TEST-INFRA: [ci-pipeline-design] Implement matrix strategy for multi-version and multi-OS testing #3717

Open
opened 2026-04-05 22:17:25 +00:00 by freemo · 0 comments
Owner

Metadata

  • Branch: ci/ci-pipeline-design-matrix-strategy
  • Commit Message: ci(pipeline): implement matrix strategy for multi-version and multi-OS testing
  • Milestone: Backlog
  • Parent Epic: #1678

Backlog note: This issue was discovered during autonomous operation
on milestone v3.8.0. It does not block milestone completion and has been
placed in the backlog for human review and future milestone assignment.

Description

The current CI pipeline (.forgejo/workflows/ci.yml) runs all tests on a single Python version (3.13) and a single operating system (Debian via python:3.13-slim). This limits our ability to catch compatibility issues that may arise from different Python versions or OS environments.

Proposed Solution

To improve our test coverage and ensure broader compatibility, we propose implementing a matrix strategy in our CI workflow. This would allow us to run the test suite across multiple combinations of Python versions and operating systems.

Example Matrix:

strategy:
  matrix:
    python-version: [3.11, 3.12, 3.13]
    os: [ubuntu-latest, windows-latest, macos-latest]

Subtasks

  • Identify the target Python versions and operating systems for the test matrix.
  • Update the .forgejo/workflows/ci.yml file to include a matrix strategy for the test jobs.
  • Ensure that the CI pipeline can successfully run the tests in all the matrix combinations.
  • Update any necessary documentation to reflect the new testing strategy.

Definition of Done

  • The CI pipeline is configured to run tests on multiple Python versions and operating systems.
  • The test suite passes in all the configured environments.
  • The changes are documented.
  • All nox stages pass
  • Coverage >= 97%

Duplicate Check

  • Search queries: "matrix", "multi-version", "multi-os", "python versions"
  • Results: 0 issues found for each query.
  • Conclusion: This is not a duplicate issue.

Automated by CleverAgents Bot
Supervisor: Test Infrastructure | Agent: ca-new-issue-creator

## Metadata - **Branch**: `ci/ci-pipeline-design-matrix-strategy` - **Commit Message**: `ci(pipeline): implement matrix strategy for multi-version and multi-OS testing` - **Milestone**: Backlog - **Parent Epic**: #1678 > **Backlog note:** This issue was discovered during autonomous operation > on milestone v3.8.0. It does not block milestone completion and has been > placed in the backlog for human review and future milestone assignment. ## Description The current CI pipeline (`.forgejo/workflows/ci.yml`) runs all tests on a single Python version (3.13) and a single operating system (Debian via `python:3.13-slim`). This limits our ability to catch compatibility issues that may arise from different Python versions or OS environments. ### Proposed Solution To improve our test coverage and ensure broader compatibility, we propose implementing a matrix strategy in our CI workflow. This would allow us to run the test suite across multiple combinations of Python versions and operating systems. **Example Matrix:** ```yaml strategy: matrix: python-version: [3.11, 3.12, 3.13] os: [ubuntu-latest, windows-latest, macos-latest] ``` ## Subtasks - [ ] Identify the target Python versions and operating systems for the test matrix. - [ ] Update the `.forgejo/workflows/ci.yml` file to include a matrix strategy for the test jobs. - [ ] Ensure that the CI pipeline can successfully run the tests in all the matrix combinations. - [ ] Update any necessary documentation to reflect the new testing strategy. ## Definition of Done - [ ] The CI pipeline is configured to run tests on multiple Python versions and operating systems. - [ ] The test suite passes in all the configured environments. - [ ] The changes are documented. - [ ] All nox stages pass - [ ] Coverage >= 97% ### Duplicate Check - **Search queries:** "matrix", "multi-version", "multi-os", "python versions" - **Results:** 0 issues found for each query. - **Conclusion:** This is not a duplicate issue. --- **Automated by CleverAgents Bot** Supervisor: Test Infrastructure | Agent: ca-new-issue-creator
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#3717
No description provided.