TEST-INFRA: [ci-execution-time] Analyze and Optimize Test Data and Fixtures #2347

Open
opened 2026-04-03 15:15:24 +00:00 by freemo · 1 comment
Owner

Metadata

  • Branch: task/v3.8.0-ci-execution-time-optimize-test-data-fixtures
  • Commit Message: chore(ci): analyze and optimize test data and fixtures for execution time
  • Milestone: v3.8.0
  • Parent Epic: #1678

Summary

Slow test execution can often be attributed to inefficient test data setup, teardown, and fixture management. A thorough analysis of the test data and fixtures used in the unit_tests, integration_tests, and e2e_tests could reveal significant opportunities for performance improvements.

Subtasks

  • Profile the test suites to identify tests with slow setup and teardown times.
  • Analyze the test fixtures to identify any that are unnecessarily complex or inefficient.
  • Investigate the test data generation strategy and look for opportunities to optimize it.
  • Refactor slow tests and fixtures to improve their performance.
  • Run nox (all default sessions), fix any errors.
  • Verify coverage >= 97% via nox -s coverage_report.

Definition of Done

  • A performance analysis of the test data and fixtures has been completed.
  • Key performance bottlenecks in the test data and fixture management have been identified and addressed.
  • The overall execution time of the test suites is reduced.
  • All subtasks above are completed and checked off.
  • A Git commit is created where the first line matches the Commit Message in Metadata exactly.
  • The commit is pushed to the branch matching the Branch in Metadata exactly.
  • A Pull Request is submitted to master, reviewed, and merged before this issue is marked done.
  • All nox stages pass.
  • Coverage >= 97%.

Automated by CleverAgents Bot
Supervisor: Test Infrastructure | Agent: ca-new-issue-creator

## Metadata - **Branch**: `task/v3.8.0-ci-execution-time-optimize-test-data-fixtures` - **Commit Message**: `chore(ci): analyze and optimize test data and fixtures for execution time` - **Milestone**: v3.8.0 - **Parent Epic**: #1678 ## Summary Slow test execution can often be attributed to inefficient test data setup, teardown, and fixture management. A thorough analysis of the test data and fixtures used in the `unit_tests`, `integration_tests`, and `e2e_tests` could reveal significant opportunities for performance improvements. ## Subtasks - [ ] Profile the test suites to identify tests with slow setup and teardown times. - [ ] Analyze the test fixtures to identify any that are unnecessarily complex or inefficient. - [ ] Investigate the test data generation strategy and look for opportunities to optimize it. - [ ] Refactor slow tests and fixtures to improve their performance. - [ ] Run `nox` (all default sessions), fix any errors. - [ ] Verify coverage >= 97% via `nox -s coverage_report`. ## Definition of Done - [ ] A performance analysis of the test data and fixtures has been completed. - [ ] Key performance bottlenecks in the test data and fixture management have been identified and addressed. - [ ] The overall execution time of the test suites is reduced. - [ ] All subtasks above are completed and checked off. - [ ] A Git commit is created where the first line matches the Commit Message in Metadata exactly. - [ ] The commit is pushed to the branch matching the Branch in Metadata exactly. - [ ] A Pull Request is submitted to `master`, reviewed, and merged before this issue is marked done. - [ ] All nox stages pass. - [ ] Coverage >= 97%. --- **Automated by CleverAgents Bot** Supervisor: Test Infrastructure | Agent: ca-new-issue-creator
freemo added this to the v3.8.0 milestone 2026-04-03 15:15:28 +00:00
Author
Owner

Issue triaged by project owner:

  • State: Verified
  • Priority: Medium (confirmed)
  • Milestone: v3.8.0 (confirmed — CI infrastructure)
  • MoSCoW: Could Have — Test data and fixture optimization is a CI performance improvement. Not blocking any deliverables.
  • Parent Epic: #1678 (confirmed correct)

Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: ca-project-owner

Issue triaged by project owner: - **State**: Verified - **Priority**: Medium (confirmed) - **Milestone**: v3.8.0 (confirmed — CI infrastructure) - **MoSCoW**: Could Have — Test data and fixture optimization is a CI performance improvement. Not blocking any deliverables. - **Parent Epic**: #1678 (confirmed correct) --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: ca-project-owner
freemo removed this from the v3.8.0 milestone 2026-04-07 01:00:46 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#2347
No description provided.