expected behavior

docs/timeline.md contains a complete Day 99 (2026-04-09) schedule adherence entry including:

  • A new ## Day 99 — 2026-04-09 schedule adherence section with:
    • Milestone forecast table (M3–M9 completion percentages and scope counts)
    • Track forecast table
    • Developer forecast table
    • Task inventory table
    • Story point allocation table
  • Gantt chart today is marker updated to 2026-04-09
  • Gantt chart footer and update log updated to Day 99
  • Current Status Summary section refreshed with latest metrics:
    • Open PRs: 1 → 50 (+49 new PRs opened by agents)
    • Open bugs: ~878 → ~3,113 (tripled — UAT pool filing spec compliance issues at high velocity)
    • Milestone completion percentages updated for M3–M9 (all dropped due to scope expansion from new issues)

Acceptance criteria

  • docs/timeline.md contains a ## Day 99 — 2026-04-09 schedule adherence entry
  • Gantt chart today is marker reads 2026-04-09
  • Current Status Summary reflects Day 99 metrics (open PRs, open bugs, milestone %)
  • PR #5578 is merged to master with a closing keyword referencing this issue
  • Commit message first line matches docs(timeline): update schedule adherence Day 99 (2026-04-09) exactly
  • Commit footer contains ISSUES CLOSED: #<this issue number>

Supporting information

  • Implementing PR: #5578docs(timeline): update schedule adherence Day 99 (2026-04-09)
  • Branch: timeline/day-99-2026-04-09-auto-time
  • Parent Epic: #5702[AUTO-TIME] Timeline Update (Cycle 1)
  • Key data points captured in PR #5578:
    • M3 (v3.2.0): 73% → 54% (245/455, scope expanded +135 issues)
    • M4 (v3.3.0): 67% → 54% (108/199, scope expanded +38 issues)
    • M5 (v3.4.0): 71% → 60% (130/215, scope expanded +32 issues)
    • M6 (v3.5.0): 29% → 20% (193/989, scope expanded +351 issues)
    • M7 (v3.6.0): 48% → 43% (150/347, scope expanded +35 issues)
    • M8 (v3.7.0): 47% → 46% (422/925, scope expanded +70 issues)
    • M9 (v3.8.0): N/A → 29% (129/440, new milestone now tracked)
    • Critical UAT bugs noted: #5467, #5479, #5489, #5506

Subtasks

  • Append Day 99 schedule adherence entry to docs/timeline.md
  • Update Gantt chart today is marker to 2026-04-09
  • Update Gantt chart footer and update log
  • Refresh Current Status Summary with Day 99 metrics
  • Verify PR #5578 has a closing keyword (Closes #<this issue>) in its description
  • Verify PR #5578 commit footer contains ISSUES CLOSED: #<this issue number>
  • Verify PR #5578 has Type/Documentation label and v3.5.0 milestone assigned
  • Confirm all CI checks pass on PR #5578
  • Merge PR #5578 to master

Definition of Done

This issue is complete when:

  • All subtasks above are completed and checked off.
  • A Git commit exists where the first line of the commit message is exactly docs(timeline): update schedule adherence Day 99 (2026-04-09), followed by a blank line and additional detail lines.
  • The commit is on branch timeline/day-99-2026-04-09-auto-time and submitted as PR #5578 to master.
  • PR #5578 description contains a closing keyword referencing this issue (e.g., Closes #<N>).
  • The commit footer contains ISSUES CLOSED: #<N> where <N> is this issue's number.
  • PR #5578 carries the Type/Documentation label and is assigned to milestone v3.5.0.
  • All automated CI checks (lint, typecheck, unit tests, integration tests, coverage ≥ 97%) pass on PR #5578.
  • PR #5578 is reviewed and merged to master.

Automated by CleverAgents Bot
Supervisor: Acting on behalf of: Human Request | Agent: new-issue-creator

## Metadata - **Commit Message**: `docs(timeline): update schedule adherence Day 99 (2026-04-09)` - **Branch**: `timeline/day-99-2026-04-09-auto-time` - **Milestone**: v3.5.0 - **Parent Epic**: #5702 ## Background and context `docs/timeline.md` is the living project schedule document. It must be updated daily with a new schedule adherence entry, an updated Gantt chart `today is` marker, and refreshed milestone completion summaries. Day 99 (2026-04-09) is the current date and requires its corresponding entry. This work is already implemented in PR #5578 (`docs(timeline): update schedule adherence Day 99 (2026-04-09)`) on branch `timeline/day-99-2026-04-09-auto-time`. This issue exists to provide a proper tracked work item that the PR can close, ensuring the change is linked to the project's issue tracker and milestone. ## Expected behavior `docs/timeline.md` contains a complete Day 99 (2026-04-09) schedule adherence entry including: - A new `## Day 99 — 2026-04-09` schedule adherence section with: - Milestone forecast table (M3–M9 completion percentages and scope counts) - Track forecast table - Developer forecast table - Task inventory table - Story point allocation table - Gantt chart `today is` marker updated to `2026-04-09` - Gantt chart footer and update log updated to Day 99 - Current Status Summary section refreshed with latest metrics: - Open PRs: 1 → 50 (+49 new PRs opened by agents) - Open bugs: ~878 → ~3,113 (tripled — UAT pool filing spec compliance issues at high velocity) - Milestone completion percentages updated for M3–M9 (all dropped due to scope expansion from new issues) ## Acceptance criteria - [ ] `docs/timeline.md` contains a `## Day 99 — 2026-04-09` schedule adherence entry - [ ] Gantt chart `today is` marker reads `2026-04-09` - [ ] Current Status Summary reflects Day 99 metrics (open PRs, open bugs, milestone %) - [ ] PR #5578 is merged to `master` with a closing keyword referencing this issue - [ ] Commit message first line matches `docs(timeline): update schedule adherence Day 99 (2026-04-09)` exactly - [ ] Commit footer contains `ISSUES CLOSED: #<this issue number>` ## Supporting information - **Implementing PR**: #5578 — `docs(timeline): update schedule adherence Day 99 (2026-04-09)` - **Branch**: `timeline/day-99-2026-04-09-auto-time` - **Parent Epic**: #5702 — `[AUTO-TIME] Timeline Update (Cycle 1)` - **Key data points captured in PR #5578**: - M3 (v3.2.0): 73% → 54% (245/455, scope expanded +135 issues) - M4 (v3.3.0): 67% → 54% (108/199, scope expanded +38 issues) - M5 (v3.4.0): 71% → 60% (130/215, scope expanded +32 issues) - M6 (v3.5.0): 29% → 20% (193/989, scope expanded +351 issues) - M7 (v3.6.0): 48% → 43% (150/347, scope expanded +35 issues) - M8 (v3.7.0): 47% → 46% (422/925, scope expanded +70 issues) - M9 (v3.8.0): N/A → 29% (129/440, new milestone now tracked) - Critical UAT bugs noted: #5467, #5479, #5489, #5506 ## Subtasks - [x] Append Day 99 schedule adherence entry to `docs/timeline.md` - [x] Update Gantt chart `today is` marker to `2026-04-09` - [x] Update Gantt chart footer and update log - [x] Refresh Current Status Summary with Day 99 metrics - [ ] Verify PR #5578 has a closing keyword (`Closes #<this issue>`) in its description - [ ] Verify PR #5578 commit footer contains `ISSUES CLOSED: #<this issue number>` - [ ] Verify PR #5578 has `Type/Documentation` label and `v3.5.0` milestone assigned - [ ] Confirm all CI checks pass on PR #5578 - [ ] Merge PR #5578 to `master` ## Definition of Done This issue is complete when: - All subtasks above are completed and checked off. - A Git commit exists where the **first line** of the commit message is exactly `docs(timeline): update schedule adherence Day 99 (2026-04-09)`, followed by a blank line and additional detail lines. - The commit is on branch `timeline/day-99-2026-04-09-auto-time` and submitted as PR #5578 to `master`. - PR #5578 description contains a closing keyword referencing this issue (e.g., `Closes #<N>`). - The commit footer contains `ISSUES CLOSED: #<N>` where `<N>` is this issue's number. - PR #5578 carries the `Type/Documentation` label and is assigned to milestone `v3.5.0`. - All automated CI checks (lint, typecheck, unit tests, integration tests, coverage ≥ 97%) pass on PR #5578. - PR #5578 is reviewed and merged to `master`. --- **Automated by CleverAgents Bot** Supervisor: Acting on behalf of: Human Request | Agent: new-issue-creator
HAL9000 added this to the v3.5.0 milestone 2026-04-09 09:28:28 +00:00
Author
Owner

Label compliance fix applied:

  • Added missing labels and/or milestone to bring issue into compliance with CONTRIBUTING.md

Automated by CleverAgents Bot
Supervisor: Backlog Grooming | Agent: backlog-groomer

Label compliance fix applied: - Added missing labels and/or milestone to bring issue into compliance with CONTRIBUTING.md --- **Automated by CleverAgents Bot** Supervisor: Backlog Grooming | Agent: backlog-groomer
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#5782
No description provided.