[AUTO-UAT-POOL] UAT Testing Report (Cycle 3) #5644

Closed
opened 2026-04-09 08:04:17 +00:00 by HAL9000 · 1 comment
Owner

UAT Testing Pool Status — Cycle 3

Agent: uat-tester (pool supervisor)
Instance ID: uat-pool-1
Cycle: 3
Status: Active
Master SHA: ee2024046f

Progress So Far

  • Cycle 1: 8 areas tested (v3.2.0–v3.7.0 core features)
  • Cycle 2: 8 areas tested (v3.6.0 advanced + v3.7.0 TUI)
  • Total: 16/36 areas tested (44%)
  • Total bugs filed: 1000+

Cycle 3 Feature Areas

Focusing on v3.0.0 and v3.1.0 foundational features:

v3.0.0 (M1: Minimal Local Source-Code Workflow)

  1. plan-lifecycle-core — plan use/execute/diff/apply full lifecycle
  2. git-worktree-sandbox — isolated working directory, changes dont affect original
  3. resource-management — git-checkout resource registration, project linking
  4. action-management — action create from YAML, persistence to SQLite
  5. cli-global-flags — global --format, --data-dir, --config-path flags

v3.1.0 (M2: Actor Compiler + Full LLM Integration)

  1. actor-system — actor YAML parsing, LangGraph StateGraph compilation
  2. mcp-adapter — MCP tool server discovery and connection
  3. validation-runner — required and informational validation execution

Worker Dispatch Plan (Cycle 3)

Dispatching 8 parallel workers:

  • Worker 1: plan-lifecycle-core (v3.0.0)
  • Worker 2: git-worktree-sandbox (v3.0.0)
  • Worker 3: resource-management (v3.0.0)
  • Worker 4: action-management (v3.0.0)
  • Worker 5: cli-global-flags (v3.0.0)
  • Worker 6: actor-system (v3.1.0)
  • Worker 7: mcp-adapter (v3.1.0)
  • Worker 8: validation-runner (v3.1.0)

Automated by CleverAgents Bot
Supervisor: UAT Testing | Agent: uat-tester

# UAT Testing Pool Status — Cycle 3 **Agent**: uat-tester (pool supervisor) **Instance ID**: uat-pool-1 **Cycle**: 3 **Status**: Active **Master SHA**: ee2024046ff9f8734596160fc06b6eaf42516437 ## Progress So Far - **Cycle 1**: 8 areas tested (v3.2.0–v3.7.0 core features) - **Cycle 2**: 8 areas tested (v3.6.0 advanced + v3.7.0 TUI) - **Total**: 16/36 areas tested (44%) - **Total bugs filed**: 1000+ ## Cycle 3 Feature Areas Focusing on v3.0.0 and v3.1.0 foundational features: ### v3.0.0 (M1: Minimal Local Source-Code Workflow) 1. plan-lifecycle-core — plan use/execute/diff/apply full lifecycle 2. git-worktree-sandbox — isolated working directory, changes dont affect original 3. resource-management — git-checkout resource registration, project linking 4. action-management — action create from YAML, persistence to SQLite 5. cli-global-flags — global --format, --data-dir, --config-path flags ### v3.1.0 (M2: Actor Compiler + Full LLM Integration) 6. actor-system — actor YAML parsing, LangGraph StateGraph compilation 7. mcp-adapter — MCP tool server discovery and connection 8. validation-runner — required and informational validation execution ## Worker Dispatch Plan (Cycle 3) Dispatching 8 parallel workers: - Worker 1: plan-lifecycle-core (v3.0.0) - Worker 2: git-worktree-sandbox (v3.0.0) - Worker 3: resource-management (v3.0.0) - Worker 4: action-management (v3.0.0) - Worker 5: cli-global-flags (v3.0.0) - Worker 6: actor-system (v3.1.0) - Worker 7: mcp-adapter (v3.1.0) - Worker 8: validation-runner (v3.1.0) --- **Automated by CleverAgents Bot** Supervisor: UAT Testing | Agent: uat-tester
Author
Owner

Cycle 3 Complete — Final Summary

All 8 workers have completed.

Completed Areas

  • ✓ plan-lifecycle-core (v3.0.0)
  • ✓ git-worktree-sandbox (v3.0.0)
  • ✓ resource-management (v3.0.0)
  • ✓ action-management (v3.0.0)
  • ✓ cli-global-flags (v3.0.0)
  • ✓ actor-system (v3.1.0)
  • ✓ mcp-adapter (v3.1.0)
  • ✓ validation-runner (v3.1.0)

Cumulative Progress

  • Cycles completed: 3
  • Feature areas tested: 24/36 (67%)
  • Total UAT bugs filed: 1000+ across all areas
  • Master SHA changed: a3762a4cc2 (new code merged)

Remaining Areas for Cycle 4

  • lsp-integration (v3.1.0)
  • tool-router (v3.1.0)
  • changeset-management (v3.0.0)
  • skill-registry (v3.1.0)
  • plan-state-machine (v3.0.0)
  • database-migrations (v3.0.0)
  • pydantic-domain-models (v3.0.0)
  • test-coverage-97pct (all milestones)

Closing this tracking issue. Cycle 4 will begin.


Automated by CleverAgents Bot
Supervisor: UAT Testing | Agent: uat-tester

## Cycle 3 Complete — Final Summary **All 8 workers have completed.** ### Completed Areas - ✓ plan-lifecycle-core (v3.0.0) - ✓ git-worktree-sandbox (v3.0.0) - ✓ resource-management (v3.0.0) - ✓ action-management (v3.0.0) - ✓ cli-global-flags (v3.0.0) - ✓ actor-system (v3.1.0) - ✓ mcp-adapter (v3.1.0) - ✓ validation-runner (v3.1.0) ### Cumulative Progress - **Cycles completed**: 3 - **Feature areas tested**: 24/36 (67%) - **Total UAT bugs filed**: 1000+ across all areas - **Master SHA changed**: a3762a4cc28b24dad667a304329cbfa258785a55 (new code merged) ### Remaining Areas for Cycle 4 - lsp-integration (v3.1.0) - tool-router (v3.1.0) - changeset-management (v3.0.0) - skill-registry (v3.1.0) - plan-state-machine (v3.0.0) - database-migrations (v3.0.0) - pydantic-domain-models (v3.0.0) - test-coverage-97pct (all milestones) Closing this tracking issue. Cycle 4 will begin. --- **Automated by CleverAgents Bot** Supervisor: UAT Testing | Agent: uat-tester
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#5644
No description provided.