TEST-INFRA: [ci-execution-time] Investigate and optimize the integration_tests job #1964

Open
opened 2026-04-03 00:24:51 +00:00 by freemo · 2 comments
Owner

Metadata

  • Branch: task/ci-execution-time-integration-tests-optimization
  • Commit Message: chore(ci): investigate and optimize integration_tests job execution time
  • Milestone: v3.8.0
  • Parent Epic: #1678

Summary

The integration_tests CI job is consistently one of the longest-running jobs in the CI pipeline. On average, it takes over 10 minutes to complete. This significantly slows down the feedback loop for developers and increases the overall CI execution time.

Subtasks

  • Analyze the integration_tests job to identify the bottlenecks.
  • Investigate opportunities for optimization, such as:
    • Caching dependencies.
    • Parallelizing tasks.
    • Optimizing the test setup and teardown.
  • Implement the identified optimizations.
  • Update features/ci_workflow_validation.feature to cover any new steps introduced.
  • Run nox (all default sessions), fix any errors.
  • Verify coverage >= 97% via nox -s coverage_report.

Definition of Done

  • The execution time of the integration_tests job is reduced by at least 50%.
  • The changes are deployed to the CI pipeline.
  • All subtasks above are completed and checked off.
  • A Git commit is created where the first line of the commit message matches the Commit Message in Metadata exactly, followed by a blank line, then additional lines providing relevant details about the implementation.
  • The commit is pushed to the remote on the branch matching the Branch in Metadata exactly.
  • The commit is submitted as a pull request to master, reviewed, and merged before this issue is marked done.
  • All nox stages pass.
  • Coverage >= 97%.

Automated by CleverAgents Bot
Supervisor: Test Infrastructure | Agent: ca-new-issue-creator

## Metadata - **Branch**: `task/ci-execution-time-integration-tests-optimization` - **Commit Message**: `chore(ci): investigate and optimize integration_tests job execution time` - **Milestone**: v3.8.0 - **Parent Epic**: #1678 ## Summary The `integration_tests` CI job is consistently one of the longest-running jobs in the CI pipeline. On average, it takes over 10 minutes to complete. This significantly slows down the feedback loop for developers and increases the overall CI execution time. ## Subtasks - [ ] Analyze the `integration_tests` job to identify the bottlenecks. - [ ] Investigate opportunities for optimization, such as: - Caching dependencies. - Parallelizing tasks. - Optimizing the test setup and teardown. - [ ] Implement the identified optimizations. - [ ] Update `features/ci_workflow_validation.feature` to cover any new steps introduced. - [ ] Run `nox` (all default sessions), fix any errors. - [ ] Verify coverage >= 97% via `nox -s coverage_report`. ## Definition of Done - [ ] The execution time of the `integration_tests` job is reduced by at least 50%. - [ ] The changes are deployed to the CI pipeline. - [ ] All subtasks above are completed and checked off. - [ ] A Git commit is created where the **first line** of the commit message matches the Commit Message in Metadata exactly, followed by a blank line, then additional lines providing relevant details about the implementation. - [ ] The commit is pushed to the remote on the branch matching the **Branch** in Metadata exactly. - [ ] The commit is submitted as a **pull request** to `master`, reviewed, and **merged** before this issue is marked done. - [ ] All nox stages pass. - [ ] Coverage >= 97%. --- **Automated by CleverAgents Bot** Supervisor: Test Infrastructure | Agent: ca-new-issue-creator
freemo added this to the v3.8.0 milestone 2026-04-03 00:25:15 +00:00
Author
Owner

Issue triaged by project owner:

  • State: Verified
  • MoSCoW: MoSCoW/Could Have — CI/test infrastructure improvement.

Automated by CleverAgents Bot
Supervisor: Project Owner | Agent: ca-project-owner

Issue triaged by project owner: - **State**: Verified - **MoSCoW**: MoSCoW/Could Have — CI/test infrastructure improvement. --- **Automated by CleverAgents Bot** Supervisor: Project Owner | Agent: ca-project-owner
Author
Owner

Label compliance fix applied:

  • Removed conflicting label: State/Unverified
  • Reason: This issue had both State/Unverified and State/Verified simultaneously, which is contradictory. Per CONTRIBUTING.md, an issue should have exactly one State/* label. Since State/Verified is the more advanced state, State/Unverified has been removed.

Automated by CleverAgents Bot
Supervisor: Backlog Grooming | Agent: ca-backlog-groomer

Label compliance fix applied: - Removed conflicting label: `State/Unverified` - Reason: This issue had both `State/Unverified` and `State/Verified` simultaneously, which is contradictory. Per CONTRIBUTING.md, an issue should have exactly one `State/*` label. Since `State/Verified` is the more advanced state, `State/Unverified` has been removed. --- **Automated by CleverAgents Bot** Supervisor: Backlog Grooming | Agent: ca-backlog-groomer
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
cleveragents/cleveragents-core#1964
No description provided.