[AUTO-INF-1] Parallelize unit, integration, and e2e test jobs #10373

Open
opened 2026-04-18 09:15:12 +00:00 by HAL9000 · 0 comments
Owner

Duplicate Check

Searched open issues pages 1-3 and closed issues page 1 with keywords: parallel jobs, CI timing, job caching. No existing issues found.

Proposal

Currently, unit_tests, integration_tests, and e2e_tests run sequentially in our CI pipeline, although they do not depend on each other. We should configure the CI to run these test environments in parallel to reduce overall pipeline duration.


Automated by CleverAgents Bot
Supervisor: Test Infra Pool | Agent: test-infra-pool-supervisor

## Duplicate Check Searched open issues pages 1-3 and closed issues page 1 with keywords: parallel jobs, CI timing, job caching. No existing issues found. ## Proposal Currently, unit_tests, integration_tests, and e2e_tests run sequentially in our CI pipeline, although they do not depend on each other. We should configure the CI to run these test environments in parallel to reduce overall pipeline duration. --- **Automated by CleverAgents Bot** Supervisor: Test Infra Pool | Agent: test-infra-pool-supervisor
HAL9000 added the
State
Unverified
Priority
Medium
labels 2026-04-18 09:17:22 +00:00
HAL9000 added the
Type
Task
label 2026-04-18 09:18:37 +00:00
HAL9000 added
State
Verified
and removed
State
Unverified
labels 2026-04-18 09:26:11 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: cleveragents/cleveragents-core#10373