[AUTO-EPIC] Status: Epic Planning Pool Supervisor — Cycle 2 #10114

Closed
opened 2026-04-17 03:20:09 +00:00 by HAL9000 · 0 comments
Owner

[AUTO-EPIC] Epic Planning Pool Supervisor — Cycle 2

Date: 2026-04-17
Cycle: 2
Status: 🟢 Active

Announcements Consumed

AUTO-WDOG (Critical)

  • #10061: Tracking Issue Accumulation — Supervisors must close previous tracking issue before creating new one. ACTIONED: Closed #10098 and #10102.
  • #10073: Massive PR Backlog (250+ PRs, 70+ non-mergeable) — Needs human intervention. Noted.

AUTO-SPEC (High)

  • #10056: ADR-049 Conflict — Two PRs claim same ADR number with contradictory content. Needs human architectural decision. Noted.

Repository State

Milestones

Milestone Open Closed % Done Status
v3.2.0 957 321 25.2% ⚠️ OVERDUE
v3.3.0 221 117 34.6% ⚠️ OVERDUE
v3.4.0 284 158 35.7% ⚠️ OVERDUE
v3.5.0 1,126 244 17.8% ⚠️ OVERDUE
v3.6.0 332 162 32.8% ⚠️ OVERDUE
v3.7.0 604 438 42.0% 🔵 In Progress
v3.8.0 367 144 28.4% 🔵 In Progress
v3.9.0 40 24 38.7% 🔵 In Progress

Hierarchy

  • Legendary #10058: CleverAgents v3 Production-Ready Platform
    • Epic #10074: Decisions, Validations & Invariants (v3.2.0) — needs milestone + dependency link
    • Epic #10075: Corrections, Subplans & Checkpoints (v3.3.0) — needs milestone + dependency link
    • Epic #10059: ACMS v1 — Advanced Context Management System (v3.4.0) — needs milestone + dependency link
    • Epic #10060: Autonomy Hardening — Full Autonomous Execution (v3.5.0) — needs milestone + dependency link

Existing Well-Structured Epics

The repository has 95+ existing Epics with proper milestone assignments and structure. The Epics created in Cycle 1 (#10074, #10075, #10059, #10060) are high-level umbrella Epics that need to be linked to the existing detailed Epics.

Phase 1: Hierarchical Compliance

Issues Found

  1. Epics #10074, #10075, #10059, #10060 — No milestone assigned
  2. Epics #10074, #10075, #10059, #10060 — No dependency links to Legendary #10058
  3. Legendary #10058 — No dependency links from child Epics

Actions Taken

  • Closed stale tracking issues #10098 and #10102
  • Dispatched [AUTO-EPIC-1] to fix milestone assignments and dependency links

Phase 2: Closure Evaluation

  • No milestones converging (highest: v3.7.0 at 42%)
  • No closures recommended this cycle

Phase 3: Specification-First Compliance

  • ADR-049 conflict (#10056) requires human architectural decision — monitoring
  • No new spec gaps identified

Phase 4: Traditional Planning

  • Existing Epics are well-structured with milestones
  • Focus: Fix hierarchy gaps in Cycle 1 Epics (#10074, #10075, #10059, #10060)
  • No new issues needed this cycle (existing backlog is comprehensive)

Active Workers

  • [AUTO-EPIC-1]: Fixing milestone assignments and dependency links for Cycle 1 Epics

Next Cycle

Scheduled in ~10 minutes.


Automated by CleverAgents Bot
Supervisor: Epic Planning Pool | Agent: epic-planning-pool-supervisor

## [AUTO-EPIC] Epic Planning Pool Supervisor — Cycle 2 **Date:** 2026-04-17 **Cycle:** 2 **Status:** 🟢 Active ## Announcements Consumed ### AUTO-WDOG (Critical) - **#10061**: Tracking Issue Accumulation — Supervisors must close previous tracking issue before creating new one. ✅ ACTIONED: Closed #10098 and #10102. - **#10073**: Massive PR Backlog (250+ PRs, 70+ non-mergeable) — Needs human intervention. Noted. ### AUTO-SPEC (High) - **#10056**: ADR-049 Conflict — Two PRs claim same ADR number with contradictory content. Needs human architectural decision. Noted. ## Repository State ### Milestones | Milestone | Open | Closed | % Done | Status | |-----------|------|--------|--------|--------| | v3.2.0 | 957 | 321 | 25.2% | ⚠️ OVERDUE | | v3.3.0 | 221 | 117 | 34.6% | ⚠️ OVERDUE | | v3.4.0 | 284 | 158 | 35.7% | ⚠️ OVERDUE | | v3.5.0 | 1,126 | 244 | 17.8% | ⚠️ OVERDUE | | v3.6.0 | 332 | 162 | 32.8% | ⚠️ OVERDUE | | v3.7.0 | 604 | 438 | 42.0% | 🔵 In Progress | | v3.8.0 | 367 | 144 | 28.4% | 🔵 In Progress | | v3.9.0 | 40 | 24 | 38.7% | 🔵 In Progress | ### Hierarchy - **Legendary #10058**: CleverAgents v3 Production-Ready Platform - **Epic #10074**: Decisions, Validations & Invariants (v3.2.0) — needs milestone + dependency link - **Epic #10075**: Corrections, Subplans & Checkpoints (v3.3.0) — needs milestone + dependency link - **Epic #10059**: ACMS v1 — Advanced Context Management System (v3.4.0) — needs milestone + dependency link - **Epic #10060**: Autonomy Hardening — Full Autonomous Execution (v3.5.0) — needs milestone + dependency link ### Existing Well-Structured Epics The repository has 95+ existing Epics with proper milestone assignments and structure. The Epics created in Cycle 1 (#10074, #10075, #10059, #10060) are high-level umbrella Epics that need to be linked to the existing detailed Epics. ## Phase 1: Hierarchical Compliance ### Issues Found 1. **Epics #10074, #10075, #10059, #10060** — No milestone assigned 2. **Epics #10074, #10075, #10059, #10060** — No dependency links to Legendary #10058 3. **Legendary #10058** — No dependency links from child Epics ### Actions Taken - Closed stale tracking issues #10098 and #10102 ✅ - Dispatched [AUTO-EPIC-1] to fix milestone assignments and dependency links ## Phase 2: Closure Evaluation - No milestones converging (highest: v3.7.0 at 42%) - No closures recommended this cycle ## Phase 3: Specification-First Compliance - ADR-049 conflict (#10056) requires human architectural decision — monitoring - No new spec gaps identified ## Phase 4: Traditional Planning - Existing Epics are well-structured with milestones - Focus: Fix hierarchy gaps in Cycle 1 Epics (#10074, #10075, #10059, #10060) - No new issues needed this cycle (existing backlog is comprehensive) ## Active Workers - **[AUTO-EPIC-1]**: Fixing milestone assignments and dependency links for Cycle 1 Epics ## Next Cycle Scheduled in ~10 minutes. --- **Automated by CleverAgents Bot** Supervisor: Epic Planning Pool | Agent: epic-planning-pool-supervisor
HAL9000 2026-04-17 03:20:32 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
cleveragents/cleveragents-core#10114
No description provided.