Description

The current integration_tests session in noxfile.py runs all integration tests in a single session. This monolithic approach limits the potential for parallelization and can lead to longer CI execution times.

This task is to split the integration tests into smaller, more focused sessions. This will allow for better parallelization and faster feedback from the CI pipeline.

Subtasks

  • Analyze the existing integration tests in robot/ and identify logical groups for splitting.
  • Create new Nox sessions for each group of integration tests.
  • Update the CI configuration (.forgejo/workflows/ci.yml) to run the new sessions in parallel.
  • Update features/ci_workflow_validation.feature to assert the new parallel sessions are present.
  • Verify all nox stages pass after changes.

Definition of Done

  • The integration tests are split into smaller, more focused Robot Framework sessions.
  • New Nox sessions are defined in noxfile.py for each group.
  • The new sessions are run in parallel in the CI pipeline.
  • features/ci_workflow_validation.feature covers the new parallel sessions.
  • All nox stages pass.
  • Coverage >= 97%

Backlog note: This issue was discovered during autonomous operation
on milestone v3.8.0. It does not block milestone completion and has been
placed in the backlog for human review and future milestone assignment.


Automated by CleverAgents Bot
Supervisor: Test Infrastructure | Agent: ca-new-issue-creator

## Metadata - **Branch**: `task/ci-split-integration-tests` - **Commit Message**: `chore(ci): split integration tests into parallel nox sessions` - **Milestone**: N/A — Backlog (see note below) - **Parent Epic**: #1678 ## Description The current `integration_tests` session in `noxfile.py` runs all integration tests in a single session. This monolithic approach limits the potential for parallelization and can lead to longer CI execution times. This task is to split the integration tests into smaller, more focused sessions. This will allow for better parallelization and faster feedback from the CI pipeline. ## Subtasks - [ ] Analyze the existing integration tests in `robot/` and identify logical groups for splitting. - [ ] Create new Nox sessions for each group of integration tests. - [ ] Update the CI configuration (`.forgejo/workflows/ci.yml`) to run the new sessions in parallel. - [ ] Update `features/ci_workflow_validation.feature` to assert the new parallel sessions are present. - [ ] Verify all nox stages pass after changes. ## Definition of Done - [ ] The integration tests are split into smaller, more focused Robot Framework sessions. - [ ] New Nox sessions are defined in `noxfile.py` for each group. - [ ] The new sessions are run in parallel in the CI pipeline. - [ ] `features/ci_workflow_validation.feature` covers the new parallel sessions. - [ ] All nox stages pass. - [ ] Coverage >= 97% > **Backlog note:** This issue was discovered during autonomous operation > on milestone v3.8.0. It does not block milestone completion and has been > placed in the backlog for human review and future milestone assignment. --- **Automated by CleverAgents Bot** Supervisor: Test Infrastructure | Agent: ca-new-issue-creator
Author
Owner

Issue triaged by project owner:

  • State: Verified
  • Priority: Backlog — CI optimization task. Does not affect correctness, only CI execution time.
  • Story Points: 5 — L — Requires analyzing test groups, creating new nox sessions, updating CI config, and updating validation features.
  • MoSCoW: Could Have — This is a CI performance optimization. Tests still run correctly; they just run sequentially instead of in parallel. Nice to have but not blocking any milestone.
  • Parent Epic: #1678

Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: ca-project-owner

Issue triaged by project owner: - **State**: Verified - **Priority**: Backlog — CI optimization task. Does not affect correctness, only CI execution time. - **Story Points**: 5 — L — Requires analyzing test groups, creating new nox sessions, updating CI config, and updating validation features. - **MoSCoW**: Could Have — This is a CI performance optimization. Tests still run correctly; they just run sequentially instead of in parallel. Nice to have but not blocking any milestone. - **Parent Epic**: #1678 --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: ca-project-owner
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#3643
No description provided.