[Automated] Product Build Session State #1261

Closed
opened 2026-04-02 04:36:12 +00:00 by freemo · 2 comments
Owner

Product Build Session State

This issue tracks the automated product build session state for CleverAgents Core. Each comment is a checkpoint that enables crash recovery and session resumption.

Product Vision

CleverAgents is a unified platform for orchestrating AI agents — a command center for complex, long-running autonomous tasks. The target is to fully implement through milestone v3.7.0 with production-level quality.

Detected Project State

  • Classification: In Progress
  • Spec: docs/specification.md exists (comprehensive)
  • Infrastructure: pyproject.toml, noxfile.py, CI pipeline, CONTRIBUTING.md all present
  • Source Code: Extensive codebase in src/cleveragents/
  • Milestones: v3.0.0 through v3.6.0+ defined
  • Issues: Hundreds of issues across milestones, many still open
  • PRs: Multiple open PRs awaiting review/merge
  • Tests: BDD (Behave), Integration (Robot), E2E tests in place
  • Coverage: ~97-98% maintained

Session Plan

  1. Reassign all open issues through v3.7.0 to freemo
  2. Review and merge existing open PRs
  3. Implement remaining open issues milestone by milestone
  4. Run quality checks after each milestone
  5. Final product verification
## Product Build Session State This issue tracks the automated product build session state for CleverAgents Core. Each comment is a checkpoint that enables crash recovery and session resumption. ### Product Vision CleverAgents is a unified platform for orchestrating AI agents — a command center for complex, long-running autonomous tasks. The target is to fully implement through milestone v3.7.0 with production-level quality. ### Detected Project State - **Classification**: In Progress - **Spec**: docs/specification.md exists (comprehensive) - **Infrastructure**: pyproject.toml, noxfile.py, CI pipeline, CONTRIBUTING.md all present - **Source Code**: Extensive codebase in src/cleveragents/ - **Milestones**: v3.0.0 through v3.6.0+ defined - **Issues**: Hundreds of issues across milestones, many still open - **PRs**: Multiple open PRs awaiting review/merge - **Tests**: BDD (Behave), Integration (Robot), E2E tests in place - **Coverage**: ~97-98% maintained ### Session Plan 1. Reassign all open issues through v3.7.0 to freemo 2. Review and merge existing open PRs 3. Implement remaining open issues milestone by milestone 4. Run quality checks after each milestone 5. Final product verification
Author
Owner

Session Started

  • Detected project state: In Progress
  • Starting from: Phase C (Iterative Build Loop — resume from open milestones)
  • Product vision: Complete implementation through v3.7.0 — full feature set including Plan Lifecycle, Projects & Resources, Actors/Skills/Tools, ACMS, Autonomy Hardening, and Post-MVP work
  • Timestamp: 2026-04-02T04:36Z

Key Findings

  • 20+ open PRs with zero reviewers assigned (critical process gap)
  • 3 unfixed bugs (#821, #932, #1024) tracked via @tdd_expected_fail
  • Milestones v3.2.0 through v3.6.0 all overdue
  • Coverage currently at ~97-98%
  • All project infrastructure in place (CI, nox, pyproject.toml, CONTRIBUTING.md)

Plan

  1. Review and merge existing open PRs
  2. Reassign all open issues to freemo
  3. Implement remaining issues milestone by milestone (v3.2.0 → v3.7.0)
  4. Quality checks after each milestone
  5. Final product verification

Checkpoint

  • Phase: C (Implementation)
  • Milestone: Starting with earliest incomplete milestone
  • Issues completed: TBD (assessing)
  • Issues remaining: TBD (assessing)
  • PRs merged: 0 (this session)
  • PRs open: 20+
  • Next action: Review open PRs and begin implementation
## Session Started - **Detected project state**: In Progress - **Starting from**: Phase C (Iterative Build Loop — resume from open milestones) - **Product vision**: Complete implementation through v3.7.0 — full feature set including Plan Lifecycle, Projects & Resources, Actors/Skills/Tools, ACMS, Autonomy Hardening, and Post-MVP work - **Timestamp**: 2026-04-02T04:36Z ### Key Findings - 20+ open PRs with zero reviewers assigned (critical process gap) - 3 unfixed bugs (#821, #932, #1024) tracked via @tdd_expected_fail - Milestones v3.2.0 through v3.6.0 all overdue - Coverage currently at ~97-98% - All project infrastructure in place (CI, nox, pyproject.toml, CONTRIBUTING.md) ### Plan 1. Review and merge existing open PRs 2. Reassign all open issues to freemo 3. Implement remaining issues milestone by milestone (v3.2.0 → v3.7.0) 4. Quality checks after each milestone 5. Final product verification ### Checkpoint - **Phase**: C (Implementation) - **Milestone**: Starting with earliest incomplete milestone - **Issues completed**: TBD (assessing) - **Issues remaining**: TBD (assessing) - **PRs merged**: 0 (this session) - **PRs open**: 20+ - **Next action**: Review open PRs and begin implementation
Author
Owner

🤖 Backlog Groomer Notice

This appears to be an automated session state tracking issue created by an AI agent, not a real work item. These issues clutter the backlog and should not be tracked as open issues.

Closing as this is not a valid backlog item — it's an automated agent session state tracker.

This comment was posted automatically by the backlog groomer.

🤖 **Backlog Groomer Notice** This appears to be an automated session state tracking issue created by an AI agent, not a real work item. These issues clutter the backlog and should not be tracked as open issues. Closing as this is not a valid backlog item — it's an automated agent session state tracker. *This comment was posted automatically by the backlog groomer.*
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#1261
No description provided.